From:                              route@monster.com

Sent:                               Friday, September 11, 2015 1:26 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Fred LeFevre 

Last updated:  07/26/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


The Colony, TX  75056
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: july2015

Resume Value: b9ywc857nmbt3ti3   

  

 

Fred Le Fevre

5408 Rutledge Ct,

The Colony, TX  75056

Cell: 972-786-6657

f.lefevre@sbcglobal.net

 

SUMMARY OF QUALIFICATIONS

·   MS Word, Excel, Power Point, Outlook, Access, Project , Excel for Project Managers, Construction Estimating w/ Excel

·   Six Sigma Project Management

·   Scoping Management

·   Applied Project Management / Boston University Corporate Education Center-Tech Skills

·   Construction Project Management Distance Program / Auburn University

·   OSP Engineering, Field Notes, Aerial, Buried and UG, Permitting and ROW Use

·   Aerial Distribution Pole-Line Design, Make-Ready, Guying & Anchoring, Loading

·   ETA Certification CFOI-OSP (#FOITX1005) Structured Cabling and F/O Installation 2002-2006

·   AT&T document access and record systems OPTI-NT and BSTCAD, LFACS, FACS-120, OPEDS, Map-viewer, OSP CM

·   VERAX Reporting & Management Database Administration

 

PROFESSIONAL EXPERIENCE

 

PEG Bandwidth                                                                                                    01/2013 – Present

Senior Construction Engineer & Fiber Backhaul Site Coordinator OSP / ISP

·   Maintains Schedules and Monitors All PEG Site Walks / Project Close-Outs

·   Tracks and Manage all Dark Fiber Initial and Pre-Construction Work Requests

·   Prepare and Submit Site Drawings for Transport and Submissions and Approvals for NTPS

·   Installation of HH and/or conduit to H-Frame, Shelter, or Outdoor Compound

·   Installation of Transport Cabinet and Appropriate Equipment/ Hardware, Connection of DC Power

·   Fiber to Compound and Splicing Status and Installation of MRV Switch and Testing

·   Obtain ROW, access, utility easement information from customer

·   Obtain A&E drawings, Prepare site plan, Redline site plan and Redline for NTP submission

·   Monitor status of NTPs and Monitor status of sites released to transport

·   Schedule installation of HH, conduit, transport cabinet, and equipment

·   Coordinate with fiber construction crews as to projected date of fiber to compound

·   Ensure HH and/or conduit is in place prior to arrival of fiber

·   Ensure transport cabinets are installed and powered prior to arrival of MW crews

·   Schedule connection of DC power, Install of MRVs, Assist with provisioning of MRVs

·   Inspect transport cabinet installations for quality control

·   Monitor and report status of site installations to Director of Operations on a daily basis

·   Monitor equipment orders, arrange delivery, storage and transport for cabinets, HHs, Hardware)

·   Respond to outages or equipment failures

 

 

Osmose Communications Services (BB Com) for Goodman Networks                                                      09/2012-1/2013

Century Link / Sprint FTTT / FTTH OSP Field Engineer MN

·   Fiber to the Tower and Fiber To the Cell Site Last Mile Fiber Optic OSP Design for 229 existing Sprint Sites

·   Site Assessment Design Survey for Sprint

·   Site Survey, OSP Site Requirements, BoM, Power Requirements, Scope of Work, Compound Drawings

·   Shelter and Racking requirements, Rooftops and Building Colocations

·   Aerial, Buried and Underground Design Make-Ready and Fieldwork

·   ROW Research, Permitting and Utility Research

 

 

 

 

 

 

 

RJE Telecom01/2012 – 09/2012

Windstream / Verizon Wireless Fiber to the Tower Construction Arkansas and WV Project

·   Long-haul and Backhaul Fiber Construction Management ,Supervision and Inspection to 177 existing cell sites

·   Supervised and Reviewed all Aerial Distribution Design and Make-Ready

·   Supervised and inspected general contractors and equipment responsible for aerial, buried and underground construction

·   Supervised and inspected splicing and testing of  fiber optic cable  installation

·   Verified all row and easement  requirements in advance of construction equipment

·   Verified all 3rd party utility agreements, specifications and regulations along route

·   Project Management Audit Group Staff

·   Project Management Audit Group Responsible for Finalization of Client Documentation and Contract Deliverables

·   Project Management Audit Group Responsible for Permit and ROW Close-out Processes

·   Project Management Audit Group Responsible for Authorized Service Provider(ASP) Invoice and Financial Reconciliation

 

 

Nexlink Global Services                                                                                                                        11/2011 – 01/2012

OSP Field Construction Supervisor for RUS / Stimulus Customer Projects

·   Long-Haul Fiber Project Supervisor in Missouri for Federal Stimulus / RUS Utility Client

·   Supervised general contractors and equipment responsible for aerial, buried and underground construction

·   Supervised splicing and testing of fiber optic cable  installation

·   Verified all row and easement  requirements in advance of construction equipment

·   Verified all 3rd party utility agreements, specifications and regulations along route

·   Supervised four (4) OSP inspectors in 36 mile fiber optic construction on MO DOT ROW

·   Supervised all aspects of staking, aerial construction and make-ready, guying, anchoring

·   Supervised all aspects of buried, sign and vault placements, conduit and boring construction applications

·   Reviewed OSP prints prior to construction and as-built documentation daily

·   Produced daily reports as required

 

Dynamic Technical Services, Corinth, TX5/2010 – 11/2011

FTTT / FTTH Construction Project Manager for AT&T

·   On-Premise at  AT&T in Oklahoma City  for FTTX  Projects FTTH, (FTTN-VRAD), FTTCS / ETTCS and FTTP

·   Fiber, Manhole / Hand-Hole and Conduit Placing

·   Additions and / or Arrangements to Cross Connect Cabinet

·   Placement of Properly Sized VRAD (Video Ready Access Deployment) Cabinet

·   Bonding and Grounding, Evergood Power Cabinet  Installation Requirements

 

 

Logical Link Inc., Bedford, TX                                                          10/2008 - 4/2010   

Wireless Implementation & Installation Project Manager for Zayo Bandwidth

·   Contracted to DSE/ Cobalt Construction for Zayo Bandwidth in Indiana for 200+ Existing Sites (with T-Mobile)

·   Third Party Contract Management for fiber access and dark fiber leasing, permit and row acquisition

·   EF&I Implementation, OSP/ISP IM & CPM for ASP’s, SOW, NTP, MOP’s, BoM, Site Walks, BTS installation

·   H-fixture construction, Nema & Hoffman Cabinet installations ,

·   Purcell Box and Chatsworth 19” Rack Installation , Security Cage and Decking Installation

·   Backboard Installation , Free Standing and Wall Mounted Ladder Racking Installation

·   Power Up, Turn-Up, Alarm Install, Verify Cross Connects, Maintenance Window Work

·   Wireline Fiber  Design, Fiber Backhaul / Backbone Fiber (Core) Infrastructure

 

 

 

 

 

 

 

Dynamic Technical Services, Denton, TX                                                        11/2003 - 8/2008 

Senior Manager of OSP Services / Infrastructure Project Manager

·   MCI WorldCom, AT&T, Verizon Business, Cox, and Time Warner Cable.

·   New Orleans to Houston to San Antonio Micro-Duct Fiber Placement Project including downtown New Orleans, Houston and San Antonio metro rings

·   The projects consisted of but were not limited to, fiber optic backhaul OSP and civil construction, wireless site survey and analysis, UMTS implementation, aerial, buried, UG, conduit, inspection, make-ready,  FTTN - VRAD's / FTTP -  FTTH / FTTCS - ETTCS,  ISP/OSP  building industry consulting, structured cabling solutions and collocations. Permit and ROW Acquisition.

·   Managed network services and infrastructure implementation Managed a Computer Assisted Design, Engineering and Construction staff of 25.

 

 

 

 

EDUCATION

Auburn University Extension , Construction Project Management8/2008 - 1/2010

·   CPM, CBM, Excel for PM, Construction  Estimating w/ Excel

·   Comp TIA Project+ ,  Comp TIA Network+

 

Boston University Corp Education Centers (Operated by Tech-Skills, LLC, - Addison, TX Campus)8/2008 - 1/2010

·   Project Management Professional (PMP) Diploma Program

 

College of the Mainland / Institute of Robotics Galveston County Campus, Texas City, TX9/2002 - 12/2002

·   Diploma - Certification - 60 Hours, Fiber Optic and Broadband Electronic Technology

·   (LAN / WAN), wireless #, data & voice, structured cabling, GPS, splicing / installation / theory)

 

CSU System - Colleges of Engineering and Continuing Education eLearning10/1998 - 12/2003

·   Cal State University @ Sacramento Diploma - Utility Management Program

·   Certificate – MS Project 2000

·   Cal State Poly University @ Pomona Diploma – MS Visio 2002

 

University of Missouri, Columbia, UM Extension, College of Public Admin & Governmental Affairs9/1983 - 10/1984

·   Diploma - City and County Planning and Plan Administration

 

 

PROFESSIONAL AFFILIATIONS

·   Texas Society of Telephone Engineers Member since 1986

·   BICSI Member (member #127374) since 1995

·   Electronic Technicians Association (ETA) Member (Certified Member #FOITX1005) since 2002

·   Project Management Institute (PMI) Member (member # 1384142) since 2009

·   American Management Association (AMA) Enrolled in management certification process

 

 

AWARDS RECEIVED (MCI)

Team 400 Monthly Award for Michigan Project04/1993

Team 400 Monthly Award for PCS Network Project0/1993

Team 400 Monthly Award for Mutual Signal Network Acquisition11/1993

Team 400 Monthly Award for FAA Redundancy Project0/1994

4th Quarter 1993 Facility Engineering Teamwork Award12/1993

Subject of Telephony OSP Magazine article for Innovative Construction Approach in San Luis Obispo, CA07/1994

Team 400 Monthly Award for Mexico Construction Project04/1995

 

Top of Form

 

 

Bottom of Form



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Fort Worth