From: route@monster.com
Sent: Wednesday, September 16, 2015 2:00 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Mobile :
09585595737
Raja.R
Email : raja_svcet36@yahoo.co.in
Work Summary
An experienced
Electrical Engineer and specifically trained in the areas of Electrical
Planning, errection and commissioning of Transmission and Distribution
System. Working with NCC Ltd(Nagarjuna Construction Company Ltd) as
a Project co-ordinator and worked at Navayuga Infotech as a Zonal
Manager, ESRI India as a Team lead and Reliance
Communications Ltd as a Deputy Manager in GIS & Fiber Network
Planning involved in Design and detailed engineering services for Telecom and
Electrical domain. Professional with 8.8 years of work experience in
GIS Projects , Urban Planning, Telecom Wire line & Wireless
Projects and Engineering Products . Carrier Summary
NCC Limited (Nagarjuna Construction Company
Limited).,Since July 2013 Tamil Nadu State R-APDRP (Part-B) Project:
Power Transmission and Distribution System
Designation
: Project Co-ordinator for Erode Region Nature of the project is to
increase and strengthening of power distribution system and up-gradation
of 33/11kV network and distribution system to curb down technical and
commercial losses. Erection
Responsibilities: v Erection of New DTs (DistributionTransformers-22KV/433V) Double Pole
Mounted Transformers in the range of 40KVA,63KVA,100KVA,200KVA. v HVDS(High
Voltage Distribution Systems) – Erection of Single pole mounted DT’s in the
range of 16KVA,25KVA.(22KV/433V) v Erection of New OH Lines: Ø Extension of New 22KV Line with
Raccoon, Rabbit conductors. Ø Strengthing of 22KV Line with higher
size/Equivalent to ACSR-Raccoon and Rabbit conductors on the same supports
and insertion of new poles. Ø Conversion of 1KM of LT single
phase 2wire line to 3phase 4wire line with ACSR- Rabbit and Weasel conductors
on the same support. v Aerial Bunched Cable: Erection
of 1.1KV 3Phase 5wire power line on 9Mtrs supports with average span of
40Mtrs using 3x70 + 1x16 + 1x50 Sq.mm Aerial Bunched Cables(ABC) v Laying of New UG Cables: Ø Conversion of Over Head 22KV Lines
with 33KV, 3x400 Sq.mm XLPE cables. Ø Triple pole Structures with “UG
Cable In & Out with Tapping for DT” Ø Triple pole Structures with “UG
Cable In & Out with Tapping for Spur Lines” Ø Laying of 33KV,3x400Sq.mm,XLPE UG
Cable for Bifurication of existing 22KV UG Cable for formation of new
feeders. Ø Laying of new LT UG cable, 4x240
sq.mm Ø Conversion of LT OH line into
LT,4x240 Sq.mm, UG Cable Ø Erection of outdoor Termination
kit(Heat Shrinkable) suitable for 33KV, 3x400 Sq.mm , XLPE, UG Cable. Management Responsibilities: Ø Handling the team of 250+ workers,
25+ Engineers and 15+ office staff team. Ø Co-ordinate with the Department
people for the section level support for the field engineers to
carryout the Quantity survey. Ø Co-ordinate for GTP and
Drawing inspection and approval. Ø Identification and Finalization
of Subcontractors with the help of Ø Verification of survey data and
also to facilitate the field Engineers to getting the approval from AE’s,
ADE’s, EE(O&M), EE(General). To getting the approval for Electrical
layout drawings from RAPDRP Team, SE , CE. Ø Preparation and verification of
BOQ (Bill of Quantities) after the receipt of drawings from the Site
Engineers . Ø Verification of measurements
recorded in RA Bill’s with measurements already prepared with
the survey drawings. Ø On daily basis receiving the
measurements from the site Engineers location wise with feeder name, Sub
division Name, Division Name and Town Name. Ø Preparation of Running account
bills for subcontractors with the exact measurements received from the
site Engineers. Ø Preparation of Material
planning, Execution Billing & Planning, Collection for Month wise, 4
Months(Quarterly basis)andS Entire project. Ø Preparation of Material Indents as
required for the monthly work executions as per the Material Planning and
send to HO. Ø Finalising the Staff, Machinary and
Manpower, discussing with Site Engineers. Ø Finalization of Non-BOQ items. Ø Survey & Execution of the
project as per the schedules , drawings and Specifications. Ø Finalizing the Quantity for bought
out items/Sub
contracted terms for Procurement Ø Follow up and Liasoning with
clients and various Suppliers for material inspections and
getting Dispatch Instructions to stores. Ø Arranging the Inspectors to visit
the stores to verify the material received at stores and obtaining the MRC(Material
Receipt Certificates) which is required to submit the RA Bills. Ø Getting the permission from the
various government offices for work execution in their respective areas such
as Corporation Department, Panchayat offices, Metro water and Sewage
Department, BSNL and Other Telecom operators, State Highways Department and
National Highways Departments. Ø Services related points and issues
will be coordinated with material Department. Ø Preparation of C Form in
Co-ordination with Accounts Department and Stores Ø Ensuring that the ERP
Implementation to be done in each site. Ø Preparation of claimed quantity Vs.
Paid Quantity comparison statement Ø MIS reports to be prepared and
Submitted to HO. Ø Implementing and Ensuring the
Safety and conducting the monthly safety meeting at site loctions. Navayuga Infotech Pvt Ltd., From July 2011 to July 2013 Tamil Nadu State R-APDRP (Part –A) Project :
Power Transmission and Distribution System
Designation
: Zonal Manager Nature of the project is to
increase and strengthening of power distribution system and up-gradation
of 33/11kV network and distribution system to curb down technical and
commercial losses. It includes construction of new
33/11 kV power substations, 33&11 kV HT lines and installation of new
district substations etc., It also includes augmentation /renovation of
existing 33/11 kV PSS(Power Substation), 33&11 kV Feeders and minimizing
of LT Lines etc., using baseline data surveyed from the field with the
help of DGPS survey and new network planning using ArcGIS and AutoCAD
Software. v Handling the team of 100+
survey team members and 25+ members of GIS team. v Study of Existing 33/11 kV
Substation Planning and monitoring activities using ArcGIS v Preparation of 33, 11 kV HT network
and 0.44 kV LT network based on DGPS survey. v HVDS Design, losses calculation for
both HT & LT networks and identify the benefits of modified system. v Planning of new Distribution
Transformer and Low Tension network collecting the As-built drawing from
Maintenance& construction team and feasibility will be checked in
the field and updating the same into ArcGIS. v Preparation of Asset mapping and
Consumer indexing using ArcGIS. v GIS Mapping of entire distribution
network, 33/11 kV Transformers, Feeders, low tension lines, poles and other
distribution network equipment’s. v Co-ordination with Local TNEB
zonal and central officials for process initiations and gathering
available information’s v Getting approval for surveyed
data’s from TNEB officials through field verifications v Vendor validation through pilot
survey. v Vendor Co-ordination for getting
soft data of all the collected attributes from the field. v Providing the status to
NHQ ESRI India Ltd., 1st September
2010 to July 2011 Karnataka State R-APDRP Network
Survey & Consumer survey Data QA/QC,
Project Base map Creation and
Integration, Vendor Management
Project
: Karnataka State R-APDRP (Par- A) Designation
: Team Lead The nature of the work is to
validate both the network survey data and consumer survey data. Preparing the
AOI for base map creation and QA/QC for the newly generated Land Base DB and
Integration QC for Network with Landbase DB. Providing In-house and Field
Training for ArcGIS, Filed by field explanations to attribute collection
(Network &Consumer) to the newly appointed vendors. Network Data and Consumer data
Validation
v Responsible for the quality of
support, development, and enhancement tasks. v Monitors and analyzes operational
efficiency and effectiveness to meet Department business needs. v Develops and implements project
work plans, change requests, and GIS v installations/upgrades. Maintains
assigned IT assets, and submits purchase requests v Accountable for delivering GIS
results within scope, resource, and schedule constraints v Repairs, restores, or recovers GIS
to minimize business interruptions or impacts. Vendor Management
v Vendor co-ordination for data collection
in the field ( Consumer survey, Network survey, Pole painting, Phase
detection) v Vendor Co-ordination for getting soft data of all the
collected attributes from the field. v Providing QA/AC report status to client and NHQ v Vendor validation through pilot survey . Reliance
Communications Ltd., Fiber Planning
Division – September-2006 to August-2010
Fibre Planning using Telcordia
Network Engineer
Technology ArcGIS,
Auto CAD Map 2000 Role :Planning Engineer Design
of BTS & Issuing Of Consolidate Design to construction. This project is mainly
concerned with the Base Transceiver Stations (BTS) in all over Tamilnadu
circle. The scope of this project is to make sure that all the drawing for a
particular BTS should be secured in Center Engineering with there latest
change levels. v Network cable route Analyzing & Finalizing v Releasing the Mark up Drawings for construction v Analysis, processing and creation of models from the
data provided from the vendors using NE Model Builder. v Instance of equipments (models) in facilities (in NE)
as per the nodal design documents. v Making internal and external connections between the
equipments. Out Side Plant (ArcGIS & Auto
CAD in OSP)
Technology : Telecordia
Network Engineering, Arc GIS & Auto CAD Map 2000. v Collecting As-built data from Construction Team v OSP data migration in NE v Preparation of As-Built drawings for Back Bone &
Back Haul stretches. v Migrating Auto cad Drawing into Arc GIS Platform
and detailed Study of Drawings. Projects Handled in Reliance
Communications LTD
Optimization of Diesel Distribution Project.,
The scope of this project is to
Minimize the Time and cost of fuel distribution to Reliance
BTS sites( Each BTS sites has operated by Diesel Generator and the diesel has
filled by Vehicle by routine basis). This projects includes the
following activities. Efficient Utilization of Optical
Fiber Project
The scope of this project is
to Efficient and maximum utilization of Optical Fiber laid across all
over India. OFC was laid in filed( information’s has kept in O&M and
construction team) but it was not updated in NE . The same has migrated
in NE. v Co-ordinate with O&M and
Construction Team to the As built mark ups for the fiber route across the
network. v Input has been validated by the
type of ring in the route and No. of .used lines, Damaged lines, Fiber Type,
Drum ID, Man Hole details, Splice details obtained with the respective team. v QA & QC done for the As built
update and migrated in Geo Data Base. WIRELINE PROJECT MANAGEMENT
In this project is
to visit at customer end and finding our all the possible solutions to get
the building connected with the existing fiber network across it. During this
time type of Road, Distance of building from the fiber point ,aerial route
feasibility, Road crossing are required or not to be checked. v Planning for fiber connectivity, Copper,
equipments & Rack are done. v With the Detailed study of site
survey, Scope is released and IFC drawing for the same is issued. Minimal
Capex and optimal solution is obtained through IFC drawing. v Co ordination with construction
team for implementation of the IFC in field and meet the requirement in time. WIRELESS PROJECT MANAGEMENT
v Site visit at customer end and
finding out solution for wireless options. v Wireless feasibility such a UBR and
WIMAX. v Line of site is checked with near
by BTS from the rooftop of the building. v Route walk is carried out to check
the BTS location and also for any High rise building obstruction in-between
customer building and BTS. So that the height of the pole/tower at customer
end can be calculated to get it connected with near by BTS. v Availability of any other customer
on UBR at BTS end is cross checked with GIS before confirming for any
connections for the second one and also the BTS capacity is checked with transport
team. v Planned equipment & rack
details are incorporated in Telcordia NE. v Material availability and co
ordination with construction team to make the customer building feasible with
wireless network. BIG BUILDING PROJECT
v High value apartments are
identified in co ordination with sales team and site visit is carried out. v Detailed survey for all possibility
of wireless and wire line is carried out, considering minimal capex. v Building size, numbers of blocks,
Number of occupants are obtained from the respective officials of big
buildings/apartments and the plan is designed. v Minimal capex & optimal wire
line/wireless are obtained and IFC is released. Work Experience – Axis
Communications June -2005 to Sep 2006.,
Role
: Assistant Electrical Engineer Axis Communications is one of the leading and pioneer
groups of companies in the field of Constructions and Engineering . Sub
Contractor of Reliance Energy Ltd Responsibilities: Survey And prepare
Quantify the work to be carried out in the division in coordination with
planning engineer v Preparation of Pole schedule for sub-contractor v Preparation of Pole schedule / JMC / for
RA bills v Material Reconciliation For Sub Contractor v As Built Drawings Preparation v Coordinate with Sub contractor for Work Force Academics
Master
of Business Administrations (HRM)
from The Institute of Chartered Financial Analysts of India from ICFAI University-
Pursuing Bachelor
of Engineering (Electrical and Electronics Engineering ) from Anna University, SVCET (2002
- 2005) Diploma
in Electrical and Electronics Engineering from Sri Nallalaghu Polytechnic (1999 –
2002) System Skill Set
Project Application :
Telecordia NE, Arc GIS (9x/10x), AutoCAD Map 2000 & 2006, Operating Systems
: Windows XP; Windows 98; Windows 2000Professonal Languages : C,
C++, Core Java Data Base :
SQL server 05/08 Personal Profile
Father
Name
:
M. Radhakrishnan
Mobile
:
09585595737 DOB
:
20.08.1983 Pass Port No
:
J0878998 Passport Validity
05.09.2020 Languages
:Read: Tamil, English, Hindi Write: Tamil, English, Hindi
Speak: Tamil, English, Hindi
Permanent Address:58, Mahavir
Garden Annex-2, 2nd cross street, Kavangarai, Chennai
-600066 Tamil
Nadu |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Hindi |
Advanced |
|
|
Tamil |
Fluent |
|
|
|