From: route@monster.com
Sent: Friday, September 11, 2015 1:12 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Stephon Barnett 5712 8th Ave, Los Angeles,
CA 90043
Phone: (323) 413-3325
Email: Barnett.stephon @yahoo.com Objective My objective is to provide a technical skill which
has been enhanced by my training and certification in broadband
telecommunication systems installation, configuration, testing and
troubleshooting. Professional Experience 2007
- ???? Installation
Technician
Techforce
Catlettsburg, KY ·
Read all work orders and SMOP; Inventory
equipment and supplies; Installed flex grow at both CO and customer premise;
Tip and ring, shelf power and fiber jumpers; Set up permanent RF jumpers, T1
cable, mounted and punch down 66, 100 lock, ran, terminated RX, TX cable,
terminated all fiber cable, ran and terminated all CAT5 cable,
connected conduit ran AC through conduit, and terminated AC power ran switch,
formed and wire wrap all ds1’s, ran connected all BNC, formed and stitched
all signal cable; Ran, formed, stitched, crimped, put no-ox on lugs; formed
and terminated power cables. 2003-2007
Installation
Technician
Ajilon
Santa Ana, CA ·
Inventoried all equipment, tools and
supplies; Read all work orders, installed ADSL, HDSL, GODIGITAL, Nortel DMS
500, also ran fiber for SBC Colocage and TLS, installed Bits clock, master
shelf and expansion; Installed Adtrans, Hikemian, alarms, flashwave 4500,
Juniper, Calix, FTTP, added additional pairs to Cosmic-frame; Installed flex
grow at both CO and customer premise; Tip and ring, shelf power and fiber
jumpers; Wire wrap all ds1’s, ran connected all BNC, formed and stitched all
signal cable; Ran, formed, stitched, crimped, put no-ox on lugs; formed and
terminated power cables and ground on all of the above, ran STREAK
TEST, SINK TEST, did troubleshooting and TURN-UP on all of the above. 2001-2003
Wireless
Installer
Aerotek/Nortel
Los Angeles, CA ·
Troubleshoot and repair problems
associated with RF, AC, DC, portion of the forward and reverse plant, such as
transmission levels, signal losses, off-air interference, including
troubleshooting of optical power; Inventoried all equipment, tools and
supplies; Read all specs, floor lay out, fiber duct plans, leveled and
aligned CDMA bays, Dual Mode Urban 800 bay, installed permanent RF jumpers,
T1 cable, mounted and punch down 66, 100 lock, ran, terminated RX, TX cable,
and installed earthquake brace, Micro cell amplifiers, and radios ran and
terminated all fiber cable, ran and terminated all CAT 5 cable, connected
conduit ran AC through conduit, and terminated AC power ran switch, formed
and terminated all power for bays. Performed quality inspection and
commission on vortex test and turn-up on all of the above. Certifications And Training RWM
Fiber Optics, Inc. Carson, CA
2013 Certified
Satellite Technician -
RWM
2013 Certified
Broadband Premises Installer,
SCTE
2013 Certified
Fiber Optic Technician, FOA - CFOT#
217-0460
2013 Certified
Fiber Optic Specialist,
Connectors
2013 Certified
Fiber Optic Specialist,
Testing
2013 Certified
Home Audio & Video
Technician
2013 Certified
Security Surveillance & Alarm
Technician
2013 Certified
Premises Cabling
Technician
2013 Fiber
Optic Broadband Technician Fiber optic system design and installation Loss
Budget
, Fiber optic cable installation-ISP/OSP, Fusion splicing-Single strand &
Ribbon, Breakout, Loose Tube Distribution, OTDR, Testing &
Troubleshooting, Mechanical splicing & Emergency Restoration,
Termination/Connectorization, ST, SC, Light Source & Power Meter Testing,
OLTS, Mid Span Cable Prep & Splicing, FTTX Architecture and Build-Outs,
OSP Cable Prep and Splice Case Preparation,
Verizon & Time Warner Print Reading, Cut Sheets & As Builts Telephony
& Copper UTP Cabling Color Codes, 568 A&B Termination, Codes and
Standards: NEC, ANSI/EIA/TIA, Bonding and Ground, Conduit, Ladder Rack,
Telecomm Room, Punchdown Block 66, 110, Requirements and Layout, Cable Trays,
Media Center, Hangers & Pathways, Pull/Ter. CAT 5E, 6, RJ-11, RJ-45,
Patch Panel, Testing TDR, Tone and Probe, Butset Broadband Cable Television CATV Installation Principles Aerial and Underground
Drops, VOIP Installation Procedures, CATV Modem Installation Procedures,
Safety Policies & Procedures, ANSI/OSHA, Use Signal Level Meters and
Troubleshooting, Ladder Handling Safety Register and Continuity for Testing
Techniques Home Theater Home Theater Installation & Video Display, Audio
& Video configurations, Projectors, LCD, Plasma Mounting & Surround
Sound, DVR, IPTV, DVD, Blu Ray, Speaker Pre-wiring, Mounting &
Connecting, Signal Differential & Amplifiers, Wireless Basics &
Bluetooth Technology, Networking & Troubleshooting, Home Theater
Integration & Wireless CCTV, Surveillance & Alarm Surveillance & Alarm Installation, CCTV, DVR
& Analog Video Recorders, PTZ, Locking Systems & Infrared, Intercom,
Smoke Alarm & Detectors, Sensors, Network Systems &Troubleshooting,
Instruction Alarm Jordan/Lock
High
School
Los Angeles,
CA
REFERENCES Available Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Intermediate |
|
|
|