From: route@monster.com
Sent: Friday, September 11, 2015 7:42 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ronald J. Kelly 18 Hummingbird
Avenue - Petersburg, New Jersey 08270 - Phone 410-459-8865 - rjkelly165@gmail.com Summary
·
Successful
telecom professional with a rare in-depth knowledge of the entire
telecommunications network ·
Proven
leader of multi-disciplinary teams on successful, high-profile, complex
projects ·
Very
comfortable with new technology and operating without detailed guidelines ·
Great
deal of experience with fiber optic deployment & utilization and with
Time Division Multiplexing, Wave Division Multiplexing, Digital Cross-Connect
System and Digital Loop Carrier System technologies ·
Experienced
with the use and routing of Ethernet signals for Ethernet-to-the-Cell-Site
deployments. ·
Superb
communication skills, both oral and written Work Experience 2013-2014 Windstream Communications (WIN) –
Director Program Management – Worked from Home-Managed 1 subordinate ·
Assigned to
Verizon Wireless (Vz W) West Virginia Ethernet-to-the-Tower Network (EttT)
to: o Stabilize Network & restore Vz W’s faith in the
Network (375+ Towers) o Complete construction of Network o Aid WIN Sales efforts to sell Network Hardening project to
Vz W ·
Analyzed the
paths of every Ethernet circuit in the Network, directed the rearrangements,
Network was stabilized in 2 months, brought Network construction to
successful conclusion o Vz W complaints drastically reduced ·
Personally
interfaced with Vz W and spearheaded organization & presentation of 5
different Network Hardening scenarios o Vz W indicated that they would move ahead with one of the
options 2012-2014 Windstream Communications (WIN) – Director
Program Management – Worked from Home-Managed 3 subordinates ·
Recruited as
a Director of Program Management for WIN’s national EttT project ·
Assigned to
the AT&T Mobility project in the West & mid-West (800 Towers) o
Supervised 3
remote Project Managers o
Responsible
for entire project from joint equipment layout agreement to fiber
completion/availability to equipment delivery, installation & turn up to
testing of the Ethernet circuits ·
Consistently
delivered Towers on or ahead of schedule o
AT&T
repeatedly said WIN was their best EttT vendor 2007-2012 Adaron Telecommunications- Owner- Marmora,
NJ-Managed 25 subordinates ·
Provided
design and ROW acquisition services to Verizon OSP Design Centers ·
Awarded 4
contracts with Verizon o
Copper
removal work in DC, MD & NJ o
Fiber to the
Cell Tower (FTTC) work in Northern Manhattan & Brooklyn o
FiOS MDU
Planning, Design & ROW acquisition in Manhattan & DC o
FiOS Single
Family Unit Design in Queens ·
Adaron was
highly regarded for Quality & attention to detail, but Verizon severely
cut back on FiOS deployment 1999- 2007- Lucent Technologies -Director
of Sales- Worked from Home-Managed 6 subordinates ·
Recruited as
an Account Executive for the Verizon account - promoted twice ·
Conceived and
directed several successful Sales campaigns including “CO-in-a-Box” which
resulted in an expanded Lucent footprint in Core Network ·
Directed
successful effort to dislodge incumbent Digital Cross Connect System &
make Lucent the preferred vendor in Core Network ·
Supervised
expansion of Lucent DWDM and Optical Cross-Connect footprint 1973-1999- Bell Atlantic – Integrated
Planning Manager (Engineering) – Absecon, NJ-Managed 15 geographically
dispersed subordinates & 10 indirect subordinates ·
Hired as an
OSP Engineer- Promoted twice-retired as Engineering Planning Manager ·
Hand selected
to be one of three “Integrated Planning” Managers in NJ (1992-1996) o
Responsible
for planning for all 3 Engineering disciplines: OSP, Transport & Switch o
Preparation
and administration of $110 Million Capital Budget ·
Program
Managed the largest single OSP Project ever attempted in NJ:
Barnegat-Wildwood Fiber Optic Span: 34 miles of conduit, 81 miles of fiber,
crossing of 4 major water ways (1987) o
Entire project
completed in 4 months & significantly under $8 Million budget ·
Led the
multi-disciplinary team that successfully cut over the Delaware Valley Tandem
Office (1995-1996) o
Only team in
Bell Atlantic to meet original cutover date ·
Led the
multi-disciplinary team that moved all Toll circuits to Optical Fiber-based
facilities (1994-1997) o
First all
Optical Fiber based LATA in Bell Atlantic ·
Planned &
Engineered the Lakehurst ESS Cutover (1976) Education 1972 graduate of
St. John Fisher College Rochester, NY-Bachelor of Science in Mathematics References Mr. Jimmy Dolan, Account Exec –Carrier Transport/ Windstream Phone 501-748-7873 – Windstream
Program Management Mr. Colton O’Donoghue, Director-Engineering /Verizon Phone 301-989-4850 – Adaron Telecommunications
& Bell Atlantic Work Mr. Richard P Vogl, PE-District Manager/Verizon (Retired) Phone 609-652-0116 – Bell Atlantic Engineering
Expansion 2012-2014 Windstream Communications (WIN) –
Director Program Management ·
Quickly came
to up speed on limitations and capabilities of the Cyan and Cisco Ethernet
transport equipment ·
It was
apparent in what portion of the Network DWDM and CWDM products were
being used ·
From past
experience, knew the intricacies of fiber optic deployment and the
installation, turn up and integration of transport facilities into the
Network 2007-2012 Adaron Telecommunications- Owner ·
Acted as
Quality Control on all Engineering work including FiOS Single Family design
prints, FiOS MDU planning & design, Fiber to the cell site (including
conduit construction) and copper removal work ·
Before
passing on work to subordinates, actively performed every work function
including drafting to be sure there was an in-depth understanding of all the
intricacies involved 1999-2007 Lucent Technologies-Director of
Sales ·
Developed a
deep understanding of Wave Division Multiplexing ·
Stayed
current on latest developments in Time Division Multiplexing ·
Became a
resource for the Verizon Managers and Engineers on the subject of Digital
Cross-Connect Systems ·
Was a trusted
advisor to the same group in the deployment of these facilities within the
Verizon Netwprk 1973-1999- Bell Atlantic – Integrated
Planning Manager (Engineering) ·
From the
beginning was always given the assignments involving new technologies ·
Designed the
second copper-fed Digital Loop Carrier System in the state-well in advance of
any guidelines or practices o
Facility was
smoothly put into service o
Prints and
documentation were adapted as the state standard ·
Very closely
supervised the design of the first fiber optic cable and fiber-fed Digital
Loop Carrier System in southern NJ ·
Directed
deployment of the first SONET Rings in NJ ·
Refused to
deploy TR-303 Switch technology despite tremendous pressure from Corporate
Staff o
Felt the
Operational difficulties were not even partially thought through and
deployment would have been a huge mistake o
All other
Planning Managers fell in line with this take to the question ·
Worked
extremely closely with subordinates on all Tandem Cutover issues o
It was first
exposure to Switch Technology, but were the only team in Bell Atlantic to cut
the Tandem over as per the original schedule |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|