From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Robert H. Bridges 17335 NE
18th Place Bellevue,
WA 98008 (425)
653-1527 Home (206)
915-1170 Cell Email: b1bridges@comcast.net POSITION
Construction Project Manager SKILLS AND ABILITIES MANAGEMENT: *
Coordinated Communications and Productivity with
Municipal Officials, A&E Firms, Property Owners, Contractors, Vendors and
Clients during the site acquisition, leasing, permitting, construction and
deployment of Aggressive telecommunication facility build outs in multiple
markets simultaneously. *
Maintained daily project status’s and reports;
Including Property Leasing, Permitting, Construction and Project Turnover to
Operations. *
Prepared Cost Analysis Estimates, Bill of
Materials, ordered materials. Tracked Purchase Orders and Vendor
Invoicing to ensure projects were completed with in their budget and closed
out in a timely fashion. *
Reviewed and redlined all Zoning and Construction
Drawings associated with the Permitting and construction of projects. *
Attended Zoning meetings, Design reviews and Historical
Landmark board reviews in support of proposed designs of telecommunication
projects. *
Monitored and Evaluated performances of Direct
Reports., Subcontractors and Vendors. Reviewed and approved employee Time
sheets, expense reports and paid time off. CONSTRUCTION: *
Over 15 years Conducting Environmental,
Structural, Electrical, Mechanical (HVAC), Fire Suppression, Grounding, DC
Power Plants and ISP/OSP infrastructure Inspections during the construction
and deployment of Self Supporting Towers, Monopoles, Rooftop, Water Tank,
PTP/PMP Microwave, Lucent 5ESS Switches and POP Telecommunication structures
and facilities, Large venue neutral host DAS networks. *
Coordinated and conducted Bid, Pre-Construction,
Punch and Final Inspection/Turn Over acceptance walks before, during and
after the construction and deployment of Telecommunication Facilities. *
Developed, Designed and Deployed Multiple tier 1
and 2 market Wireless Telecommunication Network facilities including Lucent
5ESS Switches, Hubs and Customer Sites for Winstar Communications and XO
Communications. *
Prepared and Submitted SEPA, Zoning and Building
Permit Applications to Municipalities and Historical Landmark boards in
accordance with Zoning Ordinances, Local and National Building and Electrical
codes and ANSI EIA/TIA standards. *
Designed, Developed and Managed the Installation
of ISP/OSP cabling infrastructures in accordance with BICSI Standards, ANSI
EIA/TIA Standards and the National Electric Code including: Horizontal
and Vertical Risers, MDF/IDF installations, Trenching, Directional Boring,
Manhole/Hand hole installation and Pole to Pole Aerial. DRAFTING /
DESIGN: *
Over 15 years working with CAD Software packages:
AutoCAD R12-2006, CADKEY, Microstation, Unigraphics, SOFTDESK /AUTODESK
MODULES and Visio 4, 5, 2000 and 2003. *
Drafted Maps and Environmental Project Layouts
based on Survey Data, U.S.G. Aerial Photo’s and Tax Maps. *
Modeled components and laid out piece part
drawings associated with the machining and fabrication of large power
generator assemblies. *
Designed and Drafted comprehensive site plans,
grading plans, architectural, structural and electrical plans associated with
the development and construction of Telecommunication projects for Omnipoint,
Sprint PCS, AT&T Wireless, Triton PCS, Nextel, Bell Atlantic Mobile,
Cingular Wireless, Verizon Wireless, Winstar Communications, XO
Communications , Clearwire Wireless Broadband, United States Navy, United
States Coast Guard and State Governments. EDUCATION
BICSI Membership, BICSI member since 2001. Civil
Engineering Technologies, Hudson Valley Community College, Troy, NY 1995-1996 Computer
Aided Drafting, Certificate, Hudson Valley Community College, Troy,
NY August 1995 Internship, Crawford
& Associates, Hudson, NY Summer 1995 WORK HISTORY At&t ASG
C&E DAS (Smartlink contract assignment) Project
Assignments: AT&T Large Venue DAS Builds Title:
Construction Manager (Pacific Northwest) Project Duration:
2/2014-Present 1.
Managed large venue DAS
neutral host new site builds, site development-deployment. 2.
Established cost estimates for site builds based
on the preparation of site specific scope of work for turnkey services, site
development-deployment. 3.
Established, managed and accountable for site
specific project schedules, budgets and reporting. 4.
Managed the design engineering first, second and
third tier vendors and venue management relationships throughout project
lifecycles. 5.
Prepared purchase order requisitions for vendor
required services and material procurement. 6.
Ordered utilities and coordinated on time service
installs based on build schedule requirements. 7.
Prepared site specific technical bid scope
packages. Conducted bid walks and supported Q&A with GC’s throughout bid
cycle 8.
Performed bid analysis and bid awards. 9.
Managed very aggressive site specific builds
ensuring budgets, schedules, specifications and QA expectations were
achieved. 10.
Managed DAS Integrator and DAS Commissioning
agents during all phases of DAS network Integration and Commissioning. 11.
Reviewed site specific vendor supplied OEM
manuals and as-built redlines for completeness. 12.
Prepared comprehensive closeout documentation
packages for each site build. 13.
Conducted operational site acceptance walks with
network operations management and venue management.. 14.
Ensured timely billing and closeout requirements
were compliant with contract guidelines. Nexius Project
Assignment: NextNav-Seattle Title:
Construction Project Manager Project Duration:
6/2013-12/2013 Responsibilities: Managed the site AZP vendor and
General Contractors during the site development phase and build out of a new
intercity Wireless LBS network for Site Candidates throughout the Metro
Seattle area. 1.
Managed leasing, zoning and permitting
productivity of AZP vendor. 2.
Conducted site assessments to validate site
specific candidates. This included assessments for
feasibility/constructability, tower structural analysis, utilities, zoning
and permitting, regulatory compliance and leasing of existing network
augmentations, collocation and new network builds. 3.
Established site specific project schedules throughout
project/program lifecycle. 4.
Managed the design engineering, AZP and GC vendors
through each project lifecycle. 5.
Conducted bid walks and bid awards per contract
requirements. 6.
Ordered materials and tracked shipments in
concert with build schedule. 7.
Created MOPS and SOWS for each site build
included NTP packages when applicable. 8.
Managed site specific builds ensuring
specifications costs, schedule and QA expectations were achieved. 9.
Prepared comprehensive closeout documentation
packages for each site build within time frame expectations. 10.
Ensured timely billing and closeout requirements
were compliant with contract guidelines. Ericsson-(Clearwire
Contract Assignment) Project Assignment:
NL2C Network Modernization Title:
Construction Manager II Project Duration:
9/2012-4/2013 Responsibilities: Managed the site AZP vendor and
General Contractors during the build out and augmentations of 86 Site
Candidates throughout the Metro Seattle area. 1.
Managed leasing, zoning and permitting
productivity of AZP vendor. 2.
Conducted site assessments to validate site
specific candidates. This included assessments for
feasibility/constructability, tower structural analysis, utilities, zoning
and permitting, regulatory compliance and leasing of existing network
augmentations, collocation and new network builds. 3.
Established site specific project schedules. 4.
Managed the design engineering, AZP and GC vendors
through each project lifecycle. 5.
Conducted bid walks and bid awards per contract
requirements. 6.
Ordered materials and tracked shipments in
concert with build schedule. 7.
Created MOPS and SOWS for each site build
included NTP packages when applicable. 8.
Managed site specific builds ensuring
specifications and QA expectations were achieved. 9.
Prepared comprehensive closeout documentation
packages for each site build. 11.
Ensured timely billing and closeout requirements
were compliant with contract guidelines. Black and Veatch
(Contract Assignment) Project
Assignment: AT&T LTE / Network Modernization Title:
Construction Manager Project Duration:
6/2012-9/2012 Responsibilities: Managed the construction of
fast paced inner city AT&T Ethernet OSP builds and LTE site construction for
4G LTE launch in multiple markets in the Mid West Region. 1.
Managed site specific builds ensuring engineering
specifications and QA expectations were achieved by vendors. 2.
Monitored onsite work activities ensuring
compliance with safety standards were being met. 3.
Prepared comprehensive closeout documentation
packages for each site build. 4.
Ensured timely billing and closeout requirements
were compliant with contract guidelines. Fujitsu Network
Communications (FNC) (Contract Assignment) Project
Assignment: CenturyLink FAI Project Title: Market
Project Manager (Pacific Northwest). Project Duration:
8/2011-3/2012 Responsibilities: Developed, Engineered and
Constructed ISP fiber backhaul CORE infrastructures to accommodate additional
Cell Carrier optical transport requirements for 4G LTE launches. 1.Managed day to day operations for FNC and acted
as the single point of contact for the Pacific Northwest region. 2.Conducted
site surveys of CenturyLink central office facilities to determine site
specific scope of work, BOM’s. This included assessments for
feasibility/constructability of existing fiber optics transport equipment,
space for new Fujitsu Node installations. 3.Evaluated primary power requirements and
secondary DC power plant solutions for site specific design requirements. 4.Prepared
detailed site specific assessment documentation, field measurements and
sketches utilized to develop site specific designs and BOM’s for ISP
installations. 5.Managed RFQ’s and site specific material orders
per approved BOM’s and DC power plant requirements. 6.Established site specific project schedules. 7.Participated in Lessons Learned and Process
improvement both internally and with the customer. 8.Established
site specific MOP’s for fiber prequalification services, Power Cutovers,
circuit migration cutovers and FNC equipment Test and turn up. 9.Managed the design engineering, install vendors
and Test and Turn up crews through each project lifecycle 10. Managed site specific builds ensuring
specifications and QA expectations were achieved. 11. Prepared comprehensive closeout documentation
packages for each site build. 12. Ensured timely billing and closeout
requirements were compliant with contract guidelines. General Dynamics
Information Technology Project
Assignments: Rescue 21 Project Title: Sr.
Project Manager (Pacific Northwest) Project Duration:
4/2006-5/2011 Turn key Tier 1
service provider for a new Search and Rescue network for the USCG. Responsibilities: Developed Engineered,
Constructed and Deployed Remote Fixed Facilities (6) USCG sectors providing
public safety RF coverage to major coastal waterways WA, OR and CA. 1.
Conducted site surveys to validate site
candidates. Site surveys included assessments for
feasibility/constructability, tower structural analysis, utilities, zoning
and permitting, regulatory compliance and leasing of collocation and new tower
builds. 2.
Established cost estimates for site builds based
on the preparation of site specific scope of work for turnkey services, site
development-deployment. 3.
Established, managed and accountable for site
specific project schedules. 4.
Managed the design engineering, 1st and 2nd tier
vendors Site Acquisition, Zoning & Permitting, GC’s as well as direct
reports through each project lifecycle. 5.
Prepared purchase order requisitions for vendor
required services and material procurement. 6.
Ordered utilities and coordinated on time service
installs based on build schedule requirements. 7.
Conducted bid walks and bid awards per FAR
requirements. 8.
Participated in Lessons Learned and Process
improvement both internally and with the customer. 9.
Managed site specific builds ensuring
specifications and QA expectations were achieved. 10.
Prepared comprehensive closeout documentation
packages for each site build. 11.
Evaluated subcontractor performances on a
quarterly basis. 12.
Ensured timely billing and closeout requirements
were compliant with contract guidelines. Clearwire
Wireless Broadband-6/2005-4/2006 Project
Assignment: Tier 1 Build Out Seattle Market Title: Lead
Construction Manager Project Duration:
6/2005-4/2006 Startup Wireless
Broadband Provider attempting their first tier 1 build out. Responsibilities: Managed the site development
and Tier 1 build out of 264 Site Candidates throughout the Metro Seattle
area. 1.Conducted
site assessments to validate site specific candidates. This included
assessments for feasibility/constructability, tower structural analysis,
utilities, zoning and permitting, regulatory compliance and leasing of
collocation, new tower builds and rooftops. 2.Established site specific project schedules. 3.Managed the design engineering, vendors through
each project lifecycle 4.Ordered utilities and coordinated on time
service installs based on build schedule requirements. 5.Conducted bid walks and bid awards per contract
requirements. 6.Managed site specific builds ensuring
specifications and QA expectations were achieved. 7.Prepared comprehensive closeout documentation
packages for each site build. 8.Ensured timely billing and closeout
requirements were compliant with contract guidelines. Volt Telecom
Group/GDNS QSP-9/2002-6/2005 Project
Assignment: Navy Marine Corp Intranet/National Title:
Engineering Supervisor Project Duration:
9/2002-6/2005 Responsibilities: Developed, Engineered,
Constructed ISP and OSP infrastructure migrating and integrating remote
contingencies of the US Navy and US Marine Corp onto a single gigabit
Ethernet network nationally. 1.Conducted
site assessments of Government Managed Facilities and Military Installations
to validate site specific candidates. This included assessments for
feasibility/constructability, user locations (Classified/Non-Classified),
existing fiber optics/copper, space requirements for new interior network
MDF’s and IDF’s per BICSI Standards. 2.Evaluated primary power requirements and secondary
DC power plant solutions for site specific design requirements. 3.Prepared
detailed site specific assessment documentation, field measurements and
sketches utilized to develop site specific designs and BOM’s for ISP and OSP
installations. 4.Managed RFQ’s and site specific material orders
per approved BOM’s and DC power plant requirements. 5.Established site specific project schedules. 6.Managed the design engineering, vendors and
direct reports through each project lifecycle 7.Managed site specific builds ensuring
specifications and QA expectations were achieved. 8.Prepared comprehensive closeout documentation
packages for each site build. 9.Ensured timely billing and closeout
requirements were compliant with contract guidelines. XO
Communication-9/2001-6/2002 Project
Assignment: Pacific Northwest Region Title: Fixed
Wireless Engineer Project Duration:
9/2002-6/2005 Responsibilities: Developed, Engineered,
Constructed and Deployed 28 GHz Fixed Microwave networks to supplement market
fiber optic network customer builds. Customer base included commercial
realty, government facilities and healthcare facilities. 1.Performed
site survey evaluations and IM studies to identify potential interferences of
customer facility RF and equipment in operation. 2.Evaluated primary power requirements and
secondary DC power plant solutions for site specific design requirements. 3.Prepared
detailed site specific assessment documentation, field measurements and
sketches utilized to develop site specific designs and BOM’s for ISP and OSP
installations. 4.Supported Sales and Marketing group with
technical support primarily with large account sales. 5.Managed RFQ’s and site specific material orders
per approved BOM’s and power requirements. 6.Established site specific project schedules. 7.Managed the design engineering, vendors and
direct reports through each project lifecycle 8.Managed site specific builds ensuring
specifications and QA expectations were achieved. 9.Managed communications with customers in
coordination with the installation/construction of the network equipment. 10. Prepared comprehensive closeout documentation
packages for each site build. 11. Ensured timely billing and closeout
requirements were compliant with contract guidelines. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|