From: route@monster.com
Sent: Friday, September 11, 2015 1:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
ASLAM ALLI
KHAN
Mob:+966 540091248,+91 9853287782E mail:aslam
.detasad@gmail.com Technology
professional with excellent telecommunications (osp) and support skills. PROFESSIONAL
EXPERIENCE DETECON AL SAUDIA COMPANY LTD.(MOBILY PROJECT) Designation:-OSP Inspector (FTTH/FTTB/FTTX) Period:-29 may 2013 to till date ESSENTIAL DUTIES AND RESPONSIBILITIES: ·
Survey and identify the OSP routes
and its potential customer connectivity. ·
Supervise OSP construction
activities as per construction drawings. ·
Coordinates with subcontractor and
Customer to solving the all problem on site. ·
Project implementation as per
construction standards. ·
Prepare site diary as per project
implementation quantity. ·
Issue site instructions to
subcontractor. ·
Conduct PAT/FAT for the
implemented project. ·
Check Construction /As-built BOQ
and Drawings. ·
Identify the GPS coordinates for
the routes, manholes and customer location. ·
Daily activities include updating
drawings daily progress report. ·
Prepare all the paper works and
make asbuilt Drawing according to site. ·
Prepair
the BOQ and make the site diary. ·
Develop engineering specifications and follow engineering
standards for assigned projects. ·
Handle fiber
verification and mapping activities. ·
Perform construction
and maintenance of OSP infrastructure according to industry standards. ·
Determine scope,
budget and schedules for OSP projects ·
Complete the
assigned projects within the defined scope and timelines. O&M Inspector · Develop mitigation and restoration
procedures for emergencies conditions such as fiber damages, power failures
and other disasters. · Perform routine inspection of OSP
networks. · During cable cut I mobilize mobily contractor and
providing gaudiness for finding cable cut point. · Check quality of work in field like GSM, FTTB, FTTH, ODF,
FPP and RACK instillation. · Conduct MDT\TCN for final repair of damage cable. · Conduct handover of SNFN rout(Mobily,Bynat,ITC) · Supervise all the installation of ODB and MDF. · Supervise all the Civil and splicing work inside the main
hole and inside the shelter. · Maintain records of
fiber splicing and topography.
Dinesh Engineers Pvt.Ltd.Nerul,Navi Mumbai, India
Designation:-SITE
ENGINEER
Period:-1st Aug 2012 to 28 may 2013. DUTIES/RESPONSIBILITIES:Supervising and co-coordinating subcontracted service provider’s
deliveries with regard to outside plant construction civil work activities
like trenching,ducting, and required fiber optic installation/termination,
ensuring the project is delivering on scope, cost and time; Responsible for all aspects of construction inspection, asbuilts and
implementation and SIRITEL SYSTEMS PVT.LTD.
Nacharam, Hyderabad, India. Designation:-Installation & Commissioning Engineer Period:-21st March 2010 to 12th July 2012 Role &
Responsibilities. Co-ordination with
building/plaza owners,City district Government and other agencies for
preparation and finalization of Right of Way/Way Leave charges. COMPUTER SKILL
EDUCATION B.TECH in electronics & Telecommunication engineering continue in
Relevant institute of management & technology.
DIPLOMA in electronics & Telecommunication engineering from K.I.M.E.T
Angul, Odisha. H.S.C from Babujang high school, Babujang,Cuttack,Odisha
Name: - ASLAM
ALLI KHAN Father’s Name: - Anwar Alli Khan
D.O.B:- 01 / Feb / 1989
Sex:-Male
Pass-Port No:-J7317561 Marital
Status:-Unmarried
Language Known:-English, Hindi, Oriya, Urdu
Nationality:-Indian
Religion:-Muslim
Permanent address:- S/O:-ANWAR
ALLI KHAN
AT:-BAHABAL PUR
PO:-NISCHINTA KOILI
PS:- NISCHINTAKOILI
DIST:-CUTTACK
754207-ORISSA
I here by declare that all the above information
furnished by me is true to the best of my knowledge and given an opportunity,
I shall definitely prove my worth.
Date:3/09/2014 Place:SAUDI ARBIA
ASLAM ALLI KHAN |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|