From: route@monster.com
Sent: Friday, September 11, 2015 7:55 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
KAREEMAH ABDULLAH 4017 Huntingdale Court Wesley Chapel, FL
33543 H (718) 873-3711 kabdullahcareers@hotmail.com
C (718) 873-3711 ENGINEERING PROFESSIONAL Delivering Vision and Leadership for the
Enterprise PROFILE ·
Adept at quickly and successfully
responding to ever-changing environments and situations, able to consistently
achieve goals within critical project deadlines, and able to leverage an eye
for detail to ensure the quality and accuracy of projects. ·
Technical
experience in developing leading-edge solutions. Applied knowledge of product design, validation
engineering, leading-edge product development and technologies, in
combination with industry and business skills which translate client business
requirements into specific system, application, and process solutions. CORE COMPETENCIES Engineering Project Management • Joint Use • Cost Optimization
• Process Improvement • Profitability Optimization • Mechanical Design
• Budget Control and Monitoring Contract Negotiations • Proposal Development •
Risk Assessment and Mitigation New Product Development (R&D) • Regulatory
Compliance • Customer Service Team Training and Management • Troubleshooting Mathematics • Chemistry • Physics TECHNICAL PROFICIENCIES UNIX • Microsoft Windows XP / NT / 2000 / Vista •
AutoCAD • Visio • Capacity Creation • PeopleSoft TIRKS / LFACS • ICGS / IDDS • Vbuild• iVAPP•
BDMS• AAIS • Microsoft Access / Excel / Word • WordPerfect • Ethernet Frame
Relay • X.25 / VLANs • T1 / DS3 / OC3 PROFESSIONAL EXPERIENCE Indotronix Intl. Corp.Ashburn, VA
2012 – Present Hicap
Coordinator / Engineer / FIOS Planner Assist and resolve complex technical issues and
questions involving network issues. ·
Build Hicap systems (OC03, OC12, OC48,
SLC, Litespan) into TIRKS as designed by the outside plant. ·
Recover and disconnect any unused
equipment in the central offices and customer locations, ensuring that
equipment was reused whenever possible, saving thousands in annual labor and
material costs. ·
Ensure that circuits that came through
requestnet were answered by the standards set forth by Verizon (e.g.
Unbundled and bundled T1s, T3s, ISDN, wireless, Ethernet, etc.) ·
Address orders in the Pclist buckets at
least 2 days before rid dates. ·
Determined root causes and developed
innovative timely solutions to customer problems. ·
Plan and Install FIOS equipment (OLT,
EDFA, G6, etc.) to provide growth for the central offices in the state of
Virginia. Created CCRs/ VPLAN reports and Growth Notifications to
ensure timely turnup of FIOS equipment in the state of VA. Apple Inc./Kelly ServicesWesley Chapel, FL
2011 – 2012 Technical
Advisor (Part-time) Provided first
tier end-user technical support via telephone. Assisted
and resolved complex technical issues and questions involving the iphone/
ipad/ ipod and iMac by PAIR (probe, analyze, isolate and resolve).
Setup repairs and worked closely with engineering department to troubleshoot
and correct equipment problems, as needed. Assisted coworkers in
resolving similar problems. ·
Consistently received highest rating on
quarterly reviews. Contributed to achievement of quarterly goals and
objectives: awarded bonuses. ·
Routinely volunteered to work hard to
cover shifts. CoverallWesley Chapel, FL
2009 – 2011 Franchise Owner Provided strategic direction and leadership to daily
operations of health based commercial cleaning business. Interpreted
and understood the commercial requirements of the customer and translated
them into final products that met or exceeded specifications.
Maintained tracking systems, updated and maintained regular and frequent
communications with clients. Performed business development, financial
management, proposal generation, and other administrative functions related
to the daily operations of the business. ·
Recognized market fluctuations and
adjusted business plans to remain competitive. ·
Communicated organization’s vision and
direction to team. VerizonTampa, FL2007-2009
Outside
Plant Engineer / Joint Use Engineer Engineered and managed multiple transmission and
distribution projects. Worked in conjunction with local power companies to
negotiate joint use agreements and amendments. Acted as single point of
contact regarding joint use issue with Florida power companies. ·
Provided technical and analytical
support to construction and engineering departments for infrastructure
construction projects. ·
Conducted audit of billing invoices and
recovered $100,000 in 2009. ·
Maintained accurate records of
agreements, as well as all interactions with power companies, CATV companies,
Competitive Local Exchange Carriers (CLEC), and third party attaches.
Provided accurate billing to all parties. COEI OPCEN Project Manager2007 –
2008 Provided technical and analytical support to COEI
and engineering departments. Developed recommendations that aided in
the successful completion of stalled projects, decreasing costs and expenses
related to open work orders. Managed activity between cross-functional
team to ensure timely completion of 200+ projects each month. ·
Saved $1,000,000 in material costs by
analyzing and organizing inventory and determining if materials could be
reused or retired. ·
Worked in partnership with COEI
department to coordinate bids with contract administrator for outsourced
projects. HICAP Engineer/Coordinator1998 –
2007 Delivered technical expertise to the design,
installation, and maintenance of broadband systems and cell phone towers for
the Eastern Shore Area of New Jersey. Managed $5,000,000 budget.
Conducted root cause analysis and developed innovative solutions to customer
issues. ·
Functioned as single point of contact
for CPC, cable television (CATV), engineering, construction, and technicians
in the resolution of High Capacity Communications Systems (HICAP) issues. ·
Saved $1,000,000 in labor and materials
costs with the recovery and disconnection of unused equipment in the central
office as well as customer locations. Outside Plant Planner2002 –
2006 Following plant requirements planned and installed
Next Generation Digital Loop Carrier (NGDLC), Fiber To The Premises (FTTP),
and HICAP equipment into mid-town Manhattan central offices. Created
estimates and developed underground fiber schedules. Assigned ports,
built Extension in Use (EIUs) and installed equipment through customer
controlled routing (CCR). Ensured all projects were completed within
established budget guidelines. ·
Received Vice President’s Commendation
for excellent performance in Engineering and
Planning for the Republican National
Convention in August 2004. ·
Nominated for Verizon Excellence Award
for contributions toward restoration efforts following September 11, 2001. Outside
Plant Engineer1996 – 2002 Designed
the installation of the local telecommunications network, and coordinated
copper and fiber placement within the Midtown Manhattan Area. Planned,
executed, and reported on original science studies using a fresh approach to
resolve new problems. Designed re-centering and re-routing of
facilities as a result of scale large demolition and construction projects.
Responsible for new turn up and maintenance of all HICAP services in the W 50
ST district area including T1’s, T3’s, OC3C’s, cell sites, Nortel Access
nodes, AccessMax, Lucent Lightspans, Sonet Rings, DWDM, copper HDSL, ADSL. International
Papers, Several Locations1993-1995 Largest forest products company
producing uncoated paper, industrial and consumer packaging, and pulp. Process
Engineer, Internships ·
Assisted process engineer with work on
paper fiber length and porosity significantly reducing the cost of
maintaining evaporators. ·
Executed extensive modification and
adaptation of standard procedures, methods, and techniques ·
Evaluated performance of the mill’s
refiners and refiner plates. ·
Performed many lab experiments and
evaluated data. Prepared reports of toxic chemicals for Massachusetts Toxic
Use Reduction Act and aided in work regarding Title V Clean Air Act. ·
Worked with manufacturing in
streamlining and updating Lock Out Tag Out Procedures. ·
Designed detailed diagrams of
instruments and evaporators. ·
Collaborated with fellow department
members in green liquor study. EDUCATION Master
of Business Administration Long
Island University Brookville, NY Bachelor
of Science, Chemical Engineering Rensselaer Polytechnic Institute Troy, NY |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|