From:                              route@monster.com

Sent:                               Thursday, September 10, 2015 3:48 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Ronald Del Rosario 

Last updated:  08/17/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

2nd Flr. Room 201 Rashid Lootah Bldg.
  
AE

Mobile: +971551768152   
aldron_dr66@yahoo.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Mr. Ronald S. Del Rosario

Resume Value: qa5hd45tfyx879sv   

  

 



Ronald S. Del Rosario                                         

GPON LAN Technician III Fiber Optics

Room 309 3rd Flr. Al Attar Plaza 1 Bldg - Dubai

aldron_dr66@yahoo.com +971551768152

                                                                                                                          CAREER OBJECTIVE

To gain and to be trained for personal and professional growth towards company’s

success and support the company’s  mission and vision through the fullest of my

potential and skills.

 

• Profile: Male, 46, Married

• Current Location: Dubai, UAE

• Current position: GPON Lan Technician, Fiber optic, installation and activation
• Company: Etisalat Dubai, UAE
  (Reporting to: Managing Director)

• Preferred Locations: Dubai, Doha, Jeddah
• Salary expectation:

                                                                                                                                                                     Work Experience

GPON Technician Fiber Optics – LAN Tech. III

Etisalat  Telecommunication Company

Dubai

August 2009 to August 2011

Job Description / Duties and Responsibilities :

Installation of ONU (Optical Network Unit).

Laying of Fiber optic cable from subscriber up to ODF/FDH rack.

Termination of fast connectors to parch panel.

Optical testing of Fiber optic cables using OTDR and power meter with light source from equipment

connection to ONU equipment to make it sure if the db loss is passed before migrate into new

system of FTTH-GPON projects.

Surveying of all buildings, villas and measuring if the cable route is possible to install FOC.

Migrating the copper cable into FTTH installation for the new optical network unit, configuration and activation, powering up of various routers or modems.

 

Field Supervisor/ Site Engineer FXTH and FTTH Project

Teleworks INC

July 2008 to July 2009

Supervision and handling of a team in the installation and repair of both fiber and copper cable FXTH and FTTH Project usually Outside Plant and Buildings.

Monitoring and supervision of base stand construction/civil works.

Handling of team for the rehabilitation and preventive maintenance.

Structural cabling for high rise buildings.

Planning for revision of propose cable expansion.

                                                                                                                                               General Technician both Fiber and Copper Cable / GSM

Saudi Telephone Company - Tabuk

March 1999 to March 2006

Installation and repair of both fiber and copper cables, splicing using picabond connectors and termination of copper at main distribution point, testing of new trunking cable for insulation resistance, continuity grounding and shorts, installation of distribution panel for both fiber and copper. Testing and trouble shooting using power meter, OTDR and talk set. Evaluation of test and inspection result.

SCOPE OF WORK:
Cable Splicer - Copper Cable
- Preparation and installation of distribution point.
- Splicing of aerial and underground cable using UY connector and modular splicing system.
- Termination of copper at main distribution frame (MDF), digital loop carrier (DLC), and cross connect cabinet.
- Testing of new trunking cable for insulation resistance, continuity grounding and shorts.
- Installation, closing and re-entry of XAGA 550, mechanical closure and UCN closure.
- Fault finding and troubleshooting.
- Installation of grounding, aerial and underground spliced cables.
- Daily routine check-up for preventive maintenance.
- Preparation, installation and splicing of fiber optic cable.
- Conduct pre-acceptance test such as installation resistance and pair continuity.
- Conduct flow analysis and repair of leaks of the ground pressurized cables.
- Installation of distribution panel (D.P.)
- Installation of new telephone lines from D.P. to subscribers house.
- Construction's networking facilities from civil works up to acceptance of the landline cables.
- Evaluation of test and inspection result.

Fiber Optic Cable
- Preparation of fiber optic cable.
- Opening of cable about 2.5 to 3 meters, then removal of cable sheath, cavlar, filler, strength member and loose tube buffer.
- Cleaning of fiber optic cable, preparation on splicing tray and then splicing of fiber using a fusion machine.
- Closing of finished splice fiber optic using any type of closure such as doom type closure, PSI closure & 721 3M closure.
- Fixing of closure on aerial & underground spliced fiber optic cable rolling of about 15 meters loop on crossbar.
- Testing & troubleshooting using power meter, optical time domain reflection (OTDR) & talk set.

GSM Background:

Main Duties and Responsibility:

Telecom Electrical Power supply equipment devices and it's accessories installation.
Installation of GSM 900 MHZ and 1800 MHZ antennas and it's accessories.
Installation of and alignment of 2 mb Nokia FLEXIHOPPER Microwave antenna at 70 m four legged tower.
Installation of Nokia DE, DF, DG34 Intratalk series equipment.
Laying Power Cable from BTS, MTS, Rectifier ACPDP.
Laying of Trunklines from Riser to Feeder Entry.
Feeder Cable sweep testing.
Battery back up termination 1 5/8 and 7/8 feeder cable layout and connector installation.
Standard length monopol installation, for BTS panel antenna and microwave antenna installation.
Responsible for the installation of nokia equipment such as Base Transceiver Station (BTS), Metro Transceiver Station (MTS), Battery Backup Unit (BBU), Combiner, Modem, Indoor & Outdoor Antenna.
Installation of cable ladder on floor plan given, Cable Installation of 7/8 & 1/2 Coupler, 8 DB Splitter, 4 PNM Connector.

LOS SURVEY ( Line of Sight Survey )

To know if there is clear Transmission Path from the Site Candidate going to the Link-Up Sites and declare wether it is blocked or not.
Perform Ballon Test if the Site Candidate is Green Field or a Mini tower on top of the building.
Measure the Structure Height of the building as well as the Antenna Center Line (ACL), where we proposed the location of the Microwave Pole.
Taking picture from the near end Site going to the far end and vice versa as well as the location of the Microwave Pole. If there is no roof deck plan available we draw and measure every parameter of the roof deck for the possible location of the Microwave Pole.
Photo Edit the pictures we have taken during the LOS Survey for the reports.
Making LOS Survey reports using Map Grid and information we"ve gather during survey.

 

Cable Splicer both Fiber and Copper Cable / Store Keeper

MG EXEO, Marubeni Corp -

Manila

July 1991 to July 1998

Splicing of both fiber and copper cable aerial and underground, Conducting of testing, evaluation and inspection result, Termination of fiber and copper cable at MDF and ODF side. Fault finding and trouble shooting, daily routine check up for preventive maintenance, conduct preacceptance for both cables from Central Office to Cabinet side.

WAREHOUSE SECTION/LOGISTICS:

Issuing of tools and equipment to all technicians for their usage.
Providing data and stock inventory.
Preparing reports and tally sheets for inventory.
Receive stocks upon arrival, and arrange items according to specifications.
Making requesitions for materials and equipment.

 

Sales and Marketing Personnel

Avesco Marketing

Telecommunication  Products

Roosevelt  Avenue, Quezon City

 

July  1986 to July 1987

 

Duties and Responsibilities:

 

Handling of day to day sales transactions from opening to closing.

Inventory as well as merchandising.

Assuring that the product is in good condition as per  handling and delivery of the product.

Product  demonstration for customers satisfactory.

Data encoding for monthly inventory.

 

Radio Operator

Local Goverment -

Quezon City

July 1985 to July 1986

Particularly it is a Home Base Station manning the Taskforce for Anti Vice and Corruption for the local goverment under the Vice Mayor.

Knowledge on TETRA (TDMA)

Education

BS in Electronic and Communication in Telecommunication

Lyceum of the Philippines

Manila 1984 to 1989

 

University of The East -

Manila

March 1980 to April 1984

                                                                                                                                                             Sacred Heart Academy

July 1974 to March 1980

Skills

Pole Climbing Techniques, Driving skills for both automatic and manual light vehicle, Fiber and Copper cable splicing using Fusion machine, router configurations, Knowledge on the usage of testing equipment for fiber and copper cable (OTDR, Power Meter, Fluke, Dynatel 3M & and knowledge in sales automotive parts and freelance car sales agent.

Additional Information

IT Skills

Windows & Office tools
• word, excel, powerpoint Basic

Tranings/ Seminar Attended:
Philippine Long Distance Telephone Company
Human Resrource Development Center
Basic Cable Splicing July 1993

Raychem
Cincor Industrial and Development Corp.
XAGA 550 Installation/Re-entry May 1994
Siemens
RXS Heat Shrink & Mechanical Closures,
MDF and Fusion Splicers June 1996

Basic CCNA Training/Seminar June 2012

Learner’s Point

 

FTTH Installation Course  Oct. 28 2009

Structural Cabling

Etisalat Academy

 

 

 

References :

Manases  H. Monding JR.                                            DU-Emirates Integrated Telephone Company

                                                                                     Submarine Cable Landing Station Technician

                                                                                     Mobile # +971559532938

 

Larry Noveno                                                                DU-Emirates Integrated Telephone Company

                                                                                     Submarine Cable Landing Station Technician

                                                                                     Mobile # +971559532946

 

                                                                                                                                                               Rolando Medina                                                           Etisalat Telecommunication Company

                                                                                     LAN Technician II

                                                                                     Mobile # +971529448939

 

Ramil R. Navarro                                                         Saudi Telephone Company

                                                                                     OSP/DSL Techinician

                                                                                     Mobile # +966554765601

 

 

 

 

 

 

 

 

                                                                                              ___________________________________

                                                                                                          Mr. Ronald S. Del Rosario

 

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US