RESUME
Kevin
A. Paulsen
Professional
Profile:
I
have 35 years experience related to Telecommunication Outside Plant
Engineering and Construction Project/Program Management with strong
organizational and communication skills. I work at the expert level in
designing conduit plans and profiles and have over 12 years experience
computer aided design, including OSPFM, AutoCAD, Microstation, Visio,
OPTINT and BSTCAD. I am skilled in conflict resolution, managing milestones
and staying within budgetary constraints. I have a strong working knowledge
of California GO-95 and GO-128. I have strong skills in railroad
rights-of-way fiber optic cable design (longitudinal and lateral crossings)
and meeting with railroad officials. Experienced at permitting process with
permitting agencies ranging from federal, state, local, BLM, Core of
Engineers, and others. I am skilled at researching existing utilities,
meeting with city, state and federal officials and right-of-way agents to
obtain permits for current/future public and private easements, related to
the placement and relocation of telecommunication facilities, both on
railroad property, private and public rights of way.
|
|
Core
Competencies
|
|
|
Network
Planning & Deployment
|
CADD
– Microstation V8, AutoCad OSPFM & Visio
|
Conduit
structure design
|
|
OPEDS/JMS,
OSPCM, BCAT, MIC,
|
OPTINT,
BSTCAD, OPEDS, MapViewer, MobilMapping Tool
|
Excel
Pivot,Vlookup, Word, Power Point, Outlook, SharePoint
|
|
OSP,
Outside Plant Engineering, Project & Program Management
|
AOTX,
PMTOOL, Fireworks/Bidmaster
|
AAIS,
CCP, Change Management
|
|
Project
Coordination & Execution
|
BICS,
BICSI RCDD Trained
|
Relocations
and Road Moves
|
|
Engineering
& Construction Vendor Management
|
FTTB,
FTTN, FTTP & FITL
|
HI_CAP
Design, DS1, Metro Ethernet, ASE
|
EXPERIENCE
February
2013 – Present
Sun
Technologies
AT&T
Program Manager – Fiber to the Business Program
Currently
managing AT&T FTB program consisting of 15,000 plus projects in the
AT&T Midwest territory.
July
2012 - December 2012
RHO,
Inc.
BASF
Plant Cabling Engineer
Southwest
Region.
Engineering and project management of the
BASF cabling replacement and switch migrations at several BASF chemical
plants in the Southwest region. Involved complete engineering and
implementation of all fiber optic and cat 5/6 wiring. Project management of
several contract construction firms for placement, splicing and test of ISP
and OSP cabling, frames, switches and UPS units according to but not
limited to BICSI, ANSI, TIA, EIA, NEC, Fire code, confined space, and
corrosive/explosive environments. Engineering and design of wireless AP's
at each plant as required by the individual plant.
May
2012 - July 2012
Mountain
Ltd.
Century
Link, Colorado Springs, CO
OSP
Engineer
Specialized
in Road Moves and Relocations for State and local projects involving
Aerial, UG and Buried Fiber, Copper and Conduit systems. Answer RFAs from
Planning by providing field notes for Engineers in Denver area. Also
completed rehabs for aerial and buried Facilities. I have a working
knowledge (certified)of Fireworks/Bidmaster, USDA RUS units and OSPFM.
September
2010 – May 2012
ADEX
Corporation
Hi-Cap
Outside Plant Engineer
Memphis,
TN
Design
of HI_CAP DS1 and Metro Ethernet circuits for Customer premise orders (Bell
South).
Meet
with customer to for BICS requirements for new installations and existing
installations to recommend entrance routes within the building in a high
rise environment if required.
November
2009 – September 2010
AFL
Telecommunications
Outside
Plant Engineer
Shreveport,
LA
BAU
OSP Engineer. Used OPEDS and BSTCAD in a Bell South Office. Proficient in
OSPCM, AOTX, PM TOOL, MAPVIEWER and MOBIL MAPPING. Engineering of EHAB, and
pole work using NJUNS tracking system. Meet with customer’s contractors to
review building entrance requirements (BICS) and prepared billing as
required.
January
2009 – November 2009
Two
Roads Professional Services
Huntington
Beach, CA
Project
Manager - Network Planner
Assigned
to the Verizon CA Network Planning department.
ISP/OSP
project manager for 660 Cellular site builds in southern CA cell site DS3
orders through engineering, construction and materials. Prepare project
progress reports using Excel Pivot reports for management. Attend weekly
customer conference calls as a presenter to decide the best method for
building entrance and provide assistance to Verizon PMO in insuring
milestones were met. Primary duty was to communicate with the customer to
resolve any BICS problems as needed by providing operational and technical
interface between managers, technicians and supervisors of both Verizon and
the customer, AT&T. Additional duties were to monitor materials
ordering for accuracy to eliminate delays. Experienced in AAIS, Requestnet,
CCP, MR Status Report and other web based applications to perform job
duties. Experienced in site walks, OSP field work including BICS,
engineering, permitting, environmental considerations, and conduit system
design.
November
2007 – January 2009
Goodman
Networks
Plano,
TX
Outside
Plant Engineer
Assigned
to the AT&T Apollo retrofit project. Design FITL work order packages to
implement the retrofit of existing Optical Network Units to GPON MDU’s. The
job also involved engineering “out of scope” work orders to place fiber
optic cable and power cable to the MDUs. Concurrently engineered FTTN, F1
VRAD jobs and F2 conditioning jobs, starting in December 2007 for
approximately 7 months in the Dallas Ft. Worth Metroplex.
March
2005 – November, 2007.
Dynamic
Technical
Lewisville,
TX
Project
Manager/Sr. Outside Plant Engineer
Assigned
to the AT&T FTTN program in San Antonio, TX. Engineering F1 FTTN
projects to place VRAD's. This also included fiber feeder, SAI re-skin or
replacement of 3m, Lucent, HUB, & AT&T cabinets. Provided
Right-of-way drawings and requests and detailed OptiNT prints with all
relevant paperwork. Very experienced in OptiNT, AOTL problem solving I also
inspected SAI retrofit installation for construction department while
training company inspectors. I am 3M trained for reskinning of existing
AT&T SAI cabinets. Also completed F2 and conditioning jobs as assigned
during slow time. Using telecommuting, I engineered F2 conditioning
projects on a unit basis on weekends and off time starting in August 2006
for PowerTel Inc in Detroit MI for approximately 6 months, averaging one to
two per week, part time.
April
1999 - March 2005.
Genuity
Solutions/GTE Internetworking Inc.
Lewisville,
TX
Senior
Consultant, Outside plant E,C&S) Management of nationwide Outside Plant
projects on Genuity’s Wide Area Network. This involved design and
implementation of entrance cable placement (BICS) for Terminal Stations,
Junctions, Data Centers and regenerators for Genuity Solutions Wide Area
network by working closely with Qwest to coordinate BICS for entrance and
exits to Qwest PoPs. Responsibilities included writing and issuing RFPs,
attending weekly meetings with Qwest and subsequent management of
consultant and contract firms to accomplish turnkey engineering,
construction and splicing. Inspection of ISP and OSP facility cable
entrances using punch lists and company practices on an as needed basis.
Responsibilities included complete project management, budget tracking and
billing for projects ranging in size from several thousand to a million
dollars plus.
1995-1999
MCI
Telecommunications
R&U
Department (Relocations & Upgrades)
Richardson,
TX
Started
as Engineer I, progressed to Engineer III
Engineering
and project management of relocation and upgrades to existing outside plant
fiber optic cable and facilities on the MCI Network. Prepare weekly
reports, attend field meets and manage engineering consultants and contract
construction crews, prepared RFP’s and meet with local state and municipal
governments. Wrote technical practices pertaining to OSP engineering and
construction methodology. Ordered materials and inspected installation of
fiber cable in Buildings (BICS), aerial, UG and buried environments. I also
coordinated joint relocations with other carriers, such as Qwest, Sprint
and AT&T. Determined collocation space and building entrance
requirements with other carriers as needed. Reconcile billing and inputting
into SAP as construction progressed.
1993
-1995
GTE
Hawaiian telephone (Consultant with AT&T local services)
Sr.
Project Engineer
Engineering
of work OSP order plans for the island of Oahu, Hawaii.
1978-1993
GTE
of California
Engineering
Fielder
Responsible
for all phases of OSP design for the OSP Engineering and Construction
department to conform to California GO-95 and GO-128. Trained in
Transmission and protection, Networking, BICS and well as traditional OSP
design. I also accepted a temporary assignment for Glacier State telecom in
Homer Alaska as a seasonal construction inspector for placement of buried
cable and served as CATV coordinator, BICS coordinator as well as
Subdivisions coordinator as part of my training.
1974-1978
USAF
Senior Airman-E4
Aircraft
Electrical Systems Specialist E-4. B-52 & KC-135 aircraft.
Education
Axia
College of the University of Phoenix
Graduated
AAIT Networking/Telecommunications. Graduated 2009.
University
of Phoenix
University
of Phoenix. BSIT, Networking and Telecommunications. Graduated 2013
|