|
QUALIFICATIONS
·
Expert in
complete installation of MMBS/BBU cabinets for Sprint to include; RRH
Hybrid cables, all fiber associated with site, CDMA/LTE/LTE 2.5 shelves,
batteries, gas tubing, labeling, cabling associated with cabinets
·
Experienced
in Fiber Optics for SONET, Fiber To The Premises (FTTP)
·
Worked on
OC-192 and smaller links. Worked on Lucent OLT, ONT, Big Band, BPON, GPON,
Alcatel OLTs, Cienna 1600 & 2500, Harmonic EDFAs, Flashwave 4500. Test
and turn-up of OLT, Scientific Atlanta, Big Band, Harmonics EDFAs
·
Analyze
drive test data and antenna sweeps using associated programs
·
Trained on
the CDMA2000 and 1x equipment
·
Drive
testing using Agilent equipment
·
Level one
experience with DMS-250 switch programming
·
Hands on
testing and troubleshooting of DS1 and installation of alarms for AT&T
cellular sites
·
Excellent
organizational skills
·
Hands on
knowledge of the processes for installing DMS-100 equipment from ironwork
to fiber optic
·
Hands on
knowledge of the installation of FLM-150/600/2400, FDS-1, 303, and Netspeed
bays for use in Central Office activities
·
Experience
with Microwave radio systems
·
Familiar
with the use of various types of test equipment to include Fireberd series,
Oscilloscopes, multimeters, and other analog test equipment
·
Experience
with modems, multiplexers and bandwidth managers to include Integrated
Digital Network Exchange (IDNX), Newbridge and Codex
·
Familiar
with the use of government and commercial encryption devices
·
Experienced
with QWEST installation protocols
·
Learn
exceptionally well and very quickly, take pride in my workmanship and will
do the best job possible
·
Willing to
relocate for a challenging and rewarding position.
Computer Programs
·
MS Office,
WordPerfect, MultiMate, Windows 2000, Actix, Agilent, Tera Term
Test equipment
Fiber
test (OTDR), Fireberd series, Protocol analyzers, Spectrum analyzers,
Oscilloscopes, Multimeters, and other analog/digital test equipment
WORK HISTORY
IMP
Engineer
Samsung
6/2013 – 7/2014
·
Expert in
complete installation of MMBS/BBU cabinets for GD/Samsung/Sprint to
include; RRH Hybrid cables, all fiber associated with site, CDMA/LTE/LTE
2.5 shelves, batteries, gas tubing, labeling, power leads for BBUs and
cabling associated with cabinets
Sr. Field Technician
Kineticom
11/2012 – 6/2013
·
Expert in
complete installation of MMBS/BBU cabinets for GD/Samsung/Sprint to
include; RRH Hybrid cables, all fiber associated with site, CDMA/LTE/LTE
shelves, batteries, gas tubing, labeling, power leads for BBUs, cabling
associated with cabinets
Communications
Technician
CenturyLink
9/2010 – 5/2012
·
Worked with
AFC systems, ADTRAN mux/systems, CALIX, DMS-10, Fujitsu
·
Helped
install/repair/diagram T-1/3s, POTS, HSI circuits
·
Align M/W
radios for proper frequency and power levels
·
Assist
Outside Plant personnel with projects
·
Installed
new equipment, removed old/obsolete equipment
·
Preventive
maintenance, Installed fiber circuits
·
Receive/send
repair tickets for equipment/cards, POTS/HSI installs in Central Office
Installer/Field Service
Technician
TEK
Systems
4/2010 - 5/2010
·
Installed
BBLs, Bonded DSL, and DS1 equipment for businesses
·
Wire
wrapped ATI, and Hatteras blocks
·
Repair DS1s
at business locations
Central Office Tech
Verizon Wireline
6/2006 – 9/2009
·
Experienced
in Fiber Optics for SONET, Fiber To The Premises (FTTP)
·
Worked on
OC-192 and smaller links
·
Installed
OLT, ONT, Big Band, Harmonic EDFAs for FTTP/FIOS. Test and turn-up of OLT,
Scientific Atlanta, Big Band, Harmonics EDFAs
·
Guarantee
the integrity of the inside equipment and provides sophisticated testing
procedures for identifying faults in both the inside and outside equipment
·
Troubleshoot
circuits and Central Office equipment using a variety of simple and complex
electronic test equipment (including software trouble shooting and
debugging procedures); perform preventive maintenance test procedures;
interpret diagnostic data or indicators related to the Network elements
(e.g., circuits and/or switches) and locate troubles in all Network
elements (e.g., circuits and/or switches)
·
Install,
maintain, and repair complex electronic switching equipment, such as:
switching circuits and other essential equipment e.g., inspects, cleans,
adjusts, and replaces equipment
·
Wire
connections on electronic frames, distributing frames and terminals
following work orders and specifications
·
Interact
with customers and intra-company departments to get information about
troubles or orders
·
Move and/or
lift weight 60 pounds or more
Field
Technician II
Cricket Communications
7/2001 – 3/2006
·
Analyze
drive test data and antenna sweeps using Agilent and Actix
·
Trained on
the CDMA2000 and 1x equipment
·
Drive
testing using Agilent equipment, Maintain Ericsson equipment, site records
on 23 site locations, Repair sites as needed, perform Preventive
Maintenance when required, Level one experience with CMS 11 Ericsson
switch. Tested Qwest T-1 circuits
·
Experienced
on RBS1127 equipment
Installer/Switch Tech/Lead
Alamon
Telco
5/1998 - 7/2001
·
Level one
experience with Nortel DMS-250 switch programming and database management
·
Supervised
10 2-person teams for installation of alarms into cell sites
·
Tested and
troubleshot DS1 for AT&T cellular sites
·
Installed
customer alarms for AT&T Wireless Service cellular sites
·
Installed
FDS-1, 303, Netspeed telecommunications bays by reading engineering
diagrams, using/creating MOPs, checking inventories of incoming parts and
supplies
·
Worked with
U.S. West and Northern Telecom (NorTel) personnel to correct engineering
problems
·
Installed
DMS-100/200 (NorTel) equipment from start to finish including: ironwork,
placement of bays, running cables for power, ABS and DSX, installed and
wired DSX panels, fiber optic cables, tested DTEs, installed lighting
M/W Systems Maintainer/Sergeant
U.S. Army
12/1986 - 6/1998
·
Performed
fault isolation of DS0’s through DS3’s traversing governmental and
commercial lines (fiber optics, microwave, satellite) and troubleshot secure
communications systems/circuits for various governmental agencies
·
Served as
liaison for Local Area Coordinator at meetings between civilian and
government agencies concerning installations of new T-1 fiber optic trunks
into the Pentagon
·
Conducted
technical and administrative troubleshooting and operations training for
personnel on numerous systems/circuits
·
Performed
fault isolation on military equipment; managed all aspects of Quality
Assurance; conducted classroom and on-site training for over 100 maintenance
personnel; operated and maintained facility restoral plans. Performed fault
isolation on military recording and viewing equipment; researched and
ordered appropriate parts and equipment for on-site repair personnel;
operated and maintained sound systems post-wide including monthly awards
and retirement ceremonies, and post "Bugle" systems
·
Worked with
NBC technicians for set-up of equipment for the 1988 Olympic Summer Games
in Seoul, Korea
·
Managed,
coordinated and implemented systems/circuit installations/upgrades, and
assembled new database of over 180 customers of Electronic Services Branch
(SAM-OPN-CM) for the purposes of billing
·
Maintained
in excess of $120 million worth of communications equipment, and provided
on site/on call 24-hour maintenance/support relay sites and AM, FM, and TV
transmitter sites
·
Supervised
over 300 technicians and military personnel. Set-up and coordinated
training on a daily basis for Headquarters and Headquarters Company (HHC)
staff personnel; maintained all aspects of training records; conducted
weekly/monthly classroom and on-site training for over 120 HHC personnel;
held Security clearance: TS/SCI (expired 13 Mar 03)
EDUCATION
·
Frenchtown
High School, Frenchtown, MT
·
Montana
State University, Bozeman, MT
·
University
of Montana, Missoula, MT
·
Eastern
Montana College, Billings, MT
·
University
of Maryland, Pusan, Korea
|