STEPHEN C. AGNER
137 White Cliff Blvd.
Auburndale, Fl. 33823
Home Phone: (863)701-5312
mailto:duext1@yahoo.com
CURRENT
Currently employed as a contractor performing OSP survey functions
OUTLOOK
for 4G LTE equipment placement and FTTSC applications.
10/12 –
PRESENT
Linderlake
Pittsburgh,
Pa.
OSP SURVEYOR
● Helped to develop a business plan for Fiber growth at existing
cell locations.
●
Teamed up with vendors to determine best path for growth FTTSC, FTTN and
FTTP.
●
Helped to maintain survey/photo database using as built drawings and site
walk visits.
● Obtained Powered Industrial Truck/Fork Lift Operator
Certification.
4/04 –
10/12
Verizon
Wireless
Auburndale,
Fl.
FIELD TECHNICIAN
●
Coordinated
with others in the timely implementation of 4G equipment including
PIM testing of sites.
● Worked with engineers and contractors in installing in
building DAS systems.
●
Familiar with Anritsu site master test set and other sweep gear.
●
Worked with management to properly sure work orders were completed, fuel
deliveries were made and that tower crews had all work documents needed.
3/02 – 4/04
Teksystems
Orlando,
Fl.
Jacksonville, Fl.
FIELD ENGINEER
● Baseline driver for the Orlando Verizon Wireless market.
● Performed cluster testing and pre vs. post analysis of
equipment swapouts and new site
additions.
8/01 - 2/02
O2 Wireless Solutions
Charlotte,
NC.
SENIOR FIELD ENGINEER
● Installing and testing cat5 and cat3 cables in AT&T switch
room environments Including T1 cabling.
● T1 testing of all installed circuits from main office side and field
side of each Circuit.
● Retrofit and new installation of cable ladder racks in AT&T
switch rooms to facilitate the
3G development project.
1/00 – 5/01
Metricom
Pompano Beach,
Fl.
LEAD FIELD SERVICE ENGINEER
● Directly involved in the buildout of Metricom's Category III NIF in
the Miami market which
involved reading from As-Build drawings to determine proper bay rack
alignment and cable tray
installation, installation locations for The Cisco and Cabletron
routing/switching equipment, and
proper routing of all power, ground and data cable runs.
● Assisted in the implementation of proper grounding, circuit
provisioning, and overall market RF
coverage.
● Coordinated efforts with Bell South for local market testing and
acceptance Of Ti's, and
fractionalized DS3's for both switch and field equipment locations.
5/99 – 1/00
Bravo Cellular
Salisbury,
NC.
SYSTEM ENGINEER
● Utilized the T-BERD T1 TESTER and related equipment troubleshooting
T1 circuits
on existing sites while expanding the market with the addition of new
circuits
designated for the new expansion sites.
● Performed routine site maintenance on 10-channel analog and
9600SAS
equipment
in the field including the monitoring and troubleshooting of all site alarms
from the
EMX5000 switch.
● Involved in turnkey installation of analog cell sites for system
expansion.
11/97 – 5/99
Motorola
Charlotte,
NC.
FIELD ENGINEER
● Installed,
commissioned and maintained SC614T Base Site
equipment In the buildout of Sprint's CDMA PCS market.
● Coordinated efforts with install contractors in the building of the
Charlotte Sprint
PCS switch center using As-Build construction drawings to determine
correct bay
locations and proper installation of all overhead cable trays in a
multi-tiered layout
scheme to accommodate proper separation for power, ground and data cable
runs.
1/95 – 8/97
Technology
Project Services
Aden, Yemen
Aerotek
Buffalo,
NY.
Systems and Software, Inc.
Jakarta,
Indonesia
Shanghai, China
Bangkok, Thailand
Tel Aviv, Israel
FIELD ENGINEERING CONTRACTOR
● Installed and optimized analog and digital Motorola
equipment
including cluster drive testing and system performance analysis.
● Assisted winning team on TCS (Total Customer Satisfaction) project in
Indonesia.
11/93 - 1/95
Bell
Atlantic Mobile
Charlotte,
NC.
3/92 - 11/93
Phoenix,
AZ.
LEAD
FIELD TECHNICIAN
● Operated as Lead technician while coordinating maintenance and
system expansion efforts with the other field engineers.
● Combined efforts with Bell Atlantic's NOC facility on testing
and
acceptance efforts of new T1 spans to all expansion sites as well as
troubleshooting system outages as they occur.
CAREER TRAINING
AND
DEVELOPMENT
2/13
● Powered Industrial Truck/Fork Lift Operator Certification
5/12
●
Notary Public – State Of Florida Commission # EE 199975
4/00 – 5/00
METRICOM
●
WAP construction guidelines
●
Metricom system overview/orientation
3/93 - 1/98
MOTOROLA
● SC4850
CDMA,CBSC Operations, SC9600 System Administration & Operation
(CBSC), Unix Operations and Shell Programming, SC614, CDMA Call Processing
IS-95 Implementation & Operation and PCS
Technical Overview, SC9600 SAS &
CDMA, 20-Channel LPA, N.A.M.P.S. 10-Channel Rack Conversion, HDII Cell
Maintenance.
9/86 - 9/87
US
NAVY
● Nuclear Power School, Electronics Technician Nuclear Field "A"
ACHEIVEMENTS
AND AWARDS
● Congratulatory winning Motorola Total Customer
Satisfaction (TCS) team plaque.
● National Defense Service Medal and Good Conduct Medal US Navy.