From: route@monster.com
Sent: Friday, September 11, 2015 1:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Fred Le Fevre 5408
Rutledge Ct, The
Colony, TX 75056 Cell:
972-786-6657 f.lefevre@sbcglobal.net SUMMARY
OF QUALIFICATIONS · MS Word, Excel, Power Point, Outlook, Access, Project , Excel for
Project Managers, Construction Estimating w/ Excel · Six Sigma Project Management · Scoping Management · Certification in Applied Project Management / Boston University · Construction Project Management Program / Auburn University · ETA Certification CFOI-OSP (#FOITX1005) Structured Cabling and F/O
Installation · AT&T document access and record systems OPTI-NT and BSTCAD, LFACS,
FACS-120, OPEDS, Map-viewer, OSP CM · Experienced Ex-Pat with passport enabled PROFESSIONAL
EXPERIENCE Golden
Field Services for PEG
Bandwidth
02/2013 – Present Fiber
Backhaul Site Coordinator OSP / ISP · Maintains Tracker /
Schedule and Monitors Site Walks / Project Close-Outs · Prepare and Submit
Site Drawings for Transport and Submissions and Approvals for NTPS · Installation of HH
and/or conduit to H-Frame, Shelter, or Outdoor Compound · Installation of
Transport Cabinet and Appropriate Equipment/ Hardware, Connection of DC Power · Fiber to Compound
and Splicing Status and Installation of MRV Switch and Testing · Obtain ROW, access,
utility easement information from customer · Obtain A&E
drawings, Prepare site plan, Redline site plan and Redline for NTP submission
· Monitor status of
NTPs and Monitor status of sites released to transport · Schedule
installation of HH, conduit, transport cabinet, and equipment · Coordinate with
fiber construction crews as to projected date of fiber to compound · Ensure HH and/or
conduit is in place prior to arrival of fiber · Ensure transport
cabinets are installed and powered prior to arrival of MW crews · Schedule connection
of DC power, Install of MRVs, Assist with provisioning of MRVs · Inspect transport
cabinet installations for quality control · Monitor and report
status of site installations to Director of Operations on a daily basis · Monitor equipment
orders, arrange delivery, storage and transport for cabinets, HHs, Hardware) · Respond to outages
or equipment failures Osmose
Communications Services (BB Com) for Goodman
Networks
09/2012-1/2013 Century
Link / Sprint FTTT OSP Field Engineer MN · Fiber to the Tower and Fiber To the Cell Site Last Mile Fiber Optic
OSP Design for 229 existing Sprint Sites · Site Assessment Design Survey for Sprint · Site Survey, OSP Site Requirements, BoM, Power Requirements, Scope of
Work, Compound Drawings · Shelter and Racking requirements, Rooftops and Building Colocations · Aerial, Buried and Underground Design and Fieldwork · ROW Research, Permitting and Utility Research
RJE
Telecom
01/2012 – 09/2012 Windstream
/ Verizon Wireless Fiber to the Tower Construction Arkansas and WV Project · Long-haul and Backhaul Fiber Construction Management ,Supervision and
Inspection to 177 existing cell sites · Supervised and inspected general contractors and equipment responsible
for aerial, buried and underground construction · Supervised and inspected splicing and testing of fiber optic
cable installation · Verified all row and easement requirements in advance of
construction equipment · Verified all 3rd party utility agreements, specifications and regulations along route · Project Management Audit Group Staff · Project Management Audit Group Responsible for Finalization of Client
Documentation and Contract Deliverables · Project Management Audit Group Responsible for Permit and ROW
Close-out Processes · Project Management Audit Group Responsible for Authorized Service
Provider(ASP) Invoice and Financial Reconciliation Nexlink
Global
Services
11/2011 – 01/2012 OSP Field
Construction Supervisor for RUS / Stimulus Customer Projects · Long-Haul Fiber Project Supervisor in Missouri for Federal Stimulus /
RUS Utility Client · Supervised general contractors and equipment responsible for aerial,
buried and underground construction · Supervised splicing and testing of fiber optic cable
installation · Verified all row and easement requirements in advance of
construction equipment · Verified all 3rd party utility agreements, specifications and regulations along route · Supervised four (4) OSP inspectors in 36 mile fiber optic construction
on MO DOT ROW · Supervised all aspects of staking, aerial construction and make-ready,
guying, anchoring · Supervised all aspects of buried, sign and vault placements, conduit
and boring construction applications · Reviewed OSP prints prior to construction and as-built documentation
daily · Produced daily reports as required Power
Constructors
Inc
3/2011 – 9/2011 FTTT
Construction Project Manager for AT&T Oklahoma · Turnkey FTTCS / ETTCS Projects in Oklahoma · Design, Inspection, Construction and Documentation aspects of each
existing site · Installation of Ciena, Mux, Optical Distribution Enclosure (ODE)
and (FDF) Fiber Distribution Frame · Bonding and Grounding Fiber Requirements for Telco · Fiber Placement in Compound & Shelters · H-Fixture and Nema Cabinet Installations ComForce
1/2011 – 3/2011 FTTT /
OSP Field Engineer, AT&T Baton Rouge, LA · OSP field-work and inspection for fiber construction of existing FTTCS
projects in Bell South Territory · Design of last mile aerial or buried fiber to cell sites · Responsible for all cell site owners regulations and row, easement
& permitting requirements for each site · Responsible for all 3rd party utility requirements including RUS clients for each site Dynamic
Technical Services, Corinth,
TX
5/2010 – 12/2010 FTTT
Construction Project Manager for AT&T · On-Premise at AT&T in Oklahoma City for FTTX
Projects (FTTN-VRAD) FTTCS / ETTCS and FTTP · Fiber, Manhole / Hand-Hole and Conduit Placing · Additions and / or Arrangements to Cross Connect Cabinet · Placement of Properly Sized VRAD (Video Ready Access Deployment)
Cabinet · Bonding and Grounding, Evergood Power Cabinet Installation
Requirements Logical
Link Inc., Bedford,
TX
12/2009 - 4/2010 Wireless
Implementation & Installation Project Manager for Zayo Bandwidth · Contracted to DSE/ Cobalt Construction for Zayo Bandwidth in Indiana
for 200+ Existing Sites (with T-Mobile) · Third Party Contract Management for fiber access and dark fiber
leasing, permit and row acquisition · EF&I Implementation, OSP/ISP IM & CPM for ASP’s, SOW, NTP,
MOP’s, BoM, Site Walks, BTS installation · H-fixture construction, Nema & Hoffman Cabinet installations , · Purcell Box and Chatsworth 19” Rack Installation , Security Cage and
Decking Installation · Backboard Installation , Free Standing and Wall Mounted Ladder Racking
Installation · Power Up, Turn-Up, Alarm Install, Verify Cross Connects, Maintenance
Window Work · Wireline Fiber Design, Fiber Backhaul / Backbone Fiber (Core)
Infrastructure Logical
Link Inc., Bedford,
TX
8/2008 - 12/2009 Wireless
Implementation Engineering Design Project Manager Goodman Networks · Goodman Networks Boston/Providence Market Comcast Project (with
T-Mobile) · Site Assessment Design Survey for Comcast equipment roll-out in excess
of 800 existing sites · Site Survey, OSP Site Requirements, BoM, Power Requirements, Scope of
Work, Compound Drawings · Axerra AXN10 & Ciena 311, Ethernet To The Cell Site (ETTCS)
Install Feasibility · DAS Hub Equipment and Shelter Design Feasibility Indoor and
Outside Proposed Locations · Siterra Management Software Dynamic
Technical Services, Denton,
TX
11/2003 - 8/2008 Senior
Manager of OSP Services / Infrastructure Project Manager · MCI WorldCom, AT&T, Verizon Business, Cox, and Time Warner Cable. · New Orleans to Houston to San Antonio Micro-Duct Fiber Placement
Project including downtown New Orleans, Houston and San Antonio metro rings · The projects consisted of but were not limited to, fiber optic
backhaul OSP and civil construction, wireless site survey and analysis, UMTS
implementation, aerial, buried, UG, conduit, inspection, FTTN - VRAD's / FTTP
- FTTH / FTTCS - ETTCS, ISP/OSP building industry
consulting, structured cabling solutions and collocations. Permit and ROW
Acquisition. · Managed network services and infrastructure implementation Managed a
Computer Assisted Design, Engineering and Construction staff of 25. TXU
(Texas Electric Utilities) / TXU Communications, Dallas,
TX
8/1995 - 10/2003 Transport
Construction Manager · Construction Project Management of internal assets and customer
premise aerial and UG facilities such as transport, carrier, collocation,
fiber, wireless, coaxial, copper and REA/RUS implementation as well as
facility maintenance. · Design and construction methodologies for fiber optic ground wire
(FOGW), broadband over power line (PDSL) and universal mobile telephone
systems (UMTS); this included design and construction of sixty-six
Independent School District fiber optic systems in the state of Texas. Fiber
Installation to and maintenance of largest privately owned mobile radio
network in Texas. · Member of acquisition team for integration of Lufkin-Conroe Telephone
Co and Fort Bend Telephone Co assets and facilities. Microwave
Communications Inc (MCI) / MCI International, Richardson,
TX
3/1986 - 7/1995 OSP
Facilities Construction Manager · Domestic and international joint construction management of long-haul
and metro fiber optic implementation projects including but not limited to:
Jacksonville, FL to Los Angeles, Houston to Chicago, Seattle to San
Diego, El Paso to Denver, St. Louis to Kansas City and Metro Rings for
Houston, San Antonio, Mobile, Raleigh-Durham, Memphis and Detroit · Construction Methodologies used; underground, buried, aerial,
building, microwave / wireless / pcs, optical ground wire, railroad row
placement and restoration & upgrade (maintenance) projects. · Fiber installations to one of the largest microwave networks in the
world. · Projects constructed and managed in thirty-eight (38) states and
several foreign countries including, Canada border crossings, Mexico border
crossings and 9500 km fiber route in Mexico, Guam 20 mile fiber optic buried
project, Belize 56 mile fiber optic system with British Telecom ranging in
value from $100K to $250 Million. · Was on PCN / PCS initial trial team and acquisition teams for the
integration of Western Union, Southern Net, Mutual Signal, and other
purchased assets. National Science Foundation Network Ring (NSFNET) at UM in
Ann Arbor and UT, Dallas, Austin, Arlington, Permian Basin and El Paso campus
locations. EDUCATION Auburn
University Extension , Construction Project
Management
8/2008 - 1/2010 · CPM, CBM, Excel for PM, Construction Estimating w/ Excel · Comp TIA Project+ , Comp TIA Network+ Boston
University Corp Education Centers (Operated by Tech-Skills, LLC, - Addison,
TX
Campus)
8/2008 - 1/2010 · Project Management Professional (PMP) Program College
of the Mainland / Institute of Robotics Galveston County Campus, Texas City,
TX
9/2002 - 12/2002 · Diploma - Certification - 60 Hours, Fiber Optic and Broadband
Electronic Technology · (LAN / WAN), wireless #, data & voice, structured cabling, GPS,
splicing / installation / theory) CSU
System - Colleges of Engineering and Continuing Education
eLearning
10/1998 - 12/2003 · Cal State University @ Sacramento Diploma - Utility Management Program · Certificate – MS Project 2000 · Cal State Poly University @ Pomona Diploma – MS Visio 2002 University
of Missouri, Columbia, UM Extension, College of Public Admin &
Governmental
Affairs
9/1983 - 10/1984 · Diploma - City and County Planning and Plan Administration PROFESSIONAL
AFFILIATIONS · Texas Society of Telephone Engineers Member since 1986 · BICSI Member (member #127374) since 1995 · Electronic Technicians Association (ETA) Member (Certified Member
#FOITX1005) since 2002 · Project Management Institute (PMI) Member (member # 1384142) since
2009 · American Management Association (AMA) Enrolled in management
certification process AWARDS
RECEIVED (MCI) Team 400
Monthly Award for Michigan
Project
04/1993 Team 400
Monthly Award for PCS Network
Project
0/1993 Team 400
Monthly Award for Mutual Signal Network
Acquisition
11/1993 Team 400
Monthly Award for FAA Redundancy
Project
0/1994 4th
Quarter 1993 Facility Engineering Teamwork
Award
12/1993 Subject
of Telephony OSP Magazine article for Innovative Construction Approach in San
Luis Obispo,
CA
07/1994 Team 400
Monthly Award for Mexico Construction Project
04/1995
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|