From: route@monster.com
Sent: Friday, September 11, 2015 1:13 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Anthony Paul 1030
N Mountain Ave. #197 Ontario,
CA. 91726 Anthony.Paul645i@gmail.com 951-591-1602 Experience: 11.5 years in the Tekelec product
line environment was involved in the original AT&T switch install
in Charlotte NC, and have worked in numerous telecom markets. Los Angeles,
Arizona, Las Vegas, New Mexico, Texas, Tampa, Chicago, New York, Little Rock,
Scott Airforce Base, Camp Zama Airforce Base, Yokota Airforce Base, Hickam
AFB, Scoffield AFB, Hawaii, Seattle, Portland, Alabama, Mexico City,
Vancouver, Edmonton, Calgary, Toronto/Markham Canada, Montreal Quebec,
Beijing China, Tokyo, and Guam. Have completed all aspects of Tekelec
installs from complex and Simple adds, as well as 850 overlay, Alarm
migration, Extension Frame migration, Measurement platforms, Software release
upgrades, Installation and removal of Telecom Equipment. Objective: Seeking a
position to utilize my skills and abilities and achieve professional growth
while being resourceful, innovative and flexible, adding valuable assets to
use my skills in the best possible way for achieving the company’s goals as
well as acquiring knowledge of new products and equipment to keep up with the
cutting edge of technology in the Telecom wireless Community. GDT: Lead Field, Switch
Tech Optical team 02/05/2013 – 02/07/2013 – Verizon
Wireless Ontario Ca. Install SRX-00/-01 Tap bracket with (4) 10G Net Optics
line taps, (8) LC – SC 50 micron duplex multi-mode fibers, (16) LC – LC 50
micron duplex multi-mode fiber, (8) SC – SC 50 micron duplex Multi-mode
fiber, all cabling Brady labeled on both ends using flag labels on optical
fiber, test all fibers using a Fluke Cable
Analyzer and provide VzW with the results in job completion package. 01/15/2013 – 01/28/2013 – Sprint/Ericsson
San Diego Ca. Install, test, label Juniper MX480 routers, LC to LC,
interconnect and LC/SC fibers from routers to customer network. Test fibers
end to end, test OOB and light levels. Daily reports to PM and customer. Work
with Sprint engineers to verify tests, fiber ports, walk thru and sign off of
Juniper installation. 04/12/2012-12/31/2012 – Dallas
TX, Install, configure Cisco data switches, migration and provisioning. Fiber
and inner bay cabling of Cisco ONS 1554, ST-40 optical networks, fiber
characterization using JDSU 8000. Scope fibers 1310/1550/1625/1650nm for
defects, contamination, chips, pits, scratches relative to the fiber core.
Inspect, clean both male patch cord and female bulkhead connectors. Test
range of OTDR Bi-directional modules for multimode and single mode that are
passive optical networks optimized for insertion loss. Certify fiber physical
layer on FTTx/PON, Access, Metro and Enterprise networks with analysis of end
face conditions and instantaneous PASS/FAIL results. Test multimode and
single – port LED source for power and loss measurement. Mount M-6 chassis,
install, ECU, LCD, DC power units, run, dress, terminate power to fuse panel,
grounds to chassis and customer ground bar. Run fiber jumpers to SFP modules
and chassis data cards. All work performed for Time Warner, RCN Boston and
Verizon. Daily status reports / Webex meetings with Project Managers and Optical
installation teams. View Sonic: Test tech 05/07/2012 - 6/24/2012 - Walnut,
California, Update software, firmware, (PMB) Power main boards to
accommodate new software load, verify amperage throughout backplane, all
HDMI, VGA, VA, YPbPr ports, quality control, calibration and assurance checks
of touch screen components of digital signage and ePosters. Assist engineers
with detailed deployment of digital products to customers and sales
functions. OS load verification and calibration of ViewSonic tablets, and
monitors. Tekelec Work History: Lead
Field, Switch Tech 01/18/09 - 02/24/11-
Paetec Va Beach, Sterling, VA. Rochester, NY. 3 site project; Lead tech of 3
installers 384 Million ELAP project. Assist Engineers in remote software
upgrade, Run health check of system, compare end health check in comparison.
Install EF01 extension frame, Telco switches, migrate DC power to designated
slots, install SM4G, MPSM cards for Measurement Platform, ping IP address to
customer network, de-install DSM cards from database. Complete health check
before and after maintenance upgrades. Capture files and daily reports to
project manager. 07/13/09 - 07/31/09 - Verizon
2 site project; Santa Monica, Long Beach, CA. 384 Million ELAP project. Assist
Engineers in remote software upgrade, Run health check of system, compare end
health check in comparison. Install Telco switches, migrate DC power to
designated slots, 4-T1, 4-Multiport, 4-RJ45 cables dressed, formed to HUB and
Butt/stripped, terminated to customer DSX panel. Verified end to end using
Tekelec streaker board test kit. 06/09/09 - 06/30/09 - T-Mobile
Bellflower CA. Tekelec 3 Frame expansion. Lead Technician for team of 4
installers. Drill floor, mount frames according to specs. Run, dress,
terminate DC power to BDFB from new frame FAP’s, run, dress, terminate inner
bay cabling, dress, lace cabling to ladder racks, 224 T-1s, 34 2 port lim
cables butt/stripped terminated to customer DSX, streaker board test kit for
cable verification end to end, Run health check of system, compare end health
check in comparison. configure, migrate, test IMT bus, HIPR cards,
Flash configure database cards, verify GPL levels. Complete daily reports to
project manager and customer. 05/09/09 - 05/22/09 - Cingular/AT&T
WIRELESS 2 site FAP SWAP; Sacramento CA, Houston TX. Run health check of
system, compare end health check in comparison. Fuse alarm panel
upgrades, using PCF (portable control frame) simulated power to conform to
existing amperage of live system to exchange 12 old fuse alarm panels to 12
new fuse alarm panels, run, dress, label new power leads to BDFB. Zero drop
links or interruptions. Complete test results on capture file with daily
reports to project manager. 04/08/09 - 04/26/09 - T-Mobile
2 site project; San Francisco, Long Beach CA. Lead Tester. Perform day
to day duties of lead tech. Monitor trouble ticket system and CSR tickets.
These duties include replacing database cards, fuses, IMT cable causing
errors. Test head to head with the switch on new T-1’s and faulty T-1’s for
Tekelec LSMS and G-flex. Sweep RF lines with Anritzu sweep
gear, Perform system health checks and capture files for ITAC engineers.
Complete monthly PM’s and performed Asset Audits on site equipment. Complete
daily reports to project manager. 02/7/09 – 04/21/09 - EMBARQ
6 site G-flex migration project. Las Vegas, NV, Jefferson City, MO, Osseo,
MN, Trenton, NJ, Fayetteville, Rocky Mount NC. Lead Tester, De-install old
STP frame and existing cables, Install new G-flex frames for LSMS system
equipped with 2nd Generation
DSM cards, HIPR cards, 2nd
Generation EDSM cards, flashed and configured verify GPL levels, ran, dressed
134 High speed links terminated to the customer DSX, verified end to end
using streaker board, upgrade existing composite clock source to Hi Speed
converted from line source. Run health check of system, compare end health
check in comparison. Complete daily tracking of completed sites on
excel spreadsheet and report to project manager. 11/01/08 - 1/17/09 - Qwest
8 Site initial install of New Eagle 5 STP. Portland, Lebanon OR, Seattle WA,
Littleton, Denver, Boulder, Fort Collins, CO, St. Paul MN. Lead/Tester of 3
techs, Complete site surveys and audits for Qwest of their sites including DC
amperage test of BDFB and CO ground bar. Installation of Eagle 5 STP seismec
frame, equipped with HIPR, T-1, TSM, MPL cards. Ran, dressed 96-multiport
cables 768 terminations to customer DSX, verified end to end with Streaker
board kit, install inner bay cabling, flash, configure database cards, verify
GPL levels and capture files. Daily reports of project status to Project
manager on a daily basis. 10/12/08 - 10/28/08 - Verizon/Nortel
Networks, Los Angeles, Project. Tech assistant CDMA and EVDO new site builds
and upgrades Dom-A card swap outs, ATP/Integration. Extensive
troubleshooting,T-1 troubleshooting clearing alarms. 09/29/08 – 10/09/08 - Time-Warner,
2 site project; Manhattan, NY, Phoenix, AZ. Run health check of system,
compare end health check in comparison. Pre-Install Site Audits and
surveys, Installation and Commissioning of Tekelec TEKServers and EAOP
Decommission and De-install 09/01/08 - 09/12/08 - IDT
, Newark, Piscataway, NJ 2 site project; T-1 expansion for growth of Siemens
GSM, Lucent UMTS and Tekelec G-flex . Tech assistant to Lead project manager;
Oversee entire assigned field tech crews, switch techs and NOC Engineering
team, conference calls and Face to Face meetings with Customer and
sub-contractor companies involved. Reports completed on a daily basis with
all updates and progress throughout project until completion. 05/26/08 – 6/24/08 - Rogers
AT&T 3 site project; Toronto/Markham CAN, Montreal Quebec. Software
release upgrade worked with Tekelec ITAC Engineering Team, implementation and
migration of 3 DSM 2nd
Generation cards to IPLIM platform thru Garret Hub. Clock upgrade from
composite to Hi Speed. Capture files, daily status reports to project manager
and customer. 02/16/08 - 04/23/08- X/Y
Point Communications, Ericsson removal Lead Subcontractor, Seattle WA,
Phoenix, AZ. In charge of crew of 6 of de-installation, removal, audit,
package and shipping of all equipment from both sites to Ericsson warehouse
in Plano, TX. 11/05/07 - 12/14/07 -T
Mobile, Allentown, Akron PA. 2 site G-flex 3 frame expansion project; Lead
Tester crew of 3 Install/ Commission /Integration of Tekelec G-flex to LSMS.
Drill floors, mount frames in designated positions according to MOP specs.
Run, dress 2awg, H-tap to 6awg DC power to BDFB terminated to G-flex FAP’s,
run, dress System/Frame ground, inner bay cabling and link cabling for
LAN/WAN, run, dress 32-2 port LIM cables, butt/strip terminate to DSX panel.
Verify end to end with Tekelec Streaker Board kit. Test, Flash T1 cards,
verify GPL levels and health check of system. Complete turn-up for T-Mobile
3days ahead of schedule. Capture files and daily reports to Project manager. 09/17/07 - 09/21/07- Deltacomm,
2 site project; Anniston, AL, Atlanta, GA. Lead Tester Software upgrade to Tekservers
for LSMS platform, assisted Tekelec ITAC Engineers and Deltacomm NOC team in
the remote migration/implementation of software load. 07/02/07 - 08/15/07- Verizon
Wireless 5 site project; Hickory Hills, IL, Arlington, Houston TX, Matthews,
NC, Warrenville Heights, OH. Tester/Installer Install, test 6 shelf fans per
site. Completed each project 1 day ahead of time. Boosting production by 23%.
Complete sign-off, capture files and status report to Project manager. 05/2007 – 07/2007- Adex
Corp. Cingular Wireless Philadelphia, PA QA/Drive (in-training Installer)
Trained to Install/ Commission and Integration of Nokia Ultrasite GSM
equipment, BTS indoor/ NUSS outdoor cabinets. Trained to Test T-1 (T-Berd), punch
down Alarms (66-Block), Trained to trouble shoot alarms. 850 & 1900 MHz,
NUSS, IBBU, 24V E-folders, QC Auditor. Install cable rack thru entire site
and site construction. 04/2007- 05/2007- Adex
Corp. Verizon Wireless,T-1 expansion project; West Covina CA. Ran, dressed,
wire wrap termination 36-25 pair cables to Verizon DSX panel and
cross-connects, tests on DSX with the use of the T-Berd, Interconnect of T1
Spans at the DSX on CDMA and network equipment testing the switch over of
T-1s with T-Berd 107a’s. 09/13/99 – 04/2007-
Tekelec Tester/Installer for various vendors from; Verizon, T-Mobile, Paetec,
Level3, Centurytel, SBC, PacBell, Rogers AT&T, IT&E, INS/Onvoy, Time
Warner, VGNI, Cingular Wireless, Sprint/Nextel, AllTel, IDT, Deltacom, Embarq
(CenturyLink), Nevada Telephone, China Mobile, Qwest, Frontier, Cricket,
Cellular One, US Cellular and US Military bases. Education:
References: Carter
Calloway 919-460-5500 Tekelec ITAC Engineer Pernell Briggs
919-949-3888 Tekelec Project
Manager Josh Bowers
607-544-4910 Tekelec
Contractor Ruben
Vega
910-797-6745 Tekelec ITAC Contractor
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|