From: route@monster.com
Sent: Tuesday, March 22, 2016 11:00 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Gis Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Dalia Cordoba 2121 W Avenue K10, Lancaster, CA
93536 (213) 915-1091 - cordobadalia@hotmail.com More than 10 years of experience in roadway projects
with DOT and cities. Mayor areas of expertise include vertical and horizontal
alignments, plans production, quality control and compliance with clients
design specifications, such as DOT and AASHTO standards. SUMMARY OF PROFESSIONAL
RESPONSIBILITIES ►
Responsible for the production of
roadway plans, including horizontal and vertical alignment, cross sections,
typical sections and earthwork calculations. ►
Preparation of Plan and Profile sheets
for roadway design projects. ►
Project planning, management and
co-ordination with team members. ►
Preparation of Scoping Reports and 3R
Reports for the Department of Transportation. ► Develop and analyze roadway alternatives, investigating
special at-grade treatments and/or additional lanes, crash analysis and
responsible for documenting all existing conditions. ► Self-starter and has the ability to work with
minimal direction and in an interactive team atmosphere COMPUTER SKILLS
EDUCATION &CERTIFICATIONS MS
- Master of Science in Civil Engineering, Florida International University
(1996) BS
- Bachelor of Science in Civil Engineering, EAFIT University (1990) MOT-
Advanced Maintenance of Traffic Certification: Florida – No. BT-05-0079
(2012) E.I.T
– Engineering-in-Training (1998) Railway
Track Systems – The University of Wisconsin – September 2009 PROFESSIONAL EXPERIENCE Infrastructure
Engineers (IE) - from 01/2015 to
present Associate
Engineer responsible for supporting the Civil Engineer department with the
Capital Improvement Projects using Civil 3D. ►
Road Improvements along Los Flores Boulevard,
Linden Street, Virginia Avenue and Elmwood Street in the City of Lynwood, CA.
Improvements included new curb and gutter, replacement of sidewalk, driveway
reconstruction and new ADA ramps. I was the engineer responsible of preparing
plan and profile sheets, typical sections, cross sections and pavement
markings using Civil 3D. Along with prepareing cost estimates and assist in
the coordination of the Community Meetings for the city. ►
Road Improvements along Redwood Street
in the city of Montebello, CA. Engineer responsible of preparing the plan
improvement sheets, cost estimate and assist in the preparation of the
specifications for the city. Public Works Department– City of Lancaster, California (Internship)
from 10/2013 to 02/2014 Engineering Group of Miami, (EGM) from 01/2010 to 10/2013 ► Responsible for take-off
quantities, quantity revisions and earthwork calculations for the I-595
Express Lanes project in Broward County, Florida for “Ranger Construction
Industries”. ► Responsible for developing roadway
geometric improvements, intersection analysis using “Autorun” and
construction cost estimates along “Old Cutler Road and NW 36th Street in Miami-Dade County. This
project was part of a Congestion Management Process Strategies conducted by
the Metropolitan Planning Organization in Miami-Dade County. Gannett Fleming, Miami, Florida from 01/ 2002 to 01/ 2010 ►
Assistant Track Engineer – Assistant Track Engineer for the South Florida
East Coast Corridor (SFECC) Alternative Analysis Study. The 85-mile corridor
is centered along the existing Florida East Coast Railway from the
Government Center in downtown Miami to Indiantown Road in Palm Beach, Fl. It
consists of 264 grade crossings with 17 waterway crossing and 64 proposed
station stops. Responsibilities included the development of vertical and
horizontal alignment and speed curve evaluation. Develop track typical
sections, station site layouts including separate station tracks. Prepare
right-of-way inventory and investigations using GIS, Microstation and Aerial Photographs
and the preparation of the plan and profile sheets for the entire corridor
using Inroad-Track. ►
Assistant Track engineer – Assistant track engineer for the “Miami Streetcar
Alternative Analysis” project in Miami, FL,City of Miami. Engineer
responsible for assisting with the development of an alternatives analysis
study for a proposed streetcar service from downtown Miami to redeveloping
areas. The study included identifying the purpose and need, developing
proposed alignment alternatives, and creating plan sheets. A public
involvement process assisted in the identification of a locally preferred
alternative. The project involved coordinating work efforts with the
City and the Florida Department of Transportation, both of which are funding
agencies. ►
Assistant Project Engineer – Project Engineer responsible for the preparation
of scoping reports. The scoping report included the documentation of
all existing physical features, data on existing structures, design controls
and standards, safety analysis and related recommendations. Responsible for
the Engineering Report, roadway alternatives, project layout, potential
design exceptions/variations and cost estimates for the proposed
recommendations. ►
Assistant Project Engineer for
PD&E’s and 3R Reports -
Responsibilities included developing alternatives, including analyzing
alternate corridors and investigating special at-grade treatments and/or
additional lanes, responsible for documenting all existing conditions.
Responsible for the variance and exception packages and project plans. HNTB Corporation(Miami, Florida) from 06/ 1994 to 01/ 2002 Engineer II responsible
for supporting the Roadway Department with highway design projects,
preparation of project development and environmental studies and
proposals. ►
Engineer responsible for the production
of highway plans, including vertical and horizontal alignment, cross sections
and typical sections for the I-95 (S.R. 9) High-Occupancy Vehicle (HOV) Lane
Widening and Reconstruction project in Boynton Beach, FL for the Florida
Department of Transportation. ►
Engineer responsible for the
preparation of different roadway alternatives, access management analysis,
engineering reports and cost estimates for the Project Development and
Environmental Studies for the Florida Department of Transportation. ►
Engineer responsible for post design
services for the S.R.826/Palmetto Expressway project in Miami-Dade-County for
the Florida Department of Transportation. ►
Engineer responsible for the design of
turn lanes for all intersections, creation of plans and profiles sheets,
typical sections, production of final plans, and the preparation of cost
estimates for NW 87th Avenue Design Project in Miami, FL, Miami-Dade County
Public Works Department. This project consisted of widening two existing
lanes to four lanes between NW 138th Street and NW 151st Street. REFERENCES Ray
Hunt, Department of Public Works,
City of Lancaster, CA. (661)915-6860. rhunt@cityoflancasterca.org. Michael
Hern, PE, Engineer at Gannett Fleming Transit & Rail
Systems. (610) 650-8101. mhearn@gfnet.com. Jose
E. Clavell, P.E., Director of
Planning and Project Development, Gannett Fleming Inc.,Miami, Fl.
Phone:(786)845-9540, jclavell@gfnet.com 1
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|