From:                              route@monster.com

Sent:                               Friday, September 11, 2015 1:26 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

'Leke Adanlawo 

Last updated:  04/22/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Fishers, IN  46037
US

Mobile: (817) 264-1613   
adanlawoleke@yahoo.com
http://www.linkedin.com/pub/oluleke-adanlawo/1a/2a9/8b0
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Implementation Engineer

Resume Value: j6qc3feqzwp2wnmc   

  

 

 

 

 

 

OLULEKE ADANLAWO

(US Citizen)

11712 Steamboat Drive, Apt 2316, Fishers, IN 46037

Phone: (817) 264-1613                                                                      Email: adanlawoleke@yahoo.com

http://www.linkedin.com/pub/oluleke-adanlawo/1a/2a9/8b0

OBJECTIVE

An Engineering position where my excellent technical skills and wealth of experience will be used to add value, solve problems and drive innovation.

 

Core Competencies

* Equipment Engineering* Scope Engineering* Proficient Auto CAD

* Network Migration and Integration * Equipment Engineering * OSP Engineering

* Project Management * Cell Site Construction * Construction Management

* Problem Solving * Computer Operations * Engineering Documentation

* Troubleshooting * Installation and Commission * Team Training & Mentoring

* Conflict & Dispute Resolution* HVAC requirement calculation

* Product Evaluation and Testing * Proficient Auto CAD

* Microsoft Office: Word, Excel, Visio, Outlook, Project, Power point

 

CERTIFICATION

·   Ericsson RBS LTE Certified

·   Ericsson RBS UMTS Certified

·   Ericson MS RBS 6000 CDMA/LTE

·   MA Commissioning, MAVE Commissioning

·   Project Management Professional PMP (In view)

·   PE (In view)

PROFESSIONAL EXPERIENCE

Samsung Network Services America

IMP Engineer.

LTE/CDMA: Samsung– Sprint/Region 3; Region 10Jul. 2013-Mar. 2015

·   Migration of NV from legacy BTS (MetroCell)/Lucent to Samsung MMBS (Multi Media Base Station). Migration of over 150 Cell sites.

·   Conducting Migration 1 and M 2 on TDM, fiber and Micro wave with various configurations.

·   Configured and supported Cisco ASR 901 routers installation, upgrading the Cisco IOS image, Install AdvancedMetroIPAccess license, and scripts and troubleshot.

·   Installed 4G expansion of 2.5 MHz TDD LTE DU shelves, commissioned and ATPed

·   Conducted over T1 cabling and troubleshooting for over 120 sites

·   Conducted Acceptance Test Procedure (ATP) for over 200 sites

·   Troubleshooting and alarm clearing on the MMBS and BBU cabinets

 

Avion Systems. GA, USASep. 2012-Jul. 2013

PM/Lead Engineer.

LTE/CDMA: Ericsson – Sprint/FL

·   Installation, commissioning and integration of LTE RBS 6102; RBS 6201 Cabinets with and without BBU.

·   Perform hotslide on the legacy BTS (MetroCell).

·   Perform the 1xVoice RBS integration, verify the DBA is up, voice carriers and sectors are taking voice traffics, activating the AEM card and verify that the DBA EVDO is Blossom and taking data traffics.

·   Perform NV migration from the legacy BTS (MetroCell) to RBS (DBA), and verify the DBA and the AEM card is up, voice and data carriers are enabled/fully_blossom, and taking traffics.

·   Perform the 1xVoice RBS and DOM Daisy Chain migration from the legacy BTS (MetroCell) to the RBS (DBA), and verify the DBA is up, voice carriers and sectors are blossom and taking voice traffics, and data calls on the MetroCell.

·   Perform an SIU cutover

·   Perform SIU/DOM Daisy Chain cutover

·   Perform the SIU integration that will convert the T1s to Ethernet backhaul via the SP 210/310.

·   Integrations on 4G LTE DULs on fiber Backhaul, and 3G 1900/800 DULs with SIU on T1, with various configuration; Temp Ground Mount , Tower Mount, Full build.

·   Upgrade 3G, 4G Software Packages on the DUL and ensuring right connections are made from the DUL to the XMU, and to the SP210/310 and SIU in the case of SIU conversion.

·   Perform hardware upgrade on the Legacy BTS (MetroCell) from DCG to eDCG.

·   Troubleshooting and clearing of alarms on the Legacy BTS (MetroCell) and RBS (DBA) shelf.

·   Performing QScoping of SP in the BOX.

·   Prepare engineering documentation for site activity to E///.

LTE: Ericsson – Sprint/TX

·   Coordinates site activities and ensure that all team members working to meet the Project goals.

·   Ensure all E/// and customer safety guidelines and procedures are followed during the project.

·   Prepare status report on the progress of project for E///.

·   Supervise, coordinate the activities of team members

·   Prepare daily schedules and ensure that they are followed.

·   Attend progress meetings and conference.

·   Troubleshoot any problem as required during the project.

·  Prepares regular interval progress reports as required by the project

·  Prepare documentation for the Battery audit, track change order, write claims, order and return materials.

Quanta Wireless Solutions-TX, USAMar. 2012- Sep 2012

Engineer.

LTE: Ericsson – AT&T/TX

·   Commissioning and integration of LTE DUL solution, including installing GPS antenna

·   Scratch Load Basic package, site specific configuration scripts

·   Prepare and terminate transport on SIAD to DUL

·   Call testing including. CSFB and PSAP SIM

·   Alarm Clearing and Troubleshooting

UMTS Ericsson – AT&T/TX

·   UMTS 1st, 2nd, 3rd, 4th, and 5th Carrier Commissioning and Integration DUW solution.

·   UMTS 3rd and 5th Carrier Installation, Commissioning and Integration OBIF solution

·   UMTS 1st, 2nd, 3rd and 4th Carrier installation, commissioning and Integration on AT&T project.

·   Node-B Alarms/Faults Troubleshooting, RSSI and VSWR troubleshooting.

·   Smart Laptop integration of UMTS 1C, 2C, 3C, 4C and 5C and troubleshooting where necessary on AT&T projects

·   Review site specific configuration scripts to confirm it accuracy for integration.

·   Verify Transport to OSS and Troubleshoot when necessary.

·   Performing a split power integration

·   Creation of sites Close out package reports and customer presentation.

·   Hardware installation, Commissioning, configuration and integration of Node B

Avion Systems. GA, USAJul. 2010-Mar.2012

Engineer.

UMTS 1st, 2nd, 3rd and 4th Carrier Commissioning and Integration AT&T

·   F1 & F2 Commissioning & Integration of UMTS RBS 3206/3106/3418/3518

·   Terminate AC/DC and power up Node. Scratch Load Basic package, site specific configuration scripts.

·   Verify Transport to OSS and Troubleshoot when necessary.

·   Prepare and terminate T1 cables to Node-B, Coordinate with NIC & ATT switch on Integration

·   Alarm verification and testing. Circuit /Packet/E911 Call testing on all sectors.

·   Upgrading SW on the Node using FTP program and EMAS.

·   Preformed Ericsson WCDMA/LTE Equipment installation, commissioning, and integration and troubleshooting for AT&T, Metro PCS and Verizon Projects.

·   Hardware installation, Commissioning, configuration and integration of Node B, eNode B.

 

Commscope/MPCS

·   Install UL approve component to wireless Integrated Electronics Outdoor Cabinets, and ensure that Cabinets confirm to Underwriters Laboratory (UL) standards

UMTS 1st, 2nd and 3rd Carrier upgrade AT&T Scoping (Equipment Engineering)

·   Review cell site survey document and upload to Client Data base (Siterra).

·   Create accurate and executable Scope of Work (SOW) for the required site construction/ modifications based on documented information made available, such as RFDS sheets, Site Survey sheet, site photos, and construction document and populate them in an OOM.

·   Create the Bill of Materials (BOM) that accompanies this SOW taking into account any and all site nuances such as number of lines, or number of sectors.

·   Quote the SOW and submit these quotes as required for starting the budget creation and material ordering process         

·   Modify the quote as required per the Project Manager (PM) through the life of the project

·   Design the configuration of AT&T cell sites in the Gulf States Region, about (Ericsson 3G sites).

·   Determine the layout, equipment/parts/cabling needed, appropriate power supply, and convert into AutoCAD drawings where necessary then place orders.

 

LTE (Long Term Evolution) / 4G

Ericsson - MPCS/Verizon FL

·   Installation, commissioning and integration of LTE 6201 Cabinets including Commscope enclosure with or without BBU. Install ac/dc and transport conduits, terminate ac or dc cables and power up equipment.

·   Prepare and terminate T1/ETH cables to E-NodeB,

·   Scratch Load Basic package, site specific configuration scripts.

·   SIU integration

·   Deblock S1 interface and cells, coordinate with NIC and troubleshoot when necessary.

·   Alarm verification and testing. Data Packet Call testing on all sectors.

·   Alarm Clearing and Troubleshooting

 

MTN Nigeria Communications Ltd. Lagos, Nigeria.Sep. 2007-Feb2010

Design Engineer/PM.

·   Develop the specification for introduction of 3G network to MTN Nigeria

·   Develop site build solution that reduce cost of site build by 40%

·   Develop Collocation Specification for National Operators in Nigeria.

·   Develop specification and schematic design for deployment of Worldwide Interoperability for Microwave Access (WiMAX) technology in MTN Nigeria.

·   Conduct field survey, recommend solution for Fiber Optic Cable (Plant) route protection

·   Conduct trial for the migration from BTS 3012/RBS 2206 & BTS 312/RBS 2202 (Indoor Cabinet) to BTS 3900A/RBS 2116 (Outdoor Unit) and develop the specification for the migration.

·   Conduct trial for the migration of the RF 7/8” cable from Copper coaxial cable to 7/8” FXL780 Coaxial Cable aluminum.

·   Conduct trial for the migration from Dual band Antenna to Triband Antenna, the installation and configuration of the Remote Electrical Tilt (RET)

·   Conduct trial to determine the performance and profitability of installing Tower Mounted Amplifier (TMA)

·   Specify Design requirement for Tower to be purchased and conduct Tower audit to ascertain suppliers’ compliance with MTN N specification.

·   Specify the criteria for acceptance of pile construction/installation

·   Conduct trial for Diesel Consumption reduction initiative

·   Develop specification for Aerial Cable installation

·   Develop specification for installation RDLU that will be used for FTTx

·   Develop a Yellowatt Security Bunker/Flat Packed specification, a security initiative to prevent fuel theft

 

WorleyParsons-DeltaAfrik Engineering Limited. Lagos, NigeriaNov. 2006-August 2007

Cad Designer-Civil / Structural

Projects: Delta South Quarters Project (Chevron Nigeria Ltd.); Oso-Condensate Pipeline Replacement Project (MPN); Etim Asasa Development Project (MPN)

·   C.A.D. design of Riser Guard and Riser Clamps, Mezzanine Deck Extension, Cellar & Sump Deck Extension, Antenna platform framing, grating & handrail, Equipment & Pipe support and generating Material Take off (MTO) for it

 

EGYPRO NIG. LTD. Lagos, Nigeria/IHSDec. 2002 – Oct. 2006

Engineer

·   Conduct Technical Site Survey (Field Survey) for over 120 BTS cell sites

·   Supervise the subsurface investigation

·   Executed daily operations of preparing of civil, structural and site location drawings of cell sites on AUTOCAD and other software packages

·   Making as built drawings, Cell site Grounding drawings and site documentations of Cell sites handled by the company with AUTOCAD and others software packages

·   Coordinates construction scheduling of BTS/MSc Cell Sites for Mobile Telecommunication.

·   Generating and maintaining document control system

·   Setting up and maintaining a library\archive of all Site documents

·   Establishing and implementing document distribution matrices to ensure that key project documents, including drawings are issued to the appropriate parties within and without the company for review approval or information as appropriate

·   Conducts Site Survey and inspection for Proposed & As-Built Layout on various Cell Site /Central Office.

 

 

EDUCATION

Federal University of Technology, Akure, Ondo State, Nigeria

Post Graduate Diploma (PGD) Civil Engineering (Structures) 2000-2002

The Federal Polytechnic, Bida, Niger State, Nigeria

Higher National Diploma (HND) Civil Engineering (Structures) 1994-1998

 

PROFESSIONAL MEMBERSHIP

Project Management Institute. (P.M.I.)

American Society of Civil Engineers (ASCE)

 

Training

MTN/MDATA Solutions - 8335 Academy Rd, Ellicott City, MD 21043 USA

P.M.P. Exam preparatory course

American Red Cross

First Aid, CPR and AED Certified

 

 

Excellent References Available Upon Request

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

IMP Engineer

Samsung Telecommunications America, L.P.

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Implementation Manager / Project Manager / Design Engineer

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-IN-Indianapolis

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent

Hausa

Beginner

Yoruba

Fluent