From: route@monster.com
Sent: Friday, September 11, 2015 7:38 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jabbar G. Thomas H: 214-725-4222
Email: jabgthomas@yahoo.com EXPERIENCE
Aditi
Staffing consultant, Dallas, TX
01/2015 – 06/2015
Network Eng-OSP Planner @ Verizon ·
Managed
Projects directed towards strategic business and customer objectives. ·
Provide Field
engineering site surveys for new service to customer in the field that
requires extensive contact with construction, planning, and installation
teams. ·
Perform short
term and long term strategic design planning consideration for Fios fiber. ·
Document
as-builts updates for project reconciliation for completed construction jobs. ·
Identified
areas for process improvement, investigates customer complaints and provide
compliant solutions to complex problems. ·
Researched
possible areas of development for the FTTP Fios fiber projects in accordance
with the established objectives per Verizon . AT&T,
Dallas, TX Corporate Real Estate05/2012 – 05/2014
Manager, Environmental Health & Safety ·
Managed
National UST/AST tank team $20M budget, budget forecasting and client P&L
reconciliation. Wrote new business procedures and processes for
managers and provide tools that managed operational efficiency and
cost-effectiveness. ·
Proactively
performed Detail analysis comparing reported metrics against established
targets leading to 4 new tracking targets that impacts overall cost per
region by at least $20,000. ·
Maintain
quality compliance of standards that regulate our industry. Assist in
preparing and submitting regulatory reports, air emission reports, storm
water DMR reviews and environmental documentation to local, state and federal
regulatory agencies. Advised Director and VP’s on new legislations
impact to operations or non-compliant issues in the organizations due to
quality policy and procedures. ·
Collaborated
with other departments in modify key policies and procedures that impacts
AT&T environmental compliance across all 50 states and its stakeholders. ·
Led Vendor
performance and Payment audits in my region. Researched property
issues, Vendor issues and process issues. Save company $50,000 in
vendor fees after identifying performance cause in Vendor contracts. ·
Collaborated
with CRE on SLA’s energy efficiency initiatives to replace light bulbs saving
AT&T $20M a year. Collaborating with Fleet, GNFO,C&E & PM
on sustainable initiative to create performance indicators that monitor
Economic, Environmental and Social impacts. · Collaborative with cross-functional teams to implement
strategic global objectives to reduce expense by predicative maintenance. ·
Performed
technical reviews and possible cost on equipment and product requisitions for
all replacement projects on generators, AST tanks, pipes, pumps and power. Jabbar G. Thomas
Page 2 H: 214-725-4222
Email: jabgthomas@yahoo.com · Managed operations support for multiple areas operating
without a clearly defined structure, resulting in Best Management Practices
that vastly improved efficiencies, quick response and cost-effective
operations. · Worked with GNFO, C&E and CRE to assure compliance
with construction codes/plans, safety regulations, EPA and/or federal, state
and local codes/regulations in public utility or public works construction.
AT&T, Irving, TX, Uverse 01/2007
– 05/2012
Specialist Network Analyst U-verse Operations ·
Managed troubleshooting
network problems and end-user issue on escalation bridges per escalating
service request or problem tickets while providing resolution(s) and
implement solutions. ·
Strong
analytical and problem solving skills when reviewing data looking at trends
using statistical modeling. ·
SME in
analyzing and monitoring alerts, process flows and documentation of process
& procedures that allows for operational
efficiency across the IPTV platform. · Performed hardware and software upgrades for networking devices,
Pre and Post verification of all networking changes and execution of complex
network changes. · Planned and managed software and system deployment
projects, provided project management plan requirements for a client/server
environment. ·
Created
technical documentation in support of client-server systems and databases
resulting in timely resolution of system troubles.
AT&T, Dallas, TX, Construction &
Engineering 10/1999 - 01/2007 · Designed, maintained and managed the network of
copper/fiber facilities as well as collaborate with all technical roles from
Network/Power Planners, Engineers, and Architects to provide the most
reliable redundant scalable optical transport backbone network at local,
regional and national levels. ·
Superior
Interpersonal communication skills that produce effective communication to
leadership while clearly articulating departmental goals, objectives and
performance measures for new installations and plant maintenance to my
team. · Strong knowledge of industry-standard best
practices for engineering construction to ensure compliance with FCC, OSHA,
ADA, customs regulations, legal, building codes and new legislation laws that
impact operations. Jabbar G. Thomas
Page 3 H: 214-725-4222
Email: jabgthomas@yahoo.com · Developed Standards and ability to investigate root cause
of non-compliance findings while providing detail reporting compliance,
forecasting data per product quality to Director/VP level of Network
Regulatory division. · Managed Quality Assurance reviews on
Construction/installation crews for construction jobs with regulatory and
cost control requirements. · Managed the financial reporting and performance of my wire
centers. Texas
Department of Transportation, Dallas, TX 05/1998 - 10/1999 · Collected engineering data, performed project inspection,
traffic analysis, bridge inspections, pavement management, experience
pavement performance, material testing, maintenance methods and life cycles,
use of ground penetrating radar data interpretation, interpret plans with
environmental, survey, hydraulics studies and laser profile reading. · Utility Supervisor over a 20 men crew with a $5M budget
for the Southwest region. I was responsible pothole repair, road and
bridge repair, guardrail repair, roadway debris removal and inclement weather
response in my budget. · Oversaw $3M utility relocation of George W. Bush Turnpike
on I-35 · Assisted in Design and Construction of $13.2M road
widening project in Grand Prairie
FM 1382
EDUCATION Aviation
Institute of Maintenance, Irving, TX
Aviation
Maintenance Technical Engineer,
June 2015 Texas
Tech University, Lubbock, TXMay 1998 Civil
and Environmental Engineer
TECHNICAL
EXPERTISE:
· Airframe Inspections, maintenance publication & fluid
lines, aircraft drawings, power plant inspections, materials & processes,
cabin atmosphere control system, electrical systems and aircraft turbine
engines. · Familiar with FAR 125,135,145,147,183,193 and Advisory
Circulars 39-7D · MS Project, MS Office Suite, MS Excel, Windows 98/2000/XP,
Lotus Notes and SAP · DNS, DBA, DHCP, SMTP, HSRP, NTP, HTTP, FTP, TFTP, UDP,
IGMP, SCTP AND TCP/IP, IPsec VPN, Active Directory, PKI, SharePoint, Disaster
Recovery, Process Improvement. ACCREDITATIONS
and MEMBERSHIPS
· Six Sigma Yellow Belt · MCSA · MCSE · MCITP · CCNA · AGILE · SDLC · Waterfall · A/B operator certification · Working toward ITIL V3 certification 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|