From: route@monster.com
Sent: Friday, September 11, 2015 1:12 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
HANZ S. ECONG
Wireless Engineer
Mobile:
201-218-4115 Email:
hanze_comp@yahoo.com US
Work Authorization: Permanent Resident (Green Card Holder) SUMMARY
OF QUALIFICATIONS: § Supervisory & Team Lead: o Field Supervisor of Avion Systems
Inc for T-Mobile Site Modernization Projects. o Team Lead and Deployment Manager
of LOS (Line of Sight) Surveyors. Job details includes deployment of
Microwave LOS surveyors in the field as requested by RF & Microwave
Engineers of Clear Wire. o § OSP Engineering: o Experience in Outside Plant
Engineering Planning and Design using AutoCad, OptiLite, OptiNT3 & MS
Visio 2003. o Fiber to the Node (FTTN) &
Fiber to the Premise (FTTP). o Aerial & Underground Cabling
designs Including Drafting & Obtaining City, DOT & Over Railroad
Aerial Permits. o On field surveys & surveys
with aid of Map Info, Google Maps, Delorme TOPO USA 2007, Microsoft Street
& Trips. § Wireless Communications: o Field Engineer -
(CDMA/EVDO/TD-LTE) Sprint Network Vision Project Using Samsung MMBS (Multi
Modal Base Station). Assignment Includes T1 Cabling, Cisco ASR 901 Script
Loading, Fiber Optic Integrity Testing from AAV to CSR Router, Digital Unit
Installs, Troubleshooting MMBS component issues & alarms, Equipment
Testing, Speed Testing with Upload & Download, Acceptance Test Plan and
Creating Close Out Packages. o Field Engineer/Team Lead/Field
Supervisor/Integrator - (GSM/3G/4G/LTE) T-Mobile Site Modernization using
Ericsson RBS 6000 Series Cabinets. Assignments includes Digital Unit
Installs, +24 to -48 Power conversions, Cabinet Modifications to accommodate
new Digital Units & RRUs, Commissioning & Integration, 911 Call
testing & 4G LTE Speed Testing, Troubleshooting complex alarms &
issues, Ensure quality of installation, Create plans on reducing customer
downtime, Overlook team's capacity & productivity. o Experienced & Certified with
Ericsson RBS 6000 Series Installation, Commission, Integration and Call
testing. o Experienced with Nokia WCDMA Flexi
BTS Installation (With Valid PTID 001MYC01746), Commissioning &
Integration, Call Testing & Troubleshooting (NRTU2 Certified); Nokia BTS
UltraSite Installation, and Commissioning. o Experienced with Huawei BTS3901
CDMA 1X & EVDO, Installation, Commissioning, Troubleshooting &
Call Testing. o Experienced in construction of
Indoor Shelter from scratch. This includes T1 cabling & Termination,
Power Cabling & Termination, Battery Back Up Installation & Cabling,
RF Jumper fabrications & Testing, Follow & make sure Quality
Standards of Customers are meet. o Experienced with Cell Site Survey
for Fiber Optic route from backbone to site. o Experienced with Cell Site Surveys
for Site Upgrades to include New cabinet location on platforms, Cable routes
& Power Capacity. o SBC-TP-76300 Certified for working
inside Central Office Environment. o Microwave Backhaul LOS (Line of
Site) Surveys including drive path surveys & RAD Centers. § Local Area Networking: Ethernet Cabling, Routers, Access
Point, Hubs & Switches. WORK
EXPERIENCE WorldLink
IncJune 2013 - Present. Field
Engineer · Sprint Network Vision
(CDMA/EVDO/2500 TD-LTE). Minnesota, Wisconsin, North Dakota, Iowa &
Nebraska markets. Cabinet migration from
Legacy Nortel to Samsung MMBS (Multi Modal Base Station) . Commissioning
Cisco Router ASR 901. Troubleshoot Samsung MMBS & cabinet components. T1
migration from NIU to Nortel then from Nortel to the New Samsung Equipment.
Fiber Optic Backhaul installation & testing. Cabinet reconfiguration
including Digital Unit installs, Re-routing & Re-dressing of existing
cables, Loading ENV script, Functional Testing, Alarm Testing,
Troubleshooting, Quality Inspections for General Contractors & Creating
Close Out Package. Created efficient plans to
minimized customer downtime during migrations. Performed Acceptance Test
Plan effectively & Created systematic ways to minimized multiple site
visits due to lacking information on previous visits. First ever awarded as Most
Outstanding Field Engineer of the Month By Samsung SDSA Region 10 North
Project Manager Eugene Ladeau. AVION
Systems Inc.August 2012 - June 2013 Field
Engineer / Team lead / Field Supervisor / Integrator · T-Mobile Site Modernization
(GSM/UMTS/LTE). Pennsylvania, New Jersey & Delaware markets. Responsible for keeping
the site tracker for Avion, Team support during integration &
troubleshooting, Coordinate with T-Mobile PM, CM & Techs for installation
quality, Coordinate with Ericsson Implementation Managers regarding
Construction & Integration Status. Performed 1A, 1B, 2C, 3A, 3B, 4A &
4B Configurations , DU commissioning, Integration, Call Testing &
Troubleshooting. Achieve recognition &
high regards by customer & peers as the most Efficient & Field
Engineer in the project. Atlas
Wireless And Telecommunications April 2012 - June 2012 Wireless
Engineer · AT&T Site Upgrades (4G-LTE).
Massachusetts, New Hampshire, Rhode Island & Connecticut markets. Performed
Installation, Commissioning, Integration & Call Testing (CSFB & Data
Speed Test). T-Force,
IncJune 2011 - November 2011 Wireless
Engineer · Cricket Communications
(CDMA/EVDO). South Texas markets. Nortel
to Huawei Swap out. Perform Huawei BTS3901 BTS Troubleshooting; Quality audit
of cabinet installation including grounding, power cabling, & RF jumper
cabling; on-site software updates; T1 testing & troubleshooting. GW
COMMUNICATIONSJanuary 2008 - June 2011 Wireless
Telecom Engineer (GSM/UMTS/WIMAX/LTE) § T-Mobile – Nokia Flexi UMTS 2nd Carrier Add & FSME Expansion
(Replace FSMB w/ FSME & Re-commission BTS). Tampa & Orlando, Florida,
December 2010 – June 2011. § AT&T 1st, 2nd, 3rd Carrier Add
& New Build Sites. Installation & Cabling. (Nokia GSM & Ericsson
3106 & 3208) Central & North Florida, October 2010 - December 2010. § T-Mobile – Nokia Flexi UMTS 2nd Carrier Add. Install new FRIA
& Re-commission BTS. Central Florida, July 2010 – October 2010. § AT&T UMTS 3rd Carrier Add (Ericsson RBS 3106,
3206, 3418 & 3518) Installation, Commissioning, Integration & Call
Testing. RAX & TX60 board Add & swap. – Bay Area, CA April 2010 –
July 2010. § T-Mobile HSPA Add (Nokia Flexi
FSMD and FSME Add) – St Louis, MO – March 2010 – April 2010. § AT&T New Build Sites.
Installation & Cabling. (Nokia GSM & Ericsson 3106 & 3208)
Orlando, FL – December 2009 – February 2010. § Nokia Siemens Networks LTE 4G
Solutions Trial (Installation & Troubleshooting) AT&T Dallas, TX –
November 2009 – December 2009. Installation of System Module, RF Modules
& QA. § Deployment Manager - Backhaul LOS
Survey Clearwire Miami, FL Project – September 2009 – October 2009 Team
Lead and Deployment Manager of LOS (Line of Sight) Surveyors. Job details
includes deployment of Microwave LOS surveyors in the field as requested by
RF & Microwave Engineers of Clear Wire, Reporting to RF & Microwave
Engineers the details of the surveys. Submitting list of sites completed
using MS Excel. MW Backhaul Field Survey, Visual Line Of Sight, Path Drive,
PathLoss, Delorme TOPO, GPS Mapping. Measure Obstructions along path, Measure
Tower Heights. Decide if path is clear or blocked. § Backhaul LOS Survey Clearwire
Denver, CO July 2009 – August 2009 § Backhaul LOS Survey Clearwire
Houston, TX – March 2009 – July 2009 § Backhaul LOS Survey Clearwire
Boston, MA – February 2009 § Fiber Optic Cable Lateral Design § FTTN (Fiber To The Node) & FTTP
(Fiber To The Premise) Design § Outside Plant Construction
Permitting § Cell Site Survey for Fiber Optic
route from back bone to site § Drafting using AutoCad, OptiLite,
OptiNT3, MS Visio 2003 § Nokia UMTS Test Call, UMTS
Troubleshooting & T1 Testing. T-Mobile
Denver, CO – August 2008 Contract
with Nokia Networks, Supervisor - Sam Clark § Nokia UMTS Site Survey T-Mobile
Albuquerque, NM Project - September, 2008 Site
Audit & Survey on Nortel GSM Edge (S8000 & S12000) for Nokia UMTS
Upgrade. § Nokia UMTS Site Survey T-Mobile
Phoenix, AZ Project – January 2009 Site
Audit & Survey on Nokia GSM Edge for Nokia UMTS Upgrade. Inpro-Solutions
LLC Nokia
BTS Field Engineer (MYCOM – North America)April 2006 – December 2007 (AT&T/Cingular
Florida Market) (GSM) § Site Preparation for Nokia EDGE
Upgrade, § Wiring of DSX Panel, UTP Cabling
for T1’s, Rectifier to BTS power cabling & termination, RF Cabling. § Nokia BTS Installation, IBBU
Conversion, Commission & Integration. § Fiber Optic Cable Lateral
Design (Time Warner Cable Project) § FTTN (Fiber To The Node) AT&T § Outside Plant Construction
Permitting (Time Warner Cable Project) § Cell Site Survey for Fiber Optic
route from back bone to site (Time Warner Cable Project) § Drafting using AutoCad, OptiLite,
OptiNT3, MS Visio 2003 Technocrest Systems Inc.
(Springfield, MO)November 2005 – March 2006 Computer
Field Service Technician § Provide Field Services for Dell
Computers (Parts Replacement and Troubleshooting) EMCOR INC. Advance Technology Systems (Philippines)
February 2004 – October 2005 Sales
Engineer / Computer Technician AMA
CLC Mandaue (Philippines)June 2003 – December 2003 Computer
Technical Instructor EDUCATION BS
Computer Engineering (March 2001)Misamis University – Philippines TECHNICAL
AND PRODUCTIVITY TOOLS Autocad
2007, OptiNT3, MS Excel 2007-2010, MS Visio 2003, Corel Draw, Adobe
Photoshop, Windows XP, TCP IP, Networking (Hubs, Router, Firewalls, Bridges),
Nokia Base Transceiver Systems, Ericsson Radio Base System. PathLoss,
Delorme TOPO USA 2007 GIS Mapping, Microsoft Street & Trips.. SEMINARS
AND TRAINING CERTIFICATIONS § Nortel/Ericsson CDMA / EVDO HS1
Certified (Commission & Integration) - Ericsson Training Center. Plano,
Texas (April 3-6, 2012) § Ericsson UMTS & LTE HS1
Certified (Commission & Integration) - Ericsson Training Center. Plano,
Texas (March 19-23, 2012) § Nokia WCDMA Flexi 3G Boot camp (3G
Basics, Nokia Flexi WCDMA BTS Installation, Commission & Integration) -
Nokia Training Center. Irving, Texas (July,
2008)Nokia PT ID No:001EXI01746. (NRTU2 Certified) § OptiNT3 Drafting – AT&T
training Center, Houston Texas § Outside Plant Design – GW
Communications LLC, Dallas Texas § FTTP (FDH) & FTTN (VRAD)
Network Design; Feeder & Distribution; Site Survey. (June
2007) § Nokia BTS & Ericsson UMTS
Installation – EXi PARSONS TELECOM. Richardson, Texas (April, 2007) § Nokia BTS Installation (Level1
Certification) – MYCOM North America. Orlando, Florida. § (September, 2006) § Nokia BTS Commissioning (Level2
Certification) – MYCOM North America. Orlando, FL (January 2007) § Ericsson RBS Installation (UMTS) –
Exi PARSONS TELECOM. Richardson, TX (January
2007) § Ericsson RBS (Workmanship Quality
- RT1 Certification) – EXi PARSONS TELECOM. Richardson, Texas (March
2006) § SBC-TP-76300 Certification
(passed) (Switch Wiring, lacing, Safety, Maintenance & Installation) EXi
PARSONS Richardson, TX (April, 2006) § Dell Certified Systems Expert –
Dell DCSE Online Testing Center (January 2006) § Computer Technician – Integrated
Electronics and Communication Engineers of the Philippines (IECEP) TESDA
(Technical Education and Skill development Authority) Training Center Cebu
City Philippines (December 2002) Data Communications &
TCP IP – Technocrest Systems Training Center, Philippines § First Aid CPR AED Certification -
American Heart Association - Samsung SDSA Office Minneapolis, MN § OSHA CERTIFIED - OSHA 10 HOUR
Outreach Training Program - Construction § Safety Module Certifications: o Back Injury Prevention - 4/9/2011 o ESD Training - Basic - 3/7/2011 o TL 9000 Basics - 2/21/2011 o Slips, Trips, & Falls
Prevention - 1/24/2011 o Driving Safety - 12/14/2010 o Fire Prevention Safety -
11/30/2010 o Disaster Preparedness - 11/29/2010 References: John
Mateo Engineering
Manager - GW Communication Telephone:
469-831-2953 Office:
972-316-6360 Eugene
Ladeau Project
Manager (Region 10 North) - Samsung SDS America Telephone:
904-557-3975 Jeff
Dye Project
Manager - AVION Systems Inc. Telephone:
919-522-6468 Office:
919-995-4551 1 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Tagalog |
Fluent |
|
|
|