From: route@monster.com
Sent: Friday, September 11, 2015 7:46 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Maria Elena Bell Bi-Lingual Spanish Maria.bell49@Yahoo.com Tel: 813-523-0541 Verizon – (recruited through Woltcom October 1, 2013 –
current
Engineering –
Coordinator/Specialist Responsible for work order administration
activities within the Central Office/ Outside Plant support centers,
including work order scheduling, material procurement process, staging and
milestone date administration. Ensure work orders are built within the
milestone dates provided by Engineering or the target dates provided by
Integration. Responsible to order, receive and transfer all major material
and components and to ensure Circuits are turned up on the Due Date.
Milestone dates, disbursements, targets and communication with all business
partners. Review work order for milestone dates, permits, materials,
determine appropriate Client and assign LOA in RAM, send notifications &
work order to Construction. Update Master spread sheet with all information
including ECD for each phase of path, placing and splicing of Fiber, ensure
material received at the appropriate milestone dates. Monitor & update
milestone dates in CCP/RAMS Work Order Progression, weekly conference
calls/meetings on OSP construction, COEI and Vendors teams progress.
Daily Escalations on Circuits turn up. Follow up with Engineering and
Construction, COEI on any issues, closing Work Orders, Redlines sent to
drafting to correct major changes in ICGS, Correct vBuild IPID errors and
reconcile material, Work order final posted and closed with AWC populated in
CCP, System required CCP, v-Build, ICGS, M-solv, AAIS-DS. Citi Corp (recruited through Axelon Services Corp. NEW YORK)
- July 8, 2013 to
Sept 27, 2013
UAT- Software Tester Specialist
Responsibilities include UAT Design,
planning and execution, raising Defects related to bugs found during testing
effort, both Manual and Automation, Escalations, retesting Defects for
fail/pass reporting, using Quality Center reporting tool, interaction with
multi-cultural teams and different levels of management. Familiar with AML
tools (e.g., Mantas) and/or Quick screens, daily use of Actimize, COBIS, CORE,
Citi screening to complete responsibilities. Tesinc – April 9, 2012 to July 5, 2013
(Directly with TESINC-
TAMPA) Responsible for the provisioning of
Engineering Work Orders (EWO) preparations of cut sheets and scheduled the
cuts to move customers from (old DSLAM) to DSL
broadband (new DSLAM) also responsible for database clean up (removing old
cable pairs & terminals) once customers are thrown to the new DSLAM,
closing out EWO(s) and followed up of any addition changes related to the
cuts, involved with PSR, ISR, Circuit Design etc. Interaction with Windstream Facility Provisioning (FP) Assignment,
Billing Center, Field and Central Office techs using M6, DRS and MIROR Systems to complete responsibilities. Citi Corp (recruited through Axelon Services Corp. NEW YORK) - June 2011
to August 2011
UAT- Analyst Specialist Provide support to the Anti-Money
Laundering Operations UAT (user acceptance test) Team, to include: UAT
planning, scheduling and preparation of the UAT’s within the system for
Quality Center, Define test conditions, prioritize multiple tests/tasks,
interface with Technology, Compliance partners, UAT Testers and PM’s
from different organizations, updating SharePoint, daily interaction
with multi-cultural teams and different levels of management. Familiar
with AML tools (e.g., Mantas) and/or Quickscreens case management tool. Tesinc - April 2011 to June 2011 (Directly
with TESINC-
TAMPA) Data Analyst AAIS conversion to TIRKS, In depth
research/corrections of AAIS-DS (Dbase) records, also manipulating EXCEL
using the most sophisticated commands such as Vlook-up, Pivot tables etc. for
accurate reporting, involved with county/city permits, and the following
platforms ICGS, IDDS to complete responsibilities. Verizon (recruited through Ajilon Consulting- TAMPA) - Oct 2008
to March 2011
Software Tester I Understanding the provisioning of VOIP
(voice over internet protocol) and SBC (Session Border Controller). Analyze
and decompose business requirements to extract test requirements, managed the
creation of Test Plans, execution/modifications of Test Cases, document
detailed steps to be tested and the expected results for multiple Projects
for the EMEA, APAC and US regions, testing PBX, KEY and HIPC services,
raising IR/Defects related to bugs found during testing effort, both Manual
and Automation, retesting IR/defects for fail/pass reporting, using the
IR/Defect tracker of iPM (Internet Project Management) and ) QC (Quality
Center) System test applications ESAP (Enterprise Softswitch
Activation Platform) and NGPS (Next Generation Provisioning Sys)
performed regression to ensure functionality continues to work as expected
after codes drops as well as production testing on a regular basis,
reading/analyzing XML to understand order flow as well as a complete
understanding of Systems Development Life-Cycle (SDLC) provide and implement
recommendations to the requirements team to clearly determine the specific
elements to be tested, conference calls, WebEx presentations/training,
interact with other testers and developers on a daily basis as well as
providing technical support to other applications via chats, such as PC,
CSSOP, ICP, BS, IASA, IBM/VM, etc. Daily interaction with multi-cultural, on
and offshore teams. Create/update spreadsheets to improve workflow and to
report project (s) statuses. Ability to multi-task effectively. Verizon (recruited through PDS Technical) - October 2006
to Sept 2008
Software Tester Engineer II (TAMPA) As an End-to-End system tester to include
Voice/Data/Video for FiOS/FTTP products, Set Top Boxes, DSL,
Fiber-Optic, Routers, Switches etc. reading and analyzing business
requirements (BRDs), creation of Test Plans and execution of Test Cases both
Manual and Automation, applied a structured approach (methodology) to project
planning, estimating, monitoring and reporting through the full project
lifecycle, from initiation through closure. Raising IRs (Incident Records)
and documenting results via the testing tracking tool, performing daily
Health Checks to ensure systems availability, using the following systems to
complete responsibilities: COFEE West, COFEE East, iVAPP, NOCV, SSP, vMobile,
Workbench, CMIS, WFA-C, WFA-DO, AAIS, BAAIS, NTAS, NCOG Log viewer, in
addition Conference Calls, Live Meeting and Sametime chats in a very fast
paced environment. Efficient in MS Office. GTE/Verizon 1986 -2005
Analyst
8/2002 to 12/2005 - Escalations on
due date installs for Hi-Caps, DS0, T1’s and T3’s special services circuits
and maintained an exceptional communication with various departments and
levels to ensure work orders, DORs and Permits are on schedule, in addition
worked with CO (Central Office) Wire Center, National Provisioning Center, Order
Center, Dispatch, Outside Plant Engineering, Construction, COEI (Central
Office Equipment Installation), Planning. Escalate and coordinate on past due
disconnects for Southeast areas to free-up facilities to meet customers
commitment due date; daily conference calls for resolution on customer
complaints on past due dates. Helpline Technical Support, assist and modify
circuit design; provide technical assistance to the Field and Central Office
technicians, processing an average of 140 tickets per month, cross-connect
and condition coding as well as mapping/un-mapping, identifying bridge tap,
for DS0, DS1, DS3, SONET, SS7 and Message Trunks circuits for Southeast and
Texas areas for Residential and Business; apply advance knowledge and
research on ISDN, Frame Relay, ATM, PRI, BRI, Flexgrow and Fractional T-1
services as well as the equipment supporting such services. Use AAIS
–DS and NOCV on a daily basis. 4/2001 to 7/2002 - Responsible for
resolving Meetpoint issues through advanced knowledge and research for
Local Exchange Carriers (LECs) such as Bell Atlantic and BellSouth, improving
the provisioning time resulting in on time service delivery. Manage and
maintain effective communication with Central Office and Field technicians
and with upper level management staff within Bell Atlantic, BellSouth and
Ordering Center for resolution. Ensure data integrity and accuracy of records
through research and/or rearrange/change/remove of circuits when necessary,
research disconnect Bell orders that are not yet disconnected from the
Verizon Database to prevent future busy meet points. Performed Root Cause Analysis for the CLR
Report. (Circuit Layout Record) managed multiple tasks such as Due Date, CLR
and no Bell meet point escalations; conference calls; and take necessary
action for resolution to meet customer commitment dates. Served as focal
point in communicating updates and changes for all escalations for the
Center. Coordinate and complete special projects. Assist staff and team
members in moving projects forward such as RDM (payroll system), verifying
billing via EXACT and NOCV, etc. Acting supervisor for the South Designers
and Admin reps. 8/1999 to 4/2001 - Responsible for
the Root Cause Analysis of Miss Due Dates of all DS0, T1’s and DS3’s SS7
circuits for both Wholesale and Retail, for South, Florida and Virginia
regions. Related all circuits misses information to appropriate regions via
conference call for corrected action to improve the center’s objective and
customer commitment due date . Using various systems OSSAMS, TBS, NOCV,
SOP, EXACT, Client Server, TIRKS and MS Office to complete analysis. Executive Assistant 08/08/1999 Provided executive-level assistant to
the Region manager and his direct reports, 150 employees, processed Payroll;
Employee Expense Statement; Travel arrangements, Vouchers, maintained
confidential employee files, meetings, managed his calendar, multi-invoice
payments, organization charts, Initiate Purchase Orders, Office Supplies.
Excellent Microsoft Office skills such as Word, Excel, Access, PowerPoint,
and Org Plus, practiced problem-solving and serve as the subject matter
expert (SME) for RDM (payroll system);balanced the General Ledger, develop
and maintained various spreadsheets/analysis/ graphs of various data, etc.
for electronically distribution to upper level management. Document Control Assistant 06/30/1998 Performed the Document Control function as
part of the ISO 9000 certified quality management system for the BRPC
(Business Response Provisioning Center) in addition control all Document
Change Request (DCR) related to the ISO 9000 documents manuals to kept the
certification current for the entire BRPC as well as for the BDCC; this
position required data merge, analyzing, sorting and the use of various types
of formulas including creation of macros. Leadership/accomplishments ● Team leader for the Completion Team to
ensure the proper “why miss code” was applied when completing orders to
reduce repetitious work and overall meet customer’s expectations, frequently
performed as acting Senior Advocate. ● Team member for the implementation of
RDM/payroll transmittal to Illinois. ● Team leader while on loan to BCF
(Business Customer Features) training small Business Customers on CentraNet
and class features, using DMS100, GTD5 and 5ESS switches to complete
responsibilities, frequently performed as acting supervisor. ● Built macros/formulas to spreadsheet to
minimize the time used in preparing weekly analysis Civic Activities and Professional
Memberships State of Florida Notary Public; Volunteer
to the American Heart Association; United Way; active member of Palma
Ceia United Methodist Church; member of HSO (Hispanic Support Organization) Technical Skills
AAIS-DS (Assignment Activation &
Inventory System – Design Services), EXACT (Exchange Access Control
and Tracking), NOCV (National Order Collection Vehicle), WFA-C,
WFA-DO, TAS (Trouble Administrative System), OSSAMS
(Official Special Service Automated Measurement System), SOP (Service
Order Process), TIRKS (Trunks Integrated Records Keeping System) MS
Office Word, Excel, Access and PowerPoint, Orgplus, COFEE
–East/West, ESAP (Enterprise Service Activation Platform) QC
(Quality Center), iPM (Internet Project Management) CMIS, BOTT,
knowledge of ICGS (interactive Computer Graphics Sys), NGPS
(Next Generation Provisioning Sys), iVAPP, Microstation and GTEAMS,
web pages for Common Language, NERD, NEDASS, SWIFT,
Helpline Design, CLR Assistance Team, CLR Reporting Tool, OREO,
etc. Awards 1990 - Accounting Operation Employee of the
Month Education
High School /GED 1.5 years of accounting SQL certification 1 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Spanish |
Fluent |
|
|
|