From: route@monster.com
Sent: Friday, September 11, 2015 7:46 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Craig D. Laver 535 Bonnie Dr Lakeland, Fl. 33803 (863) 225-7144 Email:cdlaver@yahoo.com EDUCATIONPolk Community College-Associates Degree
Communications Lakeland Christian High
School-Diploma WORK
Lamberts Cable Splicing
February 2015 to June 2015
Supervisor
Manage construction work orders for Verizon. Responsible for billing,
as-builts,
and close outs. Perform safety Inspections and Q/C of in-house and contract
crews. EXPERIENCE
MasTec
January 2014 to February 2015
Supervisor
Manage work orders for CenturyLink construction and splicing. Work directly
with CenturyLink to provide progress of work and to insure meeting
of
projected completion dates. Inspect construction crews for quality of work
and
safe work practices. Responsible for billing, as-builts, and close outs of
completed work. Address and resolve customer complaints.
S/N Communications
January 2012 to December
2014 QC
Inspector
Inspect work orders for compliance to Century Link specifications. Verify
contractor billing information. Investigate damage reports. Resolve customer
complaints. Train and assist contract crews as needed. MasTec North America, Inc.
August 2010 to December 2011
May 2009 to April 2010
January 2008-December 2008 Field
Engineer / Design Performed site walks and created construction
proposals packages upgrading AT&T Mobility’s cellular network. Completed
and submitted construction proposal packages in an acceptable and profitable
time frame with minimal need for revisions. Assisted in creation of construction
proposal template; currently used as the standard for
MasTec.
Project Manager/Supervisor
Responsibilities included coordinating with Fort Stewart Military personnel
in construction of fiber optic and copper communication network, production
reporting and splicing during hot windows. Project completed under budget and
within profit expectations, which included travel out of state to meet
deadlines.
Supervision of Verizon's Florida FTTP/FIOS project responsibilities included
development and management of locate process, routing of all locate
personnel, work order scheduling, participation in production report meetings
with Verizon and construction meetings with municipalities and utilities.
Supervision and inspection of buried path creation, installation, billing and
walk out. Worked directly with Senior Area Manager to
establish new contract territory with Century Link in Hinesville, Ga.
Responsibilities included assisting in hiring and training of new local personnel,
establishing vendor accounts, creating warehousing and inventory guidelines,
work order pre-fielding, inspection and billing per Century Link standards.
•
Meet with engineers of various phone companies to help determine what the
specific needs are to upgrade AT&T Mobility's cellular network (i.e.: 3G
to 4G). Management of project in Davie, Fl preparing MasTec
owned property for new tenant lease. Responsibilities included inventory and
storage of personnel records, office equipment and construction materials.
Property upgrades as required per local statutes. Worked directly with new
tenants to accommodate requirements. All work completed within timeframe and
under budget allowances. Assisted in creation of MasTec work policies and
training, complaint resolution and supervision of construction crews. Foreman responsibilities include traffic light
upgrades, installation of illuminated street signs overhead and cabinet
wiring. Responsible for proper M.O.T. set-up during all intersection work.
Reclaim water project and Verizon roadwork inspection. Verizon
December1980-December 2007 Customer
Zone Tech II Tasks included outside plant repairman, cable
splicer, I&R Tech, lineman, fiber splicer. Skilled in large work order
splicing, aerial construction, buried construction, troubleshooting of all
cable problems, and premise installation. Supervisor/Inspector
Responsibilities included supervision over large utility construction
projects, working directly with contractors during road moves, and utility
builds to ensure protection of Verizon facilities. Inspection of work
performed ensuring integrity of existing Verizon facilities and completion of
work to standard practices Air Pressure Maintenance
Responsibilities included maintenance for all pressurized cable within a
designated territory, review of daily cable pressure data, and reducing
maintenance cost though improvement of cable pressurized systems. GTE
July 1980-December 1981 Traffic
Operator. •
Duties included long distance operator and repair answer center operator.
RELATED SKILLS • Proficient in PMAP, CHATLOS, Field view, AWAS,
Windows • Working knowledge in AAIS, TAS,
Microsoft Word and Excel, Lotus Notes • Coordinate work order with
engineers and permit processes • Work with projects between
contractors and other Utility companies CERTIFICATIONS • NUCA Confined Space Entry • MOT/Florida D.O.T., NUCA
Excavation Safety & Competent Person
• AT&T LOS Training: Ask Yourself, Supplier Awareness, and TP training • Basic RFR safety training References available upon request. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|