From: route@monster.com
Sent: Friday, September 11, 2015 7:46 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
JOHN K.BIDDLE 3260 Pelham Road #130 Greenville South Carolina 29615 760-473-5202 SKYPE: jkbiddle Jkbiddle2000@yahoo.com SUMMARY A goal oriented, dedicated engineering
professional with over 25 years of hands-on field experience in Outside
Plant/Inside Plant/ Cellular construction and project management. Principle strengths are meeting budget and
time-line constraints, providing accurate cost estimations and providing
sound leadership to turnkey operations. Exceptional problem solving and
communications skills with expertise that includes CDMA, UMTS PCS, TDMA,
Wi-Fi, E-911,ODAS,IDAS, LMU’s, RRU, RRH’s standards. Analog Digital Technical
Design, BSO, MSO, CO’s BTS/Design/Build outs, and Decom of old equipment. Managed Site Acquisitions in addition to
Documentations of Right- of – Way, Quality Assurance, Tech Support, RF, Fiber
Optics and Copper design, turnkey build outs, along with International/Domestic
Electrical and building codes Right-of way, AT&T Generator installations PROFFESSIONAL
ACCOMPLISHMENT Zayo
Construction Manager Minneapolis/ Saint Paul
MN.
September 2014 to present Design DFTT
Dark Fiber to the tower for Verizon and T-Mobile. Design the actual back bone
core and rings that included are lateral routes to provide service to our
client cell sites. Handled the permitting and QA/QC for the fiber
installation. Perform the cost aliases per site, for each small cell site
project. Managed daily field issue that came up on a daily bases. Managed
daily conference calls with are General Contractors and updated tracker
daily, perform and approved close out packages AT&T
CONSTRUCTION MANAGER BW/WA, SABER/MUTI OCTOBER
2013-September 2014 Managed the
Generator install for the Baltimore/ Washington market for 200 cell site
build out. Dealing With A&E
and Site Acquisition, on a daily bases designing sites for land Lord
Approval; approving location Generator size while tracking their performance.
Assistance with zoning and permitting issue at city and state level. Surveyed
DAS sites for generator requirements. Installing and
Decom a 495 foot sabre guyed tower for Tyndall AFB. Relocating and adding a
total of 31 lines and 30 antennas while the flying squadron were still able
to fly without interruption in flight. AT&T CONSTRUCTION MANAGER WEST
VIRIGNA
FEBRUARY 2013- OCTOBER 2013 Responsible for LTE new Build out for the WVA,
KY, OH market for 250 cell sites turn up. Managed the day to day
constructions activities for the LTE build out. Managed the Turf vendor QA/QC
issues on a daily bases, along with field changes that were required for
approval. Assisted in the design and rollout of iDAS/oDAS along with DE
coming old Nokia and Ericsson equipment for either salvage or relocating for
another project. GCI/EXXON DESIGN ENGINEERING ANCHORAGE
ALASKA NOVEMBER 2012-FEBURAY 2013 Designing of Fiber Optic for the Exxon project
located on the North Slope. Design and build 30 p modules buildings, which
supports housing for the assigned personal and office work space and the main
communication center, for the Exxon project for the North Slope oil fields.
Detailing a LAN/WAN, CCTV, P. A. SYSTEMS and Fiber Optic Back bone and a
local POTs system to be installed in all of the Mods. ALCATEL-LUCENT/ PROJECT MANAGER; CHARLOTTE
NC. NOVERMBER 2011-NOVERMBER 2012 Backhaul Project Manager, Responsible for design and approval of the
installations of 450 Sprint cell site for the last mile back haul turn-up.
Managed 5 Fiber Venders along with 5 A&E firms to support the AAV
install. Approved the BOM and scoping from field manager prior to constructions. ALCATEL-LUCENT/CELLULAR SOUTH;
ALABAMA/MISSIPPISSI MARKET JULY 2011-OCT 2011 SR. CONSTRUCTION MANAGER. Perform site surveys for the LTE build out for
429 cell site in the Alabama market. Worked with Cellular South A&E firm
on the site design, for power and the equipment upgrade. Drafted the BOM while on site, scoped and ordered
required materials for the LTE roll out. The Lucent equipment was being used in the
Alabama market. Nokia equipment was being used in are sister build in
Mississippi market. At the times I was required to manage either
market on Approved for all field design and BOM’s to be ordered prior to
construction. Approved any and all field design changes that were required.
Field design and ordered the RRU, RRH and the LMU to be installed at each
cell site. Directed the removal of existing equipment and or the new
installation of the equipment to be installed depending on the site
requirements. Held weekly meeting with client and internal team. Handled Land
lord issue between clients to resolved issue in a timely with a professional
manner. Approved all Decomm of old vendor equipment for being either scrapped
or relocated to another project. HARRIS-CITY OF DADE COUNTY MIAMI FLORIDA DECEMBER
2010-JULY 2011 PROJECT MANAGER. In charge of the rehoming of the Police/Fire
department communication towers and equipment upgrade. Swapping out the
existing Nortel equipment with new upgraded Harris equipment, Re-banning as
we went. Responsible for the selection of all general contractors, approving
of the finale A&E drawings. Prepared and submitted the BOM for ordering
and warehousing of all the equipment. Submitted the finale A&E drawing
for permitting and approval from the city. Holding weekly meet with the
client and user for their weekly updates. Performed bid walks and awarded the
contract to are general contractor, approved all changed orders in the field.
Dealt with Building and Land lord issue on a daily bases. Dealt with local
and state building codes and regulations. CLEARWIRE/SMARTLINK; ROCHELL PARK NJ.AUGUST
2011-DECEMBER 2010 CONSTRUCTION MANAGER. Performed the pathing Quality control for the New
York, Long island 1800 cell site build out. Managed the day-today pathing
crews, which included the installation of the Dragon-wave and Bridge wave 1-2
foot dishes. Performed Quality assurance on the installations
of the dishes, while handling access issue with land lords on a daily bases a
long with problems that may have occurred, resolving them quickly as
possible, prior to the 4 G installations with the MSO upgrade build out going
on at the same time. DASNET/ROHN TOWER; KANADHA AFGHANISTAN-ROHN
TOWERS –RYIHA SAUDI ARAABAI DECEMBER 2009-NOVEMBER 2010 PROJECT MANAGER While in Afghanistan, I design and over seen the
installation of the Outside Plant, for one of NATO bases. Utilizing local
work force, I was assigned to oversee the construction of housing that would
house the upcoming troop assignments for their living and working quarters. While assigned to ROHN SAUDI INTERNATIONAL. I was
directing the build out of 184 cell site for the Terraria antenna systems for
the SAUDI Government. In detail there were 135 raw land builds, 49 modes,
along 184 shelter that were built in country which I performed Quality
control to ROHN standards. All 184 site required power and Telecom upgrade
all site required either a New Generator fuel cells install or we installed
29 site that require Solo Panel in the Sahara Desert along with a MSO that
needed to be design and built. T-MOBILE/SMARTLINK GREENVILLE
SC.
DECEMBER 2008-DECEMBER 2009 CONSTRUCTION MANAGER. Managed a 250 plus UMTS site overlay. Performed
scoping, material ordering and managing material control. Dealing with day
today construction issues and approving all field changes long with the
A&E drawings. Performed Bid walks and award the contact to the
General contractor. Assuring the RRU, RRH and LMU were either installed or
harvest to company specifications. Assuring all red lines and close out
package were performed correctly and on time to be client. Holding meeting
with are general contractors on a daily assignment and any issue that may
arise hold safety meeting daily. Meeting with are client and end user on a
Bi-weekly appointment. Assisted COX communications with the fiber design to
the cell sites for turn up. Set up the schedule for the Ericsson and the
Nokia equipment for commissioning and testing. Managed the removal and
relocating or disposal of their outdated Ericsson and Nokia equipment. T-MOBILE/NORTH STAR & AFL; JESSUP MARYLAND
JUNE 2008-DECEMBER 2008 CONSTRUCTION MANAGER. Performed the Quality Control of 220 UMTS site
build. Directed the closed out procedures for prompted delivery to are client
in the TRI-states area, assured that RRU RRH LMU, and the E-911 was installed
or relocated to the proper sites. Dealt with the local LEC to provide Fiber
to the cell sites for new T-1 ordering a long with assuring power was either
ordered or upgraded as required. AT&T/NSORO ORLANDO FLORIDA GREENVILE
NC. OCTOBER2007-JUNE 2008 Managed the AT&T UMTS New site build out in
Florida and the Caroline’s market, this consist of 350 cell site all
site included the managing of A&E, site Acquisitions, selections of
general contractor, the ordering of power and T-1’s and installations of all
of the utilities. Performing bid walks on all of the site including scoping
and BOM ordering. Perform the power upgrades where required. Material
handling and warehousing of the equipment to be installed, and scheduling the
commissioning of the equipment. Approved the closeout packaging for
submitting to the client equipment manufacture were Nokia, Ericsson, true
positions. Held Bi-weekly meeting with client, dealt with construction issue
pertaining to clients and customers’ needs managed the Decom of the Nokia
equipment to be relocated to another market. SPRINT/NEXTEL ATLANTA GEORGIANOVERMBER
2006-OCTOBER 2007 CONSTRUCTION PROJECT MANAGER Responsible for the management of new
construction and CO-locates for the installation of iDEN and CDMA a long with
UMTS for 600 cell sites build in the Atlanta market. Responsible for the
approval of site design and Quality of the build and general contractor
selections. Perform bid walks and awarded contract to general contractors
that I have selected. QA/QC finale approval for site completions .Trained
internal personal on wireless constructions standards. Approved closeout
package from general contractor. Held bi-weekly construction meeting with are
general contractors and client for are tracking updates. Submitted and track
the progress of the power, Telco and permitting for are sites, schedule the
removal and shipment of Decom equipment when required to. AT&T/ ERICSSON/ CH2MHILL/ Central CaliforniaJANUARY
2005-NOVERMBER 2006 CONSTRUCTION MANAGER. Managed the UMTS upgrade of over 600 cell sites,
re-design cell sites to accommodate new lines and antennas, along with the
new installations of the UMTS power drops and battery and rectifier upgrades
to support the Ericsson equipment installations. A long with ordering new T-1
and power service for site that require either an upgrade or new services.
Conducted QA/QC for the new installations, approved all sweep test and cable
replacement when required.approved close out packages to be submitted to the
client, assured all new technology was installed correctly, UMTS, RRU, RRH
Electrical down tilts, LMU E-911. Held Bi-weekly meeting with clients and end
user. Took care Land Lord issue when they arise settled and corrected
problems they may have. Submitted and tracked the progress of the electrical
and building permits. Managed the Decom and relocating of assigned equipment
to different markets AT&T/GENERAL DYNAMICS CENTERAL CALIFORINADECEMBER
2004 DECEMBER 2005 CONSTRUCTION MANAGER. Managed the quality assurance for the
installations of the NEW Ericsson UMTS equipment for Cingular merging with
AT&T Nokia equipment in the Bay area, over 600 sites were affected by the
merger/upgrade. I approved everything from new design to site
acceptance to the completed turn over packages. Guided construction
supervisor and general contractors and subs on the recommended proper
correction actions to be taken for a proper installations of equipment in a
timely manner. I was the middle person for client/end user to field personal
and Land lord, for any issues that need to be solved prior to constructions
or during constructions. AT&T/HENKELS & McCoy MENTECA
CALFORINA
JANURAY 2004-DECEMBER 2004 PROJECT MANAGER Managed 100 cell site upgrade for E-911 equipment
installations to commissioning. Performed internal QA/QC close out and
acceptance. Performed a complete turnkey design and
installations of 18 raw land Microwave build out for the State of Nevada from
setting the shelter to tower and Microwave dish. All shelter required to have
a complete equipment package to be install with cable ladder, battery banks
with batteries FIF racks to equipment bays to assembling on site prior to the
tower and microwave dishes being installed, coordinate with state reps on
design, permitting delivery and turn up to close out, dealt with the state
Rep on all change orders that were required for approval. FORT McCoy –VERIDIAN- SPARTA WISSCONSSAN 2002-2004 SENIOR INFORMATION TECHNOLGIST Managed the Quality assurance for the
I3PM/LAN/WAN/QUTEN project for the US ARMY. Overseen 110 miles of outside
plant conduit and of which 148 KLM of fiber cable ranging from 6 strand to
288 strand [single and multimode fiber]. Installed 3 New POPs a long with 38
miles cooper cable ranging from 25 pair, to 1800 pair cable in turn we
installed 124 manholes and 4 Hand holes, extended the existing MDF with
11 new vertical main frames which serviced the 110 building, that included
150 communication rooms that house the CISCO 4500-6500 router. The 11 NEW vertical main frame we were able to in
large the cable plant by 5,000 new copper cable pairs. I had to redesign
Verizon as-built due to they left off more than half of the building entry or
in-proper running of interior conduit to Army/Government standards, beside the
interior redesign I had add road crossing with proper steel sleeves and
concrete cap to protect the fiber Optics cable form Tank crossing. Cost of this project was over 11 million dollars
.Held Bi-weekly meeting with senior Military member and high ranking DOD
employees on progress or installation an change that were required. ASTAC/ BARROW ALASKA2000-2002 OUTSIDE PLANT MANAGER Managed the day to day Inside/outside plant
actives in a rural telephone plant in Alaska. Basically keep a rural
telephone company a float with install and repairs to the switch and outside
plant. ASTAC took this plant over from GTE, I spent over a years’ time
in the Outside Plant upgrade to current standards and rebuilding the existing
cable plant to code, when I first arrived their back log in installs were
over 200 behind, trouble ticket were about the same in back logged installs.
It took over 5 months to get the numbers down to single numbers on both
troubles and installs. We maintained and install everything from POTS to T-1s
to DS0- DS3 56k circuits to the microwave tower. Weather is main challenged
beside location, ordering and receiving materials is a challagened, we all so
support the out laying villages and the slope for telephone service. METRICOM-GENERAL DYNAMICS ATALANT GA1999-2000 CONSTRUCTION MANAGER Managed the day to day new construction for
Metricom ISM build out. [Fore father for DAS] managed the day to day
construction active for 289 NEW cell sites in the Atlanta area along with
additional 278 cell site in the Washington DC area. Hired all General Dynamic
construction supervisor a long with the selection of all general contractor
for constructions and A&E contractors, tracked the job from cradle to
grave ordered all materials and permits T-1’s and power. Trained in house
personal on construction standards and procedures, approved all construction
changes and drawing prior to build hired my office staff. Approved on
closeout package prior to submitting to are client. Held construction calls
with client and GD, attended site acquisitions site by site meeting. Directed
are PC on updating with accurate data form the field to the tracker and
approved the up loads and change to the master tracker. EDUCATIONS AND TRAINNING Attend College of the Air
Force, Montgomery, AL. Cable Splicing/Fiber Splicing/Construction and
Construction management (Outside Plant QA&QC trained) Mass7/Field
Engineer/Fiber Restoration/Analog/Multiplex/Modem/Switching DS-O through DS-3
to OC-192, ISDN, DSM 10,100,250,500, Cisco routers 4500-6500 series
Installation and Installation Practices turn up and testing/Advanced Test
Equipment for copper, fiber, cellular installations, cellular equipment and
companies. Qualcomm, Nextel, Ericsson, Nokia, Siemens, Nortel, AT&T,
Sprint, Cricket Leap T-Mobile. Construction Management and Personnel
Management/Supervisory Training. ISO. 9001 Registered, 10 hour OSHA safety
course, Confined space-training, manhole Rescue. Microsoft Project, Point,
Excel, and Office Suite., Scheduling testing and commission of new equipment.
Sprint LTE installations .FTTP design, ROW/ permitting, DAS installation |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|