From:                              route@monster.com

Sent:                               Thursday, September 10, 2015 3:48 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Melvin Walker 

Last updated:  05/14/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Anchorage, AK  99501
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Melvin Walker

Resume Value: fid3yxhuifb7q8ux   

  

 

Melvin Walker

945 Cherry St.

Anchorage, Alaska

Melvinwalker323@yahoo.com

907-351-7113


 

Experience:  

 

T-Mobile (Nokia Rural)

 

02/2014 – 03/2015

 

Lead BTS Engineer

2G/4G Shared 1900 (0C Configuration) LTE/GSM1900-MULTIRADIO-002-FLXTMO_C&I_A-USA | Flexi LTE Multi Radio BTS Commissioning and Integration for T-Mobile RA Expansion

Commissioning, integrating, System verification & acceptance for Nokia BTS (Flexi platform) Network Element. Develop and maintain BTS project competence, process, and documents for deployment. Able to perform advance troubleshooting, able to follow NSN NED documentation and independently resolve project issues. Deep understanding Antenna Line configuration (MHA/RET) and connectivity as well as Flexi BTS Feature set ( Rx diversity / Antenna Line sharing) Coordinate actions and investigation of technical Issues between Customer, regional management, tier2/tier3/ Product Line support teams. Provide support to customers for O&M of RAN Network elements including competence transfer. Able to perform on Roof TOP Field Cell site & RRU implementation. Support Customer Lab for SW/ HW New Feature verification and validation. Ensure quality customer satisfaction survey targets and carry end to end RAN support function. Work as Project Support Engineer for atomization of the process and improve in efficiency & execution of the task.

 

 

ComForce

 

10/2013 – 02/2014

 

Project Manager

Provided work direction and guidance to project team while managing activities associated with projects that are both simple and complex in nature. Manage the design, development and revision of project plans.  Review complex data to define and assign project tasks; create and deliver presentations on project goals and plans. Work with users/clients/stakeholders on project priority, scope and delivery; Influence and negotiate w/all levels of management regarding project goals and needs; Negotiate and manage outside vendors.  Monitor and project status and result and communicate accordingly. Consult/interact with other departments and partners and/or external sources to gather data and accomplish task.

 

 

T-Mobile (Contract)

 

04/2013 – 10/2013

 

Project Manager - Provision II – Consultant
As a Project Manager my responsibilities included conducting site surveys on new and existing GSM, 4G, LTE sites, writing and submitting firm price quotes, requesting and monitoring funding approval for awarded projects, monitoring the finances on approved projects, kicking off and scheduling all approved projects with the customer, determining manpower requirements, assigning required engineers, installation/test crews and sub-contractors, defining engineers, installation/test crews and sub-contractor roles, negotiating and controlling scheduling for engineers, installation/test crews and sub-contractors, arranging travel as required to deploy workforce, arranging shipping as required to deploy equipment, materials and tools, conducting on-site project meetings at the start of all projects, monitoring and resolving any/all issues with engineers, installation/test crews and sub-contractor schedules, re-scheduling as required with the customers, engineers, installation/test crews and sub-contractors in order to meet negotiated completion dates, completing on-site in progress quality control audits, coordinating and submitting all completion notices, test records, as-built drawings and any customer specific documentation required, and closing funding sources upon project completion. Additional duties included the supervision of time and expense employees working on various customer accounts and recruiting/interviewing candidates required for additional head count and/or special projects. Planned and designed wireless telecommunication projects, which included project survey, feasibility report writing, technical specification, and detail project design documents. Provided cross functional team training, coaching and mentoring. Implemented Phase II planning for E911compliancy requirements, Managed budget, schedule, resources, and specifications / scope of work. Managed project expenses / cost to ensure compliance within project budget.

 

GCI (contract)

 

05/2012 – 03/2013

 

RF Tech

Install the IDB by OMT - Analyzing the problems that occurred in Node B especially for the Corrupted CV’s and script mismatch from RBS to RNC. Closely coordinate with RNC to troubleshoot and loading carriers to make the site on air. Install Surge Arrestors and Ground. Install Pwr Cables for Node B (Label and Dress).Install Pwr Cables for Telco Rack (Label and Dress).Install Ground Cable for Node B (Label and Dress).Install T1 Cable (Label and Dress)- Terminate all the T1s to the OVP-Install DC Breakers for Node B (4x).Install RF Jumpers utilizing co-site solution. Sweep RF Jumpers .Label and Dress RF Jumpers. Download commissioning script to NodeB. Set DXU in local mode -Repair and checking E1 traffic routing - sweep tests-Ability to understand, operate, calibrate, and interpret the test results for the various test equipment such as: T1 tester, Power meter,  Removal of old BTS/Radio/Antenna and installing new ones and have a knowledge in installation of telecommunications equipment (ISDN, DS1, analog,..). DUW 30 Install and Integration Running Power and Powering Cabinet Installation and Integration Install UMTS / 6102 Installation and Integration HSPA+/LTE/UMTS/GSM 6601(mini cell site) Installation and Integration UMTS
2106 Installation and Integration Install and Integration Install RF cables
CBU Un-Install and Install / Rollbacks T1 Adds / TX Adds / RAX Adds / ET-MFX
HSPA and HSPA+ Create CV, Updates, FTP, Cesar FTP

 

T-Mobile

 

09/2011 -04/2012


Position: Wireless Engineer

Duties: Configuration of electronic cross-connects, T-berd testing of T-1s for DSO. Installation of T-Server applications with UNIX platform. Installation and some integration of BTS Ericsson 2106, 3106, 3206, 2109, 2308, 2206, 6601, and 6201 *GSM, UMTS, Radio Base Stations. Integration preformed with OMT program for 1x2, 2x1, 2x6, 3x4 configurations for T1. T1 cross-connects through E-911 CSU. Installation of and commissioning of E-911 frame relay systems, i.e. Andrew Geometrix Wireless Location Sensors, True Position LMU's, Carrier Access Flexmasters, Pathmasters, ADC Datasmart Kentrox. 3-G multiport T1 cross-connect, DSU,CSU within Ericsson 2G GSM networks. Installattion for AAV install 7705 Alcatel Lucent, NID (JDSU), EFX card, Connecting the UMTS and GSM cabinets.

 

 

AT&T

 

09/2010-06/2011

 

Position: Wireless Engineer

 

Duties: Operations and Maintenance of Radio Base Station alarms with OMT program, and troubleshooting E-911 frame relay. Integration of Ericsson 2106 2206, Radio/Cabinet Harvest. T1 configuration, integration, circuit identification tests, Installation Data configurations for DXU and dTRU's Ericsson 850 and 1900. E-911 installation and configuration. Troubleshooting of Radio Base stations faults. Clearing of faults for Radio Base Stations with thorough fault probe through Installation Data Base. Launching DXU's and dTRU's with into fully operational states with Ericsson OMT programs. Integration of Ericsson GSM and TDMA for RF connectivity. Diplexer and Multiplexer configuration of RF signal. Channel addition and Cascades of Multi Radio Base Station configurations for timeslot share of T1 transmissions.
 

 

 

 

Impact Solution (contract company)
Verizon


06/2007-06/2009

Position: Design/Field Engineer

Duties: Network Engineering of Outside Plant (Residential and Business)
locations for FTTCS,FTTH, FTTB, FTTN, FTTCab implementation. BTSCad, ARES, MS Excel, MS Word, Adobe design of FTTCS,FTTN, FTTCab procedures (Loop Identification, bridge tap removal). OSP Design of Cable Routes, MDU’s, MTU’s using FEI reports, Terminals, Modification of  records with BTSCad . Cost Estimation of Construction Engineering for database records (Trenching,                                              Cable Splicing, DSL ,BTSCAD, LFACS, OSPCM F2 Conditioning DS1,  DS3 Updates and Design. Testing, Field Inspection). ARES Plant Locations Records
 

 

 

AT&T

06/2004-4/2007

Position: Design Engineer

Duties: OSP, FTTCS/FTTN/FTTP/FTTCab construction drawing preparation, field work, field note preparation (Measuring aerial, buried, Conduit/Manhole systems Plowing/Trenching/Directional drilling), preparing permits,                                                        doing make-ready, pole inventories. ISP Network Design of Fiber Optics infrastructure for service network stations, network implementation. Testing of OSP Fiber cable with OTDR. Installation of LAN/WAN Fiber Optic cabling for ISP, DSL, Wireless Services. Installation, Termination and Splicing of LAN/WAN Fiber Optic cabling in. (Horizontal, Backbone). Performance of Fiber Optics Mechanical and Fusion splicing (Multimode, Single mode) for network
attenuation FTTP. Included aerial, buried and underground pathways. Termination
of Fiber Optic (Multimode, Single mode) service stations and terminal cabinets
(SC, ST, Air-Blown). Testing of Fiber Optic cabling with Optical Time Domain
Reflectometers for Db loss and attenuation. Configuration of PC Data exchange
of Power meters, and Certification testers for UTP, and Optical testing
results. Termination of UTP cabling (T1, Category 3, 5, 5e, 6), and PA cabling
with EIA/TIA cabling standards. Termination of UTP stations and terminal
cabinets with 8-position modular jacks, RJ11, RJ45 connectors and 24, 48 port
patch panels. Termination of PA cabling to Nortel Phone systems, and internal
and external speakers. Termination of PA cabling to 10Base-T 66-Blocks for
end-to-end attenuation. Termination of PA cabling with RJ-11, RJ-45 modular
jacks to main Public Address System. Testing of Fiber Optic and UTP cabling
with certification testers according to EIA/TIA, IEEE standards. Configuration
of 100BASE-TX, 100BASEFX media converters and switches for Ethernet attenuation
and Internet access. Testing of PA cabling with Main Public Address System
configuration components. Troubleshooting 3600, 6000 series Cisco IP/DSL
switches for MDI/MDIX auto sensing, and 100BASE-TX to 100BASE-FX connectivity
of media conversion.

Termination of Single mode and Multimode Fiber Optic cabling with SC, ST, FC
connectors. Mechanical and Fusion splicing of OSP and ISP Fiber.
Installation of Fiber cabling in Light Integrated Units, Distribution Unit.
Installation of copper network cabling (Category 3, 5,5e, 6) with RJ-45, RJ11
units.

Matrix Industries


05/2001-06/2004

Position: Wireless/Field Engineer

Duties: Installation and Integration of Ericsson 2106,2206, 2250 (HCHC), Nokia                                                          Radio Base Stations. T1 configuration, integration, circuit identification tests,                                                                                DSO tests, Loopback tests. Installation Data Base configurations for DXU                                                                                     and dTRU's Ericsson 850 and 1900. Installation and Termination of                                                                                                      Fiber Network Cabling in Main Frame and Intermediary Distribution                                                                                           Frames for ISP design. Installation of Fiber Optic, UTP, T1, cabling in Main,
Intermediary, and Local Distribution frames. Termination of
horizontal, backbone fiber optic cabling with SC connectors.
Installation of horizontal and backbone fiber in LIU terminals.
Termination of Category 3, 5, 5e, 6 cabling with modular jacks, and
110, 10 BASE-T 66 blocks. Testing of Fiber Optic cabling with
certification testers for end to end attenuation and decibel loss.
Testing of UTP cabling with certification testers for wire map and
end to end attenuation. Testing of Fiber Optic cabling with
certification testing with Optical, Time, Domain Reflect meters for
db loss and length. Configuration of RS232 ports for PC data
exchange. Installation of pathways of raceway and rigid, emt conduit.
Raceway pathways included 700, 2400, 4000 series. Installation of
1/2, 3/4, 1, 2 inch rigid and emt conduit

Termination of Fiber Optic cable SC and SC connectors.

Fusion and mechanical splicing of network cable within local area network.
 

BA Business/Marketing
Certifications: AT&T *ARES (Automated Records
Engineering System)
Microsoft Auto-CAD
Fiber Optics Network Design (Berk Tek, Corning)

References: Available Upon Request

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

BTS Engineer

NSN T-Mobile

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

RF Wireless Engineer

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Telecommunications Services
Engineering Services

Occupation:

Engineering

·         Electrical/Electronics Engineering

·         General/Other: Engineering

·         RF/Wireless Engineering

 

Target Locations:

Selected Locations:

US
US-AK-Anchorage

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Fluent