From: route@monster.com
Sent: Thursday, September 10, 2015 3:44 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DAVID
J. CISNEROS 6925
Loma Vista Hesperia,
California 92345 (760)
947-8776 Hm (310)350-5820
Cell dcisneros6925@yahoo.com 4/02 to 12/11
Greenfield Communications, Inc.
34112 Violet Lantern Suite C
Dana Point, CA 92629 Director of Construction: Responsibilities
are assignment and scheduling of construction crews and sub-contractors on
multiple Greenfield Low Voltage, FTTH, and Access Control/ Security
projects. In this position lead generation and contract negotiations
are essential to bring new business to Greenfield Communications. In
addition, the Director of Construction is responsible for all safety policies
and procedures for the company along with emergency dispatch.. Having a
strong background in fiber optics in a necessity to understand and work on
site as needed. Management of all onsite Communications Technicians
requires a deep knowledge and understanding of Greenfield Communication’s
main service of fiber optics. As Director of Construction I was responsible
for generating and estimating New Business in OSP projects and or Structured
Cabling projects. This position also required me to purchase all materials
for all projects, project cost evaluations, and Change orders associated with
the project. 8/99 to
4/02
Independent Contractor
Hesperia, CA 92345 Fiber Optic Splicer:
An independent contractor for fiber optics includes such responsibilities as
fiber splicing, termination, and testing for numerous companies. This
position gives a deep understanding of how fiber is placed in different
locations under different circumstances. The work done on an
independent basis was throughout all of California and parts of Texas.
A strong background in fiber is required in order to maintain business
relationships with clients. Cities such as Hollister, Gilroy, and Porterville
are examples of the work performed. 6/98 to
8/99
Continental Optronics
San Pedro, CA Project Manager:
This position included direct involvement with specialty projects for Cal
Trans and CATV rebuild projects in Southern and Northern California. The
plans included highways and installing fiber in the city of Monterey.
The Project Manager was in charge of all supervision for work crews in
outside plant construction. The construction included both copper
splicing and fiber optic splicing. 6/97 to
6/98
Quality Cabling Solutions
Ontario, CA Operations Manager: Main
responsibilities lied in assignment, scheduling, and management of multiple
installation crews at project sites. The Manager’s task included LAN
cabling installation of fiber optic and coaxial placement. Testing of
all systems to EIA/TIA standards was an essential part of the Manager’s work
load. In addition supervision of work breakdown structure, job cost
summaries, and change orders were a part of the assigned tasks to the
Operations Manager. 2/96 to
6/97
Voltel Con
Corona, CA Fiber Optic
Technician/Supervisor: The Fiber Optic Technician and Supervisor
maintained all of the projects west of the Mississippi to the Pacific Rim.
The position involved fiber splicing and terminations in addition to
supervising fiber crews. 6/95 to
2/96
Continental Optronics
San Pedro, CA Site Forman/Fiber Splicer: Responsible
for assignment and scheduling of crews at multiple sites. The task load
included all aspects of fiber splicing, termination, and testing. All work was
outside plant construction that was overseen by the Foreman. 2/95 to
6/95
CRF Integrated Solutions
Ontario, CA Site Forman/Cable Splicer:
The responsibilities included for the Site Foreman/Cable Splicer was the
scheduling and assignment of multiple installation crews at projects sites.
The crews were in charge of all LAN cabling testing, trouble shooting, and
turn up of systems. 6/94 to 2/95
Cable Exchange, Inc.
Santa Ana, CA
Project Manager: The
Project Manager at Cable Exchange was responsible for assignment, and
scheduling of the crews at project sites. The duty of quality control
included LAN cabling, outside plant placement and construction of copper
cable. The development of work breakdown structure, cost summaries and change
orders were also responsibilities of the Project Manager. 2/90 to
6/94
EBC Integrated Solutions
Ontario, CA Journeyman Cable
Splicer/Forman/Estimator: EBC Integrated Solutions employed the
Journeyman Cable Splicer through an acquired company called KV TELCOM Inc.
Employment as a Journeyman Cable Splicer on outside plant work orders for GTE
and Pacific Bell followed shortly after. This role was then graduated
to the position of Forman. The Foreman’s duty involved directly
supervising a crew of cable splicers and their scheduling. The next
promotion to the Estimator position included estimating all splicing
functions of work orders. 10/88 to
2/90
Harris Mc Burney Company
Pomona, CA
Apprentice Cable
Splicer/Journeyman Cable Splicer: The field of cable splicing was
learned as an apprentice while employed at Harris McBurney Company. In
the duration of employment, a promotion to Journeyman was achieved.
This position included being capable of completing both “C” and “M” style
work orders for outside plant construction. 2/87 to
9/88
Bank of America
Palm Springs, CA Customer Service
Representative: The responsibilities in this role included
supplying above satisfactory levels of customer service to all Bank of
America customers. This role trained and strengthened proper
professional etiquette in a business environment. MILITARY SERVICE 1/83 to
2/87
Combat Signaler/Communication Security Clerk
Procurement of Secret and Top Secret Material for Telecommunications TRAINING: SIECORE TR-07-S
FIBER OPTIC INSTALLATION AND SPLICING LAN,
BULIDING AND CAMPUS APPLICATION.
ETAC Confined Space Training
CommScope, Uniprise Certified Installer |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|