From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ELWOOD SPENCER 701
Autumn Drive Roselle,
Illinois 60172 OBJECTIVE To obtain a position in Project
Management/Construction Management and leverage my experience in the
Telecommunications Business. I have my Masters Certificate in Project
Management with a proven record of successful deliveries on time and within
budget. EXPERIENCE
Sept 2012 – Jan 2013 Consulting/T-Mobile
LTE Project. Construction Field Manager
·
Pre-con sites
walk with General Contractor on the location and design Site Build Out. ·
Cooperated
and interfaced with other personnel to insure timely completion of the
project- ·
Monitored
General Contractor activities on designated sites. ·
Cooperated
and interfaced with other personnel to insure timely completion of the
project ·
Ensure quality construction standards and adherence to
project plans. Coordinate QA processes
and
resolution including all punch-list items ·
Commissioning
and integration support experience. ·
Reline
Constructions Drawing. EXPERIENCE
May 2010 – Oct 2011 Consulting /
T-Mobile Project Manager/Construction/ Field
Engineer AAV FIBER PROJECT · Pre-con sites walk with ATT Engineer on the location and
design Fiber Path. · Cooperated and interfaced with other personnel to insure
timely completion of the project
Sept 2008 – Mar 2009 Consulting
/ Cricket Communications, Inc. ·
Construction
Facilities ·
Conducted
pre-constructions site walks with bidders ·
Call about
Permits and Zonings ·
Walk sites
with ComEd for power to the sites ·
Make sure
ComEd meters are install to the right pole per the prints ·
Coordinated
overall schedule of tasks to be completed by contractors ·
Cooperated
and interfaced with other personnel to insure timely completion of the
project ·
Reviewed bids
and ensured requisitions are entered for material orders ·
Monitored
General Contractor activities on designated sites. ·
Walk sites
with ATT and Verizon Engineer on the location of the T1 ·
Make sure
Conduit is ran to the correct ATT or Verizon Terminal(DEMARC LOC) Oct 2007 – July 2008 Consulting
/ AT&T
Construction Coordinator OSP – AT&T Project Lightspeed/ UVerse
experience ·
Supervised
the construction and installation of Fiber Nodes/Cabinets, coordinate
the splicing of copper cables both aerial and underground for cut over. ·
Project
Coordinator for the installation and maintained network elements associated with
delivery of high-speed services such as multi-plexers, loops and digital
carriers equip ·
Coordinate to
ensure that design change materials orders are processed. ·
Use both the
JAM SYSTEM / Lightspeed Order Management System to verify that correct
material was ordered. ·
Pre-Survey
where equipment will be place ·
Pre-Survey
the construction of the job site to the construction blue prints ·
Installation
of the inner duct ·
Maintained
flow process designed to tract the different phases of the project from start
to finish, developed a shared file spreadsheet that all information was
inputted to provide a one point of contact for progress reporting. ·
Make field
trips to gather field data and prepare field notes for recommendations to the
engineers or for designing work orders ·
Make sure
power is installed Sept 2006- Oct 2007 Consulting /
Sprint Nextel Construction Project/Manager 4-G project ·
Responsible for
working with the site development team to design a cost effective site.
·
Oversee project
design by assisting with site sketches for inclusion in lease documents,
review and approval of site plans for zoning, permitting and construction.
Ensure the most economical and best construction practices are utilized.
·
Order services
and coordinate activities of outside vendors, surveyors, geotechnical and
environmental consultants, utility installations etc. AT&T and ComED.
·
Prepare bill of
materials - equipment and project materials.
·
Prepare bid
documents, coordinate contractor bidding and awarding of work. Conduct bid
walks and preconstruction meetings.
·
Database and
timeline updates to track adherence to project deadlines.
·
Ensure quality
construction standards and adherence to project plans. Coordinate QA
processes and resolution including all punch-list items.
·
Proficient with
iDEN and CDMA technology
·
Maintain safe
work environments, monitor safety process of contractors, compliance with
regulations.
·
Oversee
completion of closeout documentation.
·
Also, have
previous experience working with Siterra.
2003 - 2006 – Consulting / Motorola ·
Working in
Schaumburg, performing various high tech assignments at Motorola. ·
My job
assignment included building RF radio cabinets for Nextel setting up E911 and
Two Way Radios systems for Government Systems. Assigned packing slips and
inventory equipment prior to shipment. ·
Also, worked
in the CCSI warehouse area placing and removing equipment. ·
Worked on building
IDEN Radio equipment. 2001 - 2001 – Consulting / Tellabs ·
Worked on the
Ameritech/SBC account, Project coordinated Test and Turn up activities for
Tellabs equipment installed in Central Offices. ·
Also,
responsible for scheduling Vendor installation activities, preparing project
MOP’s for customer approval, working with the NOC (Network Operation Center)
for project cutover support etc. ·
Used SAP to
track equipment shipped from Tellabs factories to the customer site location.
2000 - Lucent Technologies (Project
Manager). ·
Single point
of contact for the customers related issues. ·
Worked at
Naperville corporate site coordinating the tracking and reporting services
project completion and performance activities reporting. ·
Reviewed the
project plans, worked the plans and provided upper management and team with
status on a regular basis. ·
Planned and
scheduled testing, installation, deployment, customer turnover, and
maintenance contract agreements. ·
Kept a
prioritized list of project action items and open issues, provided analysis
of the issues and negotiated resolutions as the project progressed. ·
Resolved any
issues or concerns of the customer in a timely manner bringing the project to
completion on time and in budget. ·
Coordinated
activity with other project managers to keep us in sync as a team. 1995-1999 - Lucent
Technologies (Bids Proposal Manager). ·
Responsible
for managing, directing and issuing Installation Labor Contract proposals for
Ameritech/Cincinnati Bell Customer Team. ·
Managed the
Bid Proposal response activities (Review of T&C’s) for labor estimates.
Maintain ISO-9001 compliance for labor Contract process. Served on Field
Planning Team for projects consisting of installing lucent 5ESS Network
Switching equipment, DDM2000/Sonet (OC3, OC12, etc.) Fiber networks,
AT&T and Sprint cellular CDMA networks. ·
Member of the
Mechanized National FPQ Services Sales Software IT development Team. Member
of the monthly revenue recognition results team. 1979 - 1994 Western Electric / AT&T
Network Systems (Operations Staff Supervisor). ·
Worked
on the AT&T (Tridom/MicroWave) Commerical Business Project. ·
Worked on the
Field Sprint Fiber (FTTX) route team. ·
This
consisted of laying Fiber between COE and Repeater sites. Also included Fiber
installation within the COE. Prepared bids for Fiber routes (OC3,
OC12,) responses. ·
Also, worked
on the project team assisted to replace GTE’s state wide outside plant
cabling network. This project required replacement of both buried and aerial
cabling from the COE to the customer premise. ·
Responsibilities
also included supervising the Logistic Material handling group for
Warehousing and Transportation for Lucent Technologies provided material for
ten states as follows (IL, MI, WI, OH, IN, TX, MO, AK, OK, and KS) for
Network Systems installer orders. This also included processing invoice bill
payment approval. 1975 - 1978 Western Electric (Regional
Telephone Equip. Removal Sales/Project Manager). ·
Coordinated
both the Removal Activities and Contracting Removal Services to dispose of ·
This
consisted of conducting meeting with Telephone Engineer, Field Service
manager in order to develop a project plan for removal of their COE
equipment. Held weekly internal meetings and customer meetings for each
project. Kept a prioritized list of project action items and open issues,
provided analysis of the issue and negotiated resolutions as the project
progressed. Provided upper management with status on a regular basis. 1970
- 1974 Western Electric (Installation Service labor Pricing Estimator). ·
Provided
estimates on labor for service to the following customer’s Michigan,
Illinois, Indiana, Wisconsin, and Ohio Bell. 1964
- 1970 Western Electric (Central Office installer). ·
Worked in
Michigan Bell’s COE in Detroit. Installed and tested telephone
switching equipment. Prepared MOP’s for cutover activities. Worked on
Switching, Toll, Power, and Distributing frame equipment etc. EDUCATION Masters
Degree in Human Resources - National College of Education Illinois TECHNICAL SKILLS Software
Microsoft Word, MS-Office, WordPerfect, Excel, Power Point, Microsoft
Project, General
Understanding of 5ESS Switching, Data Fiber, and Power Systems. |
|
|||||||||||||||||
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|