Brad Bowman 

Last updated:  09/10/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Garden City, ID  83714
US

Mobile: 805-758-4343   
bbowmanx1@netzero.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Telecom Engineering and Construction

Resume Value: 3kag6sh34gps3eut   

  

 

Brad Bowman

 

Phone: (805)758-4343

E-mail: bbowmanx1@netzero.net

 

 

AREAS OF KNOWLEDGE AND EXPERIENCE

 

Telecom construction and equipment installation; OSP design and construction of conduit

systems (underground & buildings); contract administration; project bids; project estimations; project supervision; project inspection; working from blueprints, schematics, and technical manuals; problem identification and problem solving; working effectively with customers, and city government personnel; right of way issues; acquisition of permits; copper, fiber optic cable, and equipment placement; copper cable splicing and termination; Microsoft program applications. 30 hour OSHA training, SWPPP training, & CPR training.

 

EMPLOYMENT EXPERIENCE

 

ID Consulting Solutions – Seattle WA, Boise ID, Tucson AZ: 7/9/12 to Present – OSP Engineer: Utility pole surveys for Kitsap County PUD, Kitsap WA. Design fiber optic route (OSP) in public ROW for Zayo Fiber Solutions project for the Tucson Unified School District. Design fiber optic route design in public ROW for Zayo Fiber Solutions for Verizon & ATT cell sites in greater Seattle WA area & Tucson AZ.

 

ITC Services Group, Inc. – Bishop CA: 9/7/11 to 7/6/12 – Assistant to Praxis Associates OSP Engineer & Construction Managers: Assist Engineering Manager in the design of fiber optic backbone and distribution routes. Assist Construction Project Manager in the construction for fiber optic network from Reno NV to Barstow CA. (Digital 395 Project).

 

ITC Services Group, Inc. – Seattle WA: 6/21/10 to 8/19/11 – OSP Engineer & Construction Manager: Design fiber to the cell pathways from ROW to AT&T cell site locations. Manage construction of ATT cell site upgrade.

 

ID Consulting Solutions – Stayton OR: 8/31/09 to 11/13/09 – OSP Engineer: Designed laterals from Stayton Co-Op Telephone Company network to all service locations for FTTP Project.

 

ITC Services Group, Inc. - Gardena CA: 4/23/07 to 8/31/08 - Project Manager: Under the supervision of AT&T Contract Admin Dept, Managed AT&T Lightspeed construction projects in the LA South Cities area. Wrote scopes of work and sent contracts out to various contracting companies for bid. Accepted and awarded bids. Coordinated multiple projects and evaluated their status. Reviewed material shipping and receiving dates and making adjustments as needed to meet project goals.

                                                                                                                                                                                                                                                                                                                                                                                                               

                                                                                                                              1 of 3

Brad Bowman                                           

 

 

Teksystems Inc. - Camarillo CA: 03/27/06 to 4/20/07 - Audit Specialist: Under the supervision of Verizon FTTP Contract Admin Dept, audited the invoicing of Verizon contracting companies as compared to what was completed in the field.

 

QIS Inc. - Yakima WA: 02/25/05 to 10/31/05 - Lead Inspector for the construction of underground conduit structure. Performed inspection of customer installations to meet construction standards.                                                                                                

 

T-Staff, Inc. – San Francisco bay area: Feb 2003 to June 2003 – Construction Inspector.

 

XO Communications – Fremont CA: 02/02/98 to 01/31/03 – Construction

Supervisor/San Francisco Market: Duties included but not limited to construction contract administration and technical expertise to ensure the work of contractors in the field was performed in compliance with contract documents and applicable to local, state, and federal laws; prepared progress payments, monitored work progress, verified time            

worked and materials used, resolved disputes with contractors; initiated contract change

order documentation; prepared and maintained job site records and progress reports;

finalized job site readiness; consulting with customers, construction field forces and coordinating material and equipment staging and/or delivery to meet project start work

dates; informed the Engineer/Project Manager on construction progress; reviewed and

monitored construction techniques for technical adequacy; consulting with planning staff, as needed or requested, to ensure design and materials meet project goals; participated in acceptance tests; ensured compliance with all permit processing and interfaced with appropriate agencies; coordinated and interfaced with other company departments; enforced job site safety and compliance with Cal-OSHA requirements; maintained good relationships with contractors and outside agencies while representing the companies’ interest; provided lead direction and training to lower level staff including contract inspectors; supervised as many as 6 inspectors and as many as 10 construction crews at one time; helped  facilitate the acquisition of permits; redesigned flawed construction drawings to help facilitate the completion of projects; estimated the budget and costs of projects; put together scopes of work so that contracts could go out to bid.

 

Brooks Communications Company – Sunnyvale CA: 1996 to 1998 – Construction Inspector: Duties included the inspection of the construction of a fiber optic network in the San Francisco bay area. Insured that contractors applied G.O. 95 and G.O. 128 standards, and that their construction methods included safe work practices

 

MCI WorldCom – Portland OR: 1995 to 1996 – Construction Inspector: Duties included the supervision, inspection, and the assistance in the right of way and permitting of the construction of a fiber optic network.

 

 

 

                                                                                                                                      2 of 3

Brad Bowman

 

Various contracting companies – Northern California: 1994 to 1995 – Independent copper splicer, termination technician, and equipment installer for various contracting companies.

 

Irish Communications – Sacramento CA: 1990 to 1994 – Project Supervisor: Duties included the supervision of the installation of 14 Rolm switches at 3 node sites at the Cottle Rd IBM campus in San Jose, California; project supervision included the toning and testing, installation, and cross connecting of over 12,000 voice and data lines in 44

single and multi-tenant buildings; the cut over of 8,000 voice and data lines from Pac Bell to Rolm switching; copper cable splicing and the termination of copper cable for various other job sites.

 

Hood Communications – Sacramento CA: 1986 to 1990 – truck driver; inside cable puller; outside cable puller; copper cable splicing and terminations.

 

Education

Elko High School, Elko Nevada: 1977 – 1981

 

Summery

 

In my tenure with XO Communications and Brooks Fiber Company, I oversaw the construction of over 300 miles of underground conduit systems and 500 building entrances for the placement of fiber optic cabling and equipment. This construction took place in over 24 cities. I have also designed underground conduit systems and building entrances.

 

The XO project took 5 years and over 33 million dollars to complete. I was involved in all aspects of this project, from conceptual design to public works sign off.

 

I am an enthusiastic, motivated, self-starter who is able to work independently or as a team leader to accomplish job goals. I am goal oriented with an emphasis on quality and performance.

 

References given upon request.

 

 

 

 

 

                                                                                                                                                             

 

 

 

 

                                                                                                                                                                  3 of 3



Experience

BACK TO TOP

 

Job Title

Company

Experience

OSP Engineer

ID Consulting Solutions

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Engineering and Construction Manager

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Construction - Industrial Facilities and Infrastructure
Telecommunications Services
Architectural and Design Services
Engineering Services

Occupation:

Engineering

·         Civil & Structural Engineering

·         RF/Wireless Engineering

Installation/Maintenance/Repair

·         Computer/Electronics/Telecomm Install/Maintain/Repair

·         Equipment Install/Maintain/Repair

·         Wire and Cable Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US-AZ
US-CA
US-CO
US-HI
US-ID
US-ID-Eastern/Twin Falls
US-MT
US-NM
US-NV
US-OR
US-UT
US-WA

Relocate:

Yes

Willingness to travel:

Up to 50% travel