From: route@monster.com
Sent: Friday, September 11, 2015 7:39 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Eddie Asturias Conanan 110 Shoreline
Center, San Ramon California, USA Mobile No.:
760 9709667 Email: eddiemark_sean@yahoo.com CAREER PROFILE Results-driven with over 8+ years of professional experience in a Network Operations Center /
Field Integration / Commissioning on mobile networks environment, Fixed
Network and Transport with excellent leadership qualities, team building, motivation attitude
to deliver the best, strong customer and project management.
·
Experience
in Access Network IPDSL/FTTN/xPON Devices Alcatel Lucent, Ericsson,
ADTRAN and Huawei Equipment, ·
Experience
in Transmission Backhaul Ericsson, Nokia, NEC, Harris equipment
Ericsson Microwave Traffic Node, Mini-Link, Nokia Hybrid Microwave,
Flexi, NEC PNMS) ·
Experience
in Wireless Technologies installation commissioning testing and fault
management BSS, 3G, LTE of Ericsson and Nokia Devices End to End
Testing ·
Familiarity
with the following network tools Citrix and SOM of Ericsson Netact5.3
LTE(RU20 iManager T2000 element managers, Net-cool, , Map Info. , I manager
N2000 and MRTG , Net-viewer, NETACT 5.1 XML/MML, NETACT 5.3 OSS (LTE) RU20,
MAP Info, Element Management System AMS 5520 and AMS5526 Trouble ticket
system, BMC RTTS, Network Performance Management Tool, Domain of Windows Unix
environments. Winfiol & Secure CRT, CLI - TL1 ·
Hardware
Performance Tools: EoS End of Selection and ESPA (Ericsson System Performance
Analyzer),FSM 20CS II Fusion Machine, Optical Time Domain Reflect meter
Anritsu MW9060A, Expo FTB 100 mini OTDR, Expo FTB 200 Analyzer, FTB 300 Power
Meter , Attenuator, Anritsu Optical Loss Test Set, JDSU
Position: Implementation
Network Engineer Duration:11/2013
- 12/2014 Company:AT&T
Labs Contractor - San Ramon California Department:Access
Network ·
Responsible
for change, incident management, implementation commissioning planning,
operations and testing of projects in Labs with Cable and
Media Domain associated Access Network IPDSL/FTTN/xPON, VDSL, Fiber
Optics, ADSL Devices Alcatel-lucent 7330, 7340 and 7342 Ericson BLM1500
and Genband G6 ADTRAN Devices TA500x family, Spirent
Abacus test systems, Using Management Element System AMS5520
AMS5620. Testing End to End by the used of test equipment JDSU VDSL2 test
sets, ·
Familiarly
experience, troubleshooting, configuring using Cisco or Access Network
Devices, EIGRP, BGP, STP, IPSec, ATM, LAN, WAN, Firewall, POTS
VLAN, IGMP, Radius, VOIP, Port Authentication T1, E1,10GE LAG,
Multicast VLAN, Quality of Service, GR303 protocols, CLI, TL1, scripting
Perl Programming, Linux, Lab Environment set-up test beds, 802.11ad,
802.11ac, 802.11u standards configuration of HP switches, NFC and T5C. Setting up Alcatel and ADTRAN ONT and CPE
for residential, business, multi-dwelling unit (MDU) and wireless backhaul. ·
Experience
in troubleshooting connected in switch ALU 7450 and network ALU
7750. Familiarly with the configuration Layer 3 and Multicast.
Troubleshooting power AC/DC access network operation issues and physical
connections. Position:Fault Management BSS/RNC/LTE and Microwave Engineer Duration:10/2010 - 12/2012 Company:Nokia Siemens Network - Saudi Arabia Contractor Department:Saudi Telecom Company - Mobile Network Operation Center · Responsible for Network Fault Surveillance change,
incident management, 2G/3G/4G NSN Ultra site Supreme, Metro Site WCDMA
BTS, Flexi WBTS of Network Outages, upgrading RNC Net-act , PCR and VP/VC
changes commissioning integration, and ensure the SLA. · Responsible to resolve the End to End Microwave
Transmission technical issues for IP, ATM, 2G/3G/4G
Core BSC faults, DS3, T1/E1, DSU/CSU, PRI, Fiber, Flexi-Hybrid
microwave using software NETACT 5.1 XML/MML, add/delete and monitor using
NETACT 5.3 OSS (LTE) RU20 . ·
Provide
solutions for Microwave End to End testing, Flexi BSC interface, monitor the
performance ODU / IDU RF testing with the HUB Site with Data NOC, ADM,
TNOC, SONET, SDH, WDM, PDH and TNOC Field Engineer using Net viewer
software for the following ,microwave equipment (Flexi Packet ,Flexi Packet
Hub ,Flexi Packet Radio Metro Hopper, Flexi Hopper 4E1, Flexi Hopper, Flexi
Hybrid). Position: MNOC
Ericsson Engineer BSS/RNC/LTE Duration:05/2010
- 09/2010 Company:Ericsson
- Saudi Telecom Saudi Arabia Contractor Department:Mobile
Network Operation Center · Operation & Maintenance of all 2G/3G Technology
BSS, RBS2000, RBS3000, RBS6000 Series, Monitor the Infrastructure
and applications of BSS Ericsson using a variety of tools Citrix ICA
Client, · Responsible to monitor the Severity types of alarms create
trouble ticket maintenance Down Time System performing initial fault
analysis, coordination testing with Transmission NOC, Microwave NOC,
G-Technical Assistance Center and other departments. Position:
MNOC Back Office Microwave Engineer Duration:06/2009
- 04/2010 Company:Saudi
Telecom Company, Riyadh Saudi Arabia Contractor Department:Mobile
Network Operation Center · Responsible for incident , change management control,
operation, maintenance and monitoring the microwave Performance: Ericsson
Software SOM ( Mini Link Traffic Node ) Nokia Siemens
Network software Net viewer ,Flexi Hybrid Microwave. · Giving the TAC-Support in SDH/PDH Alarm rectifications to
Field Engineers Zone Managers to minimize the outage by RCA (Root Cause
Analysis) monitoring the Maintenance Down Time for network fault
rectification. · Co-ordination with Field Engineers cascading, dismantle,
gradation, upgrade and planning for enhancement for resolution of Microwave
faults and point low/high capacity PDH link SDH, STM link,
DS3, T1/E1 DSU/CSU, PRI. Position: Access Network-Implementation Supervisor Duration:
04/2008 - 04/2009 Company:Huawei
Technologies Investment Saudi Arabia Department:Global
Technical Support · Responsible for incident , change management,
commissioning, implementation network reconstruction, Network Deployment, OSP,
FIBER OPTICS, WIFI Migration from PSTN to NGN Network upgrade and
Network Expansion. · Conduct Preliminary Acceptance Test Huawei NGN, MSAN-
Migration, DSLAM, GPON, FTTX, XDSL, commissioning & acceptance
testing of transmission, switching and AC/DC power cabinet ,
supervision of installation of these electronic cabinets ·
Familiar
with Data network; VoIP H.248, MGCP; TDM V5; DS3, T1/E1 DSU/CSU,
PRI
Position: NOC
Technical Engineer Duration:06/2007
- 12/2007 Company:Hinduja
Technology Media And Telecom, Philippines Department:COVAD
Department · TIER-1 technical network support of data services WIFI,
Cable, Media Services, ADSL, SDSL, and T1 services of
the following U.S. TELCO Company (Verizon East and West, ATT, Qwest and Bell
South) ensure that the customers are provided resolution on connectivity
issues with committed time frame, configure the remote router, outside
cabinet access. Position: NOC
Technical Engineer Duration:02/2006
- 05/2007 Company:Philippine
Long Distance Telecommunication Department:Switching
Department · Providing support for Operation and Maintenance Engineers,
of WIFI, Cable and Media Services perform service assurance work on
all radio interfaces, interpret alarms, identify and implement repairs and
restoration plans to ensure minimal service disruption.
Certificate of
Appreciation for Achieving Target MSAN History of Saudi
Telecom Company - Fixed Network Implementation November 2008. CCENT (Cisco Certified Entry Networking Technician) CISCO ID:
CSCO12142235 CCNA (Cisco Certified Network Associate) CISCO ID: CSCO12142235
Management Certificate
Completion: 35 PDU of Formal Project Management Education - PMP
SIMPLILEARN ( http://www.simplilearn.com
) Kingdom Of Saudi Arabia Date:October
2011 BTS -
Operations and Maintenance, Migration Integration and Installation Nokia Siemens
Networks - Flexi BTS / RNC / LTE Ericsson RBS
2000, RBS 3000 and RBS6000 Series, Microwave -
Set up, Installation, Integration and Maintenance Migration Ericsson
Mini-link Traffic Node Higher Capacity NEC Operation
& Maintenance DMR PDH Paso link NEO using PNMSJ Software Nokia Siemens
Networks - Flexi and Hybrid - IP Microwave LTE/SAE Architecture WBT LTE Radio
interference- Physical Layer WBT LTE End to end system Huawei Optic
OSN 1500/2500/3500 Transmission using U2000 Manager Fixed Network
Implementation, Migration, Maintenance Installation Multi
switching Access Network, DSLAM, Next Generation Network Cabinet, Radio
access network, FTTX, GPON.
Available upon
Request |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|