From:                              route@monster.com

Sent:                               Wednesday, September 16, 2015 2:00 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: OSP Technician

 

This resume has been forwarded to you at the request of Monster User xapeix03

Rabiul Islam 

Last updated:  03/12/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Jamaica, NY  11432
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Resume of Rabiul Islam

Resume Value: 6t8ijfvc593nsmj8   

  

 

RABIUL ISLAM
88-34 161st Street, Jamaica, NY 11432                Phone and Email : (347)592-7618 ; islam.rabiul65@yahoo.com              
Objective : To obtain a position where I can utilized my skills and/or experience o benefit my organization or a company as well as develop my career with the company.

Highlights :

·               Excellent communication skill and organizational skill required to handle multitasking in order for leading to a rapid growth or advancing of a fast-growing company/organization respectively. Self motivated and able to work at a fast pace. Excellent interpersonal skill with the ability to maintain professionalism. Efficient in expert use of MS Office 2003, MS Access Database Software, and troubleshooting.

·               Certification : ACI Concrete Field Testing Technician-Grade-I; E-commerce certification; Outside Plant Engineering Training. Certification of successful completion of Earthwork Inspector’s School from Hauppauge, New York.

VersaCom LLC TRAINING                     San Antonio, TX

Outside Plant Engineering (OSP) Trainee                                                                         10/2009-11/2009                                                                                                                                                                             
The training consisted Design and implementation of FTTN, FTTP and F2 conditioning, Autocad 2006 through field visits and measurements, use of LFACS, MIC, ARES(Automated Record Engineering Software) for AT&T’s network in OSP Engineering. Right of Way/Easement Documentation knowledge. Identifying copper and fiber plant for engineering project design for aerial and underground structures including conduit.

Education :

Higher Institute of Mechanical & Electrical Engineering  Sofia, Bulgaria

Bachelor’s Degree and Master’s Degree in Electrical/Electronics Engineering                                                                                                                                                   

Work Experience :
Reliant Electrical Inc     Brooklyn, NY
Office Assistant              8/2006-9/2009

·               Reading various types of drawing(working, shop etc). Created Inventory Spreadsheet for electrical accessories and equipments. Under direct supervision of a Master Electrician, performed testing and commissioning of electrical equipments. Learned hand-on wiring and electrical installation of building and various electromechanical machines as an apprenticeship under an experienced senior Electrician. Performed various inventory procedures for a warehouse of a contracting firm. Studied electrical plan, estimated the number of switches and outlets required in a floor, an apartment or a building in a specific project location. Using Microsoft Excel, created macros to automatically reveal on-hand quantity, missing items, items returned etc. Estimated/prepared bidding/pricing, purchase/delivery orders etc. Conducted Job Tracking via Access; created smart queries to retrieve individual man-days of a projects, and many other office responsibilities.

 

Versacom LLC & Mavrickit/AT&T(IT Firm under AT&T)    Dallas, Texas                                                                                                                                                1/2006-7/2006

·               Performed outside plant engineering work of fiber/copper outside plant projects, including rehabilitation and relocation of cable facilities. Operated with Autocad, ARES, MET^2, BSTCAD and MicrosoftStation drafting design software to perform job functions. Maintained documentation/drawings; performed F2 conditioning design for AT&Tprojects. Involved in accessing, reading and interpreting mechanized assignment records, PC applications and telephone industry standards. Operated with AutoCAD, ARES, MET^2, BSTCAD and MicroStation drafting design software to perform job functions.

NYS Dept of Transportation                          Long Island City, NY
Transportation Cons. Inspector level 2                          7/’04-12/’04; 4/’05-12/’05; Ensured by monitoring adherence to all guidelines and safety procedures stated in the specification book. Conducted Cylinder tests and moisture-content tests in order to maintain concrete in conformity with specification book. Acted on installation of single span and cantilever sign structures,; rectangular & circular footings, structural concrete; sign panels; cable & light fixtures etc.; Performed inspection of excavation for on-structure electrical conduit installation, installation of conduit junction box, & backfilling. Performed inspection in case of wiring through truss members for illuminating sign panel in order to facilitate bill itemizations. Performed inspection for removing old and installing(by anchoring) new corrugated beam guide rails Prepared Daily Inspection Report concerning interim and final quantity, description of work done, manpower and equipment used and estimates. Performed other many other jobs.

Prokalpa Upadeshta Ltd.(Consulting Firm for Archit. & El. Design Engineering)Dhaka, Bangladesh                                                                                                                                              1996-1999             

Performed various design activities/procedures for power System(Voltage Drop analysis, power factor improvement analysis, sectionalizing study(line fault analysis) intended for co-ordination of signaling system through installing protective devices such as relays, cut-outs, break switches, circuit breaker etc. Developed software using FoxPro programming and Excel in order to perform fault-current calculation. Analyzed and computed System Energy Loss. Developed software using Visual FoxPro Programming for doing this computation. Studied feeder maps and circuit maps of the electric substations for load judgment and analysis.Estimated bill of material quantities as per rate analysis; labor force; work done by the contractors and engineers based on the Close-Out documents & ‘Contract Book of Agreement’.     

Niaz & Associates (Consulting Firm for power Distribution)Dhaka, Bangladesh
Supervision Engineer; Assistant Engineer04/1993-05/1996             

·            Inspected/supervised installation and maintenance of electrical system of Hi-rise buildings in terms of complete Lighting and House-Wiring Lay-Out. Performed various load calculation and estimates in order for sizing branch-circuit cables from feeders; disconnect switches; breakers; and various receptacle outlets etc. intended for over-current protection and over-all design.

·               Troubleshot malfunctions of various types of electrical components including High, Medium and Low Voltage. Supervised on-going construction of sub-stations, fabrication, and installation of electrical switchgear components such as oil-circuit breakers, relays, disconnect switch, and voltage regulators etc. Performed maintenance of the electric lines and sub-station as well as installation of capacitor banks in oder to improve Power Factor in the line. Performed feasibility study, preliminary survey and data collection in order to implement new power distribution lines required for design purposes. Inspected/Supervised Low, Medium and High Voltage power distribution projects that included construction of rural power distribution and service lines, pole erection, mid-level distribution sub-station, installation of equipments on them etc.
 

·               Inspection of Sieve Analysis test of sub-grade, gradation test of coarse aggregate, penetration test of bitumen, slump test of fresh concrete, . Prepared reports for those. Assisted the Design Engineer or Senior Engineer in various design procedures for power system.

             

 

                                                                                                 
                                                                                   
 

 

 

 

 

 

 

 

 

 

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-NY-New York City