Rodney Martin, PMP
Contact 408.710.9269 Technical Program Manager
rmart68@gmail.com Field Deployment
Engineer Atlanta, GA
Objective Seeking
Technical Project Management position with excellent benefits with immediate
goal of supervising and managing technical field teams and vendors
relationships. I am targeting permanent full time employment that will
allow me to work cross-functionally with engineering as a part of the
deployment team to utilize my technical field engineering background coupled
with my project management PMP transferable skill-set. My career path
includes the goal of continuing my education thru certifications and training
in the Information and communications Technology (ICT) environment increasing
my effectiveness in Technically Managing the deployment and/or
decommissioning of network elements. Portable Qualifications Project/Program Management PMP, W/Strong
technical applied knowledge of Networking Devices/Nodes, Strong understanding
of all Layers of OSI and/TCP/IP Troubleshooting methods. Technical
Documentation background and technical writing skill-set, Creating and
following Process Workflows and Method of procedures (MOPs) Proficient with
the use of VT emulators such as Hyper Terminal/Putty to provision network
nodes along with proprietary GUI to provision and connect nodes to
management. Because of the many OEMs that I work with I am pragmatic in
my approach with the use of any “Task Oriented Procedures” (TOPs) when
turning up, commissioning and testing nodes. I am also strong in my knowledge
of Telcordia gr1275 installation standards for safe and quality installations. Professional Experience IBOK-MTSJan
2013-Present Network Engineer ·
Perform Full
turn-key EFI&T of Access and Transport Network Equipment to include
Cabling, Power, Grooming and labeling A-B Loc. ·
Turn up,
Testing and Circuit Integration of Cisco
ONS 15454 Rel. 8.53 metro DWDM ROADM network ·
network
configurations (2 fiber ring [15 nodes], DWDM Mesh using wavelengths
as mesh fabric and a separate DWDM Mesh network using 40- ·
WXC-C
wavelength cross-connect cards and 4 degree optical patch panels, task also
included long and short OTDR shots to characterize fiber for DCU
reconfiguration during network
equalization phase. Google NetDeploy/ ARRIS Professional
Services Test Platform Development Engineer/PM (Cary, NC)2009-Oct-2012 Develop testing platform for Juniper Tbps
routers to include T1600,T640, T320 MX9603D,MX480, and Infinera DTC/MTC
chassis for supply chain group to re-deploy chassis. ·
Test and
monitor system-level operation, reset configuration back to factory, verify
interface status on all related components and record/publish test results
for deployment manager ·
Used Infinera
Graphical Node Manager (GNM) to delete old configurations removing Digital
Node Admin (DNA) removed facilities DLMs, XLMs,ADLMs and/or SLMs. Returned
TAMs, TOMs, PICs to supply chain group and re-bundled standard chassis. ·
Configure
routing engines using scripts and reloading latest JUNSO software revision ·
Redeploy
tested components to pop locations via Google supply chain vendor ·
Coordinate
with PMs to ensure that equipment ships protected in OEM packaging ·
Bundle
chassis for redeployment to pops and datacenters ·
Update inventory management
database to reflect asset location in the supply chain ·
Develop process workflows using
Visio to assist EU counter parts in duplicating efforts across testing
platform Program Manager/
Decommissioning Team
(Mountain View, CA) ·
Manage the US
decommissioning project between “client” and supply chain groups to include
outside vendors, third-party warehouse operators, and Google Logistics
Support staff ensuring projects are on schedule and within budget. ·
Schedule
equipment-decommissioning services outlined by Google by providing “client”
inventory information that is accurate and complete. ·
Manage and
track issues, action items, and milestones and report to “client” TPM ·
Supply
baseline and measuring matrix feedback to improve on services provided by
Google ·
Guarantee POP
site power and fiber has been turned down by “vendors” Engineers prior to
de-com activity ·
Arrange field
team to Decommission one POP site location per week on average for duration
of project outlined in project scope. ·
Create and
ensure that predefined process flows developed by Google are followed for all
activity related to the De-Com work. This included coordinated field
activity, shipping, receiving, warehouse movement and testing. ·
Ensure
compliance with all test specifications set forth by “client” and agreed upon
in SOW for each specific test deliverables ·
Ensure that material transfers are
made between Google warehouse material review board(MRB) locations and
(vendor) distribution centers. Project Manager/
Survey Team Pilot (Promoted PGMgr) ·
My primary function as PM for the
site survey teams was to manage 8 auditors as they gathered baseline
information. ·
Document network physical
inventory to create the logical links need to properly plan, manage, and
maintain the network. ·
Collect current snapshot of
buildings and their relationship to “client” sites. ·
Inventory the electronics in each
site down to the router level. ·
Trace patch cords between ports
and determine A to Z location and verifying which patch cords are active. ·
Document the power in each site. ·
Collect third party OSP data
surrounding each “client” site. ·
To fully audit all “client” owned
OSP facilities. Auditor Lead
(Promoted to PM) ·
As team lead my task included
opening site access tickets and PCRs for survey team ·
Performing On-Site Analysis of
Physical Network State. ·
Identification and Risk
Classifications of Network SPOFs within each POP visited and providing fixit
report to documentation team. Auditor (Promoted) ·
Teamwork Resolution on the Initial
De-Bugging of interim database during survey teat market ·
Continued Development of Equipment
Configuration Off-line Data Collection Forms for test market ·
Collected floor loading data for
non-standard client rack (POP Site Facility Inquiry) Nortel Networks
2008- 2009
Site Team Leader /
Installer
·
My primary function as STL to
follow EDP Engineering Documented Package for bay installation, securing bay
framework on slab and raised floor configurations, connecting bay frame
ground to office ground, connecting office battery to the Optical node,
slotting circuit packs, running inter office cabling to the SATT
(synchronization, alarms and telemetry terminations). ·
Installing DWDM filter module
assembly, installing and routing fiber cabling and STS coaxial on associated
OC nodes bays. ·
Cleaning optical connectors,
running and preparing Optical node BNC cabling for termination loop back
testing, prepare system for testing and customer turnover. Gibson
Technical Services (GTS)
2007- 2008 Project
Manager ·
As part of the Sprint
Communications 4G WIMAX LTE project, utilizing orthogonal frequency division
duplexing (OFDM) EVDO, provided contractor oversight and vendor management
for fixed priced and/or time and material contracts, which included
performing quality assurance and independent verification and validation
(IV&V) of contract performance. ·
Managed 1,200 sites in the
northeast region (NJ, PA, and NY), which included water towers,
self-supporting towers, rooftops, and monopoles/mono-pines. ·
Provided critical support for
senior project manager and engineering team ensuring resolution of technical,
access, or scheduling issues due to re-homing traffic and/or rebalancing of
the network. ·
Developed and cascaded weekly
action list to key stakeholders for review, tracking, and follow-up. ·
Led phase deployment kickoff
meetings to communicate critical project information, such as engineering
package (EDP), to installation team and System Lineup & Test
(SLAT). ·
Managed Project Change Control
e.g. schedule, scope, and budget ·
Established and managed to
critical dates required maintaining critical timelines, and preventing scope
creep. ·
Collected, compiled, audited, and
reported Anritsu sweep results for Alpha, Beta, and Gamma 4G WIMAX antennas;
submitted down-tilt verification information to engineering group. ·
Planned the agenda to facilitate
project team meetings and group conference calls. ·
Instrumental in maintaining
schedule sequencing, monitoring of critical path conflict issues, and
coordinating resolution of issues with engineers. ·
Provided inside/outside plant
documentation using CAD/Visio drawings for fiber run to the site. Scheduled
with vendors to set the outside entrance facility for the dark fiber lines (OSEF)
for fiber to the cell site (FTTCS). Nortel Networks 2006 - 2008 Project Coordinator (W-9 Contractor)
Hs1 certified ·
As part of the Sprint
Communications project Field Integration Team, provided contractor oversight
and vendor management for fixed priced and/or time & material contracts
such as performing quality assurance and independent verification and
validation (IV&V) of contract performance. CDMA, EVDO Network involved
tracking and coordinating system upgrades for 500 sites in Atlanta, GA. Data
Only Modules (DOM) and integration upgrades. ·
Defined project scope, guidelines,
and coordination of resources to execute project. Communicated
deliverables/milestone and directed staff internally/externally to ensure the
on time, on budget, and in spec delivery of products and projects. ·
Led group of 20+ direct/indirect
reports, which included project expeditors, functional project leads, and
business analysts, charged with managing a $10M project budget for network
EVDO Evolution Data Only Modules upgrade for CDMA network. ·
Improved project life-cycle
management support by adapting project to corporate capability, customer
needs, and service cost reductions. ·
Hands on project management and
development and implementation of new schedule tracking software.
Collaborating with 15+ cross functional teams and various business management
platforms, linked customer database at the Mobile Telephone Switching Office
(MTSO) and external suppliers across the enterprise. Ensured teams’ adherence
to budget, schedule, and scope. Received guidance from and reported
regularly to senior management on progress, obstacles, and suggested recommendations
for solutions. The New AT&T (formerly Cingular) 2004 - 2006 Project Coordinator (Contractor) ·
As part of the Field Integration
Team, responsibilities on the Cingular project included management of
cross-functional teams responsible for delivering project timelines for a
major E-911 Network Compliance. Managed all phases of the project life-cycle
process, from conception/initiation through closing, to delivery of specified
project equipment or service on time and within budget of project scope. ·
Liaised with client on
requirements and defined expectations for the Test, Turn-up, and commission
of the True Position LMU for E911. ·
Facilitated interviews and
client/team meetings. ·
Managed budgets, tracked expenses,
and financial reporting on both projects and company overall baseline
tracking. ·
Developed plan of action, which
included deliverables and MS project timelines for completion and explanation
of variances. Monitored and resolved issues and action logs. WinSTAR
2000 – 2001 Fiber Implementation
Manager SE, Network Analyst (W-9 Contractor) ·
As Network Construction and
Deployment Manager of the Lucent Network, responsibilities included
distribution of Backbone and Campus environments. (Long haul and Metro ring
construction). ·
Managed budgets for customer
projects. ·
Interfaced with local, state,
federal, and private entities to develop cost-effective implementation of
dark fiber rollout. ·
Provided stakeholder input to
project management staff to ensure delivery of customers’ networks
installation of transport equipment, on time and within scope. ·
Regularly reported the status of
projects directed by the Customer Implementation Department ensuring
compliance with departmental and corporate internal controls and processes. ·
Conducted installations with the
highest level of ethical and business standards while using the greatest
degree of professional integrity. ·
Facilitated site acquisition,
zoning negotiations, and planning sessions. ·
Facilitated Notice to proceed
(NTP) and managed overall construction activities. ·
Disseminated information to
appropriate stakeholders e.g. A&R as build drawings. ·
Submitted RFPs and RFQ for
sub-contractor bids. ·
Participated in zoning and
planning meetings. ·
FCC Form 601: Application for
Wireless Telecommunications Bureau Radio. ·
FCC Form 327: Application for
Cable Television Relay Service Station Authorization. ·
Provided all necessary technical
and administrative data for the application. ·
Provided appropriate schedules (A,
C through E) and required attachments. ·
Managed submission process from
coordination through to application completion. Williams Communications1997 - 2000 Technical
Coordinator, SE Region ·
Managed the SE Region maintaining
approximately 118 sites. ·
Addressed and resolved any
technical discrepancies and maintenance issues in the SE region. ·
Developed technical Method of
Procedure (MOP) and Standard Operating Procedure (SOP) documents for all
planned network maintenance on the Williams Network. ·
Represented operations during
Emergency Restorations and Hot-Cuts in the event Williams fiber was damaged
by third party or required relocation. ·
Monitored network integrity
issues; developed and maintained new Williams engineering standards manual. ·
Conducted technical training
ensuring the effective training of technicians on the latest test equipment
such as the T-Bird, Cer-jack Omni BER testers, Digital Lightwave, and OTDR’s. ·
Developed specification manuals
and MOP’s ensuring uniformity across the Network. Implemented a quality
assurance program to deliver training course for new network standards. ·
Received directions from and
reported regularly to senior management on progress, obstacles, and provided
recommendations for solutions. ·
Earlier positions included
Operations Technician and a leadership role as Supervisor of South
Florida. Nortel Networks
1994 – 1997 Tester/Installer (W-9 Contractor) ·
Installed Nortel’s OC-3 to OC-192
Level to customers such as IXC, Quest Communications, and Williams
Communication. ·
As a key member of the SLAT team,
provisioned, tested, and Turn up of the Nortel Transport Nodes. ·
Trained installation team on
proper usage of test equipment and proper procedure for creating DS3 BNC
cross connects and other peripheral connections. ¾ Proficiencies
¾ Juniper
Tbps routers to include| JUNSO CLI| T1600,T640,T320 MX9603D,MX480| Planning |
Infinera DTC/MTC| Cisco ONS 15454 | DWDM ROADM| OTDR FOT | JDSU MTS 4000,6000
and 8000 | BERT Testing| OTDR Fiber Testing | Fiber Characterization |
Infinera Graphical Node Manager (GNM)| GBICs | PICs Communication OSC |
HyperTerminal/Putty | Node Planning System (NPS) | orthogonal frequency
division duplexing (OFDM) |Dispersion Compensation (DCM) | GMPLS | Carrier
Ethernet | FTTx | GPON | Fiber backhaul | OSP/ISP | Triple Play
Services| ¾ Education ¾ B.S. Technical
Management Devry University,
Philadelphia, Pennsylvania (anticipated graduation date December 2014) ¾ Certificates ¾ PMP Certification,
Project Management Institute, Atlanta GA Project Scheduling,
Kennesaw State University Professional Development Unit Certified Fiber
Characterization Engineer (CFCE) HVAC Universal
certified, EPA JUNSO Certified CLI
interface Test candidate for
CCIE exam HS1 OC 3, 12, 48,
192, & 768 OpTara certified, Nortel Super MOR (Optical
Repeater) certified, Nortel Train-the-Trainer
CMA 4000 OTDR certified, Williams Communications/Level 3 Fiber Optic Testing,
Splicing, & Connectors certified, Crowder College BellCore Standard
Certificate of completion ¾ Achievements ¾ President’s Award of
Performance Excellence - Williams Communications. Developed Accelerated
Iterative 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|