From: route@monster.com
Sent: Friday, September 11, 2015 7:46 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
David Nadell dln1957@hotmail.com 617-823-2077 (C) Boston,
MA Residence:Nashville, TN Residence: 24 Joyce
Av6045 Nautical St Whitman,
MA 02382Smyrna, TN 37167 BACKGROUND: Over 35
years of hands-on Telecommunications field expertise, including OSP
Engineering / Planning (Copper and Fiber/Electronics), Facilities and
Building Infrastructure/Central Office Engineering (Space, Power,
Environmentals, and Transport / Switching Equipment design), and Project /
Vendor Management. Core competencies include a strong technical
background in the installation and maintenance of electronics, equipment
chassis, power, and circuit packs associated with complex mission critical
copper/fiber voice, data, and video services; budget
preparation/administration/reconciliation; project scheduling and
coordination; inventory control; material
ordering/shipping/tracking/warehousing; construction permits; ROW
negotiations; contract design/build services; and system software
applications testing. PROFESSIONAL
EXPERIENCE: UC/Synergetic,
Inc – Mansfield, MA (a wholly-owned subsidiary of Pike Electric, Inc.) Engineering
Project Manager/Field Manager 9/4/2007
- Present - Lead
Cross-Functional Team of Engineers, Designers, Drafters, and Client Personnel - Project
Manage Metro Philadelphia Fiber-To-The-Premise (FTTP) Design/Build Project - Install, Maintain, and Repair both Copper and Fiber fed DLC/SLC/PLC
Electronics (On-Site Field Work) - Adhere to equipment lock out; isolation tag; maintenance windows;
and safe time procedures - Perform
Budget Analysis/Tracking/Reconciliation of Project Costs; Vendor/Contract
Administration -
Review/Authorize Material Orders; Ensure Optimal Inventory Levels - Read
Blueprints and Construction/Equipment Drawings -
Mentor/Develop Colleagues and Supporting Staff; Group Safety Warden - 30%
Travel Verizon
Communications, Inc – Boston, MA
(Retired Early w/ 27.5 years service) Technical
Field Consultant – Outside Plant Engineering Sr.
Technical Specialist 8/16/2004
- 8/31/2007 -
Technical Lead for Fiber-To-The-Premise (FTTP) OSP Capacity Management
Requirements -
Identify Capacity Management Requirements for Voice, Data, and Video Network
Elements - Provide
Tier II Support for Proprietary Capacity Management Systems - Subject
Matter Expert (SME) for OSP Inventory Requirements and Network
Monitoring/Surveillance at: SDLC Requirements Gathering Sessions (RGS) SDLC
Business Requirements Documentation Forums (BRD) User
Acceptance Testing for System Software Upgrades/Enhancements (UAT) - Manage
International/Off-Shore Vendors and Domestic/On-Shore Vendors for Database
Conversion - Read
Blueprints and Construction/Equipment Drawings -
Interpret/Translate Technical Documents into Software Application
Requirements -
Mentor/Develop Colleagues and Supporting Staff; Building Safety Manager - 30%
Travel Inventory
Management – Regional Staff/National Special Projects Specialist 7/21/2002
- 8/16/2004 - Act as
Technical Lead for Fiber-To-The-Premise (FTTP) Capacity Management
Tracking/Inventory -
Coordinate Regional and National Cross-Functional Teams (Outside
Plant Engineering; Central Office Engineering; Switch Planning/Engineering) - Perform
Capacity Management/Analysis on Voice, Data, and Video Network Elements - Travel
Extensively Throughout the Northeast and Mid-Atlantic States for Field
Recovery of Switching Equipment -
Quantify Material Recovery Costs and Post Inventory of Recovered Material to
Corporate Records ($35.8M) - Vendor
Management of Domestic and International Teams for Inventory Systems Database
Conversions - Manage
Warehouse/Stockroom Inventory; Track Shipping; Coordinate On-site Delivery -
Mentor/Develop Colleagues and Supporting Staff; Building Safety Manager - 40%
Travel Network
Engineering Sr.
Network/Field Engineer - Central Office Equipment 9/1997 -
7/21/2002 -
Prepare/Design Equipment Work Orders for all Metro Boston Central Offices and
surrounding CLEC Hotels, Collocation Arrangements, and IXC Carrier POP Sites. -
Hands-On Design and Practical Application/Installation of CO Equipment (bays,
chassis, circuit packs, etc.): Class 5
TDM Switches (Lucent; Nortel; etc.) and Soft-Switch/VOIP (Cisco; Juniper;
etc) Video
Equipment and Transport Digital
Cross-Connect (ATT/Lucent; Alcatel/Tellabs; etc.) and PLC/Switching Platforms
(Siemens; etc.) Local/IOF
Transport Equipment (Async; Sonet; DWDM) Frame
(DS0) and Relay Rack/Fiber Bay Terminations for Copper/Fiber (DS1; DS3; OCn) Central
Office AC/DC Power Plants (Switchboards; BDFB’s; batteries; rectifiers, etc.) Central
Office Space Allocation; Building Environmentals (HVAC); Timing/Alarms; and
Test Equipment Provide
In-Service Test and Turn-up; Network Monitoring and Surveillance, SCADA - Prepare
Method of Procedure (MOP), and Scope of Work (SOW) Documents - Perform
Budget Preparation/Project Costs; Tracking/Analysis; and Reconciliation -
Install, Maintain, and Repair both Copper and Fiber fed DLC/SLC/PLC
Electronics (On-Site Field Work) - Adhere
to equipment lock out; isolation tag; maintenance windows; and safe time
procedures - Create
Material Orders; Track Shipping; Manage Warehouse/Stockroom Inventory;
Coordinate On-site Delivery - Read
Blueprints and Construction/Equipment Drawings -
Mentor/Develop Supporting Staff; Safety Floor Warden - 15%
Travel Outside
Plant Engineering/Planning Engineer
- Loop Technology Planner 5/1995 -
9/1997 - Perform
Short Term Analysis and Long Range Studies (Corporate and Client) -
Forecast Construction Materials for Strategic Growth and Cost Reduction
Undertakings - Prepare
Capital Investment and Cost Reduction Initiatives for Multiple Wire Centers - Manage
Capital Investment/Cost Reduction Budgets ($10M - $15M per Wire Center) - Read
Blueprints and Construction/Equipment Drawings -
Mentor/Develop Supporting Staff; Safety Floor Warden Outside
Plant Engineering/Design Field
Engineer - Outside Plant Design (Specific Projects) 3/1989 -
5/1995 -
Hands-On Design/Build of OSP Infrastructure for assigned Wire Centers in
Metro Boston area - Pole Line and UG Conduit - Copper Feeder/Distribution Cable Placements - Design, Install, and Repair both Copper and
Fiber fed DLC/SLC/PLC Electronics (On-Site Field Work) -
Negotiate Right-of-Way (ROW) Agreements, License Agreements, and Land
Purchases - Prepare
Detailed Work Orders - Pricing
for Local Exchange and Interoffice (IOF) Projects -
Prepare/Administer Construction Bids -
Manage/Supervise Engineering and Construction Vendors -
Analyze, Track, and Reconcile Wire Center Budgets ($10M - $15M per Wire
Center) - Create
Material Orders; Track Shipping and Warehousing; Coordinate On-Site Delivery - Read
Blueprints and Construction/Equipment Drawings -
Mentor/Develop Supporting Staff; Safety Floor Warden - 15%
Travel Network
Operations – Central Office Central
Office Technician 6/1987 -
3/1989 -
Installed, tested, and maintained simple and complex voice and data circuits
on local and interoffice (IOF) switching/transport equipment - Troubleshoot and restore mission critical DLC, SLC and PLC systems
from service outages - Respond to afterhours callouts - Strict adherence to equipment lock out;
isolation tag; maintenance windows; and safe time procedures - Install/replace electronics chassis, power
boards, and circuit packs for new service, planned maintenance and service
outage repairs. - Document all associated work via appropriate reporting systems and
logs Customer
Operations Station
Assigner – MLAC 1/1986 -
6/1987 - Assign
switch and cable facilities for simple and complex voice and data service
orders. Customer
Operations - Installation/Maintenance Field
Service Technician 2/1982 -
1/1986 - Perform
adds, moves, and changes to simple voice (POTS), and complex voice /data
circuits for residential and business customers using copper and
fiber/electronics transport. - Troubleshoot and restore mission critical DLC, SLC and PLC systems
from service outages - Respond to afterhours callouts - Strict adherence to equipment lock out; isolation tag; maintenance
windows; and safe time procedures - Install/replace electronics chassis, power
boards, and circuit packs for new service, planned maintenance and service
outage repairs. - Document all associated work via appropriate reporting systems and
logs - Work frequently performed outside in adverse conditions - Customer facing position requiring good communications and
professionalism Opryland,
USA – Nashville, TN Theatrical
Stage Technician/Electrician (Unlicensed)
Lighting,
Sound, Scenery, and Rigging 1/1980 –
2/1982 -
Provided technical support for multiple stage shows both inside and outside
the theme park. -
Traveled as needed to support lighting and sound requirements for road shows. - Fork
Lift Qualified Verizon
Communications, Inc – Boston, MA Customer
Operations - Traffic Department Long
Distance Operator / Directory Assistance 6/1974 -
12/1979 - Dial
“O” Operator and 411 Directory Assistance Operator assisting customers with
local and long distance calling. (Part Time – High School and College) EDUCATION: School:
Bridgewater State College (now Bridgewater State University) Degree:
BA - Communication Arts & Sciences - Class of 1979 OTHER
EDUCATION/CERTIFICATION: NYNEX –
Certified Trainer / Instructor, Frame Relay, 1997 TECHNICAL
/ SOFTWARE SKILLS: -
Proficient in the Microsoft Office suite (Excel, Word, PowerPoint, etc.). SIGNIFICANT
ACCOMPLISHMENTS: ***
Deployed to NYC as part of the 9/11 World Trade Center Disaster Assessment
and Restoration Team from 09/16/01 - 10/20/01. Assigned to the 104 Broad St
(Wall Street) Central Office, working round the clock shifts to manually
rebuild/reroute over 1 million circuits for the New York Stock Exchange
(NYSE) and the Financial District. Troubleshoot, repair, and restore
mission critical local and long haul electronics systems to in-service status
under extremely adverse conditions. ***National
single point of contact (SPOC) to coordinate CO Design Engineering, OSP Field
Engineering, Switch Planning, and TIRKS E1 personnel with the identification,
analysis, recovery and inventory of Digital Trunk Interface (DTI) Switch
Ports in Lucent 5ESS and Nortel DMS switches within the former Bell Atlantic
(fBA) footprint (Maine to Virginia). Completion of this initiative in
December 2004 resulted in the recovery and savings of $35.8M of
previously stranded investment. CIVIC
ACTIVITIES: Whitman
Youth Basketball - Coach (Boys Age 12-14); 2001-2004 and Referee (Girls
10-12); 2005-2007 Whitman
Youth Baseball/Softball - Coach (Girls Age 10-12) 2002-2004 Past
President/Moderator - First Baptist Church, Abington, MA; 2002-2006, 2008,
2010 Choir
Director - First Baptist Church, Abington, MA; 2008 - 2015 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|