From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Noel L. Mananghaya 1701
Nestledown Drive, Allen TX 75002 31-20 85th
Street East Elmhurst NY 11370 noelmananghaya@yahoo.com
Objective: Gain more rewarding career using my knowledge and
experience in mobile communications and transmission equipment. Specialization:
Project management for/and installation, commissioning, integration,
operation and maintenance of different types of Nokia equipment 2G, 3G and
Node B, as well as Ericsson 2G, 3G and 4G equipment, microwave transmission
equipment PDH and SDH; RAN Comm / NIC support for integrating or migrating
sites Samsung 3G and 4G LTE. Supervision for the operation, maintenance and
of Nokia BSC and MSC. Optimization of 2G and 3G network. Outside plant design
and installation both copper and fiber optic cable thru aerial, buried and
underground means. Project management for Microwave Radio Installation and
for Subscriber Line Installation including activation, operation and
maintenance. Education: ·
Bachelor of Science in Electronics and
Communications Engineering - June 1984 to Nov 1988 at Mapua Institute of
Technology – Intramuros, Manila, Philippines. ·
On-going Cisco CCNA at Collin College
Frisco Texas. – Oct 2013 to present Work
experiences: SAMSUNG RAN
Commissioning Engr. (Frisco Texas) for SPRINT Project thru
Worldlink-Samsung May 15 2013 to present. · Create the 3g CDMA and 4G LTE sites and communicate with Field
Technicians on site and LCC to gain connectivity. · Troubleshoot for the connectivity and clear the alarms in coordination
with Field Technicians and LCC. · Commission the sites remotely. Upgrade the software and create the
neighbors for handover. · Coordinate and troubleshoot with Field technicians any hardware or
installation issues causing alarms. · Conduct (ATP) Acceptance Test Procedure with Field technician on site.
Perform site audit. · Provide ATP and Audit report thru Remedy Software. · Support the RF drive test. · Run some bath files for changing some parameters before making the
site commercially on air. · Accept calls from the bridge to support Field technicians on site and
RF for drive testing. · Make the 4G LTE discoverable before making it commercially available. · Prepare report at the end of the shift and handoff to the next shift
if necessary. NSN BTS
Engineer for NSN (Houston) for TMO Modernization Project thru Awat-Zeva-
Tapfin-NSN, Sept 10, 2012 to May 12, 2013 · Commissioning and cut-over of 2G Ultrasite BTS to 2G Flexi BTS. · Commissioning, integration, call testing and documentation of 2G/3G
Flexi BTS and LTE with different Site Configurations. · Access the site equipment remotely both 2G and 3G for
checking/verification, troubleshooting and clearing of alarms. · Access site equipment 2G and 3G thru BSC and RNC for monitoring,
verification, troubleshooting and clearing of alarms. · Support the Commissioning Engr of General Contractor for
commissioning, integration and troubleshooting of NSN project either on site
or remotely. · Perform advanced troubleshooting, able to follow NSN NED documentation
and independently resolve project issues. · Monitor and investigate the missing materials of General Contractors. · Coordinate actions and investigation of technical issues between
Customer, regional management, tier2/tier3/ Product Line support teams. · Provide support to customers for O&M of RAN Network elements. · Provide documentation for the acceptance of equipment and services. RBS Tester/
Field Engineer for ERICSSON – TMO Modernization Project thru AWAT-PARSONS –June 29 to Sept 9 2012 (Maryland/DC Market) · Site assessment and materials inventory of delivered cabinet RBS 6102. · Remove LMU and external alarm connected to existing GSM cabinet · Once existing GSM and WCDMA cabinet was replaced by a new cabinet RBS
6102 by other group, install DUG, DUW and DUL (2G/3G/LTE) including all
cablings. · Load the basic and upgrade package for DUG and DUW. LTE to follow. · Commission, integrate and do call testing for both 2G and 3G. · If needed, troubleshoot and clear the alarms for the two technologies. · Provide report for the new integrated technologies. RBS Tester/
Field Engineer for ERICSSON – ATT Expansion Project thru PARSONS Oklahoma/Arkansas -
01 Mar 2012 to 27 Jun 2012 Illinois/
Indiana - 06 Aug
2011 to 06 Jan 2012 Northern
California - 30 May 2011 to 05 Aug 2011 · Installation and configuration for additional carriers (2nd carrier,
3rd carrier and 4th carrier). · Installation and commissioning of RRUW. · Installation, commissioning, integration and call testing of 3G RBS
cabinet 3106, RBS 3206, RBS 3418, RBS 3518. · Assess the site/SOW requirements. Visit the sites with all necessary
materials and tools to perform the activity. · Do the necessary coordination for the site access before and after
entering the site. Take photos and screenshots before and after the activity.
· Job includes installation and termination of power cables, cosite cables,
jumper cables; fabrication, installation and swinging of jumper cable and lot
of coordination · Perform the activity based on SOW and MOP. · Provide the daily field report thru email after performing the job. RBS Team Lead
at Indiana While under
Chicago, IL Market, 4 installers and 6 integrators were sent in Indiana to
support Parsons sub-contractor for Super bowl Project. I was given the chance
to be the RBS Team Leader of that deployment for 6 weeks from Nov 21 to Dec
31. · Attend meeting with the client regarding the priority for the work to
be done. · Ensure the timely delivery of install and/or integrate equipment. · Prepare materials and daily schedule of work · Closely monitor the task of every team for their daily accomplishment · Closely coordinate with the client for any issue or that may affect
the timely completion of work Project
Manager – Responsible for the
project management and end-to-end implementation until project completion -
SDH Microwave Radio Installation with 44 new hops and 62 upgrade in ring
configuration: Since July 01, 2008 to Feb 28, 2009 Ceragon Network
(Philippines), Inc. · Attend to project meetings both internally and externally. · Make sure the on time delivery of project commitment. · Manage subcontractors both for Telecom and Civil Works. · Evaluate project Site Survey Reports (SSR) made by subcontractors. · Present/Make SSR’s plans for the project and BOM per site. · Supervise/Inspect the implementation both for the Civil and Telecom
works · Progress monitoring of accomplishment with field engineers and
subcontractors. · Provide daily and weekly progress reports for the clients. · Preparation prior to actual implementation of the network plan. · Schedule the sub-contractor for the actual implementation of the
cut-over/ installation · Conduct PAT Supervisor/Sr.
Supervisor – Assigned in different sections Smart Mobile Network Facilities: June 1999 to
March 31, 2008, Smart Communications, Inc. – Philippines Optimization · Monitor the KPIs report on network per Node B and per RNC level. · Analyze the KPIs and provide recommendation in order to attain or
maintain the accepted values of KPIs. · Provide plans for Node B re-homing showing the RNC boundaries. · Dimension 3G RAN network according to capacity, coverage and quality
in terms of number of channel element, Node-Bs and RNCs. NOC –OSS
(Nokia Equipment) ·
Provide support for GSM /UMTS integration during
BSS deployment via creation and performing configuration scripts in BSC from
integration center via remote either BSS MML commands or Net Act tools. ·
Implements BTS Rehoming from one BSC to another
BSC ·
Get the prelogs and post logs after the expansion
and/or cut-over. ·
Performs Configuration and Fault Management of
GSM Network ·
Monitor and clear/troubleshoot the alarm of the
cell sites. Access the site remotely and if needed ask support from field
engineer for onsite troubleshooting. ·
Works with Nokia's NMS2000/ OSS4.0 for the remote
O&M of GSM Network ·
Performs TRX Expansions for the BTS sites. Implementation,
Operation and Maintenance Nokia
Supreme and Flexi Node B (WCDMA) ·
Attend to project meetings both internally and
externally. ·
Make sure the on time delivery of project
commitment. ·
Monitor the status and readiness of each site for
the schedule of installation and integration. ·
Manage subcontractors both for Telecom and Civil
Works. ·
Support for the site acquisition, site
development and actual implementation of rollout installation. ·
Performed installation, commissioning, testing
and integration of both Nokia Supreme and Flexi node B. Involved in HSDPA
activation of Nokia Supreme with 3 X 2 Mbps E1. ·
Conducts test call on the radio and drive test to
make sure that the hand-over process is successful as well as ensuring the
quality and reliability of the equipment. ·
Conduct Site Inspection, Quality and Audit. ·
Perform the software upgrading of Nokia Supreme
Node B and Flexi Node B. ·
Performs expansion or channel addition depending
on the required new configuration., ·
Perform preventive and corrective maintenance of
Nokia Supreme Node B and Flexi Node B including its transmission by checking
the hardware unit and clearing the major and critical alarm (from radio part
to antenna part). ·
Responsible for the operation and maintenance in
a per AOR basis. ·
Responsible for the immediate restoration of cell
site operation, scheduled 24 hours "on call duty" on attending
network outages due to hardware problems and transmission fault. ·
Troubleshoot/repair radio base station. Isolation
involves radio part, combiner part, Antenna part, radio interface boards,
transmission links, Base
Transceiver Station (BTS) and Base Station Controller (BSC) of GSM Cellular
System from Nokia. ·
Installation, commissioning, testing, integration
and operation & maintenance of both macro (Ultrasite and Intratalk
family) and micro (metrosite, connect 10 and insite) types of BTS from Nokia
product. ·
Cut-over and expansion due to congestion and
rollout. ·
Troubleshooting and restoration of outages from
single transceiver to multiple BTS. ·
Drive test, checking of parameters and
optimization for better service of Voice, SMS, and other products of Smart. ·
Assigned in the NOC for monitoring of the network
and handling the data translation by loading the script remotely of different
network element. ·
Performed commissioning of Nokia BSC2i with 512
TRX capacities, BSC3i with 660 TRX capacities, and BSC3i with 1000 TRX
capacities. ·
Creation and deletion at BSC for additional SL,
transceiver, BTS, Ater, ET and other modules of BSC. ·
Conduct expansion of the following in Nokia
BSC2i/3i: BCSU, ET, ATER and SL. ·
As required, implement software upgrade for any
change deliveries. ·
Monitoring and clearing of alarms at BSC.
Performed quarterly health checks for computer units of BSCs. ·
Analyze diagnostic report and conduct correction
or replacement if there is a unit failure. Main Switching
System (MSCG-12/MSCG22) of GSM Cellular System from Nokia DX200 · Creation and testing of inter-office trunk from MSCG to Transit Switch
and from MSCG to another MSCG. · Creation and testing of charging link both pre-paid and post paid. · Monitoring of alarms of both service affecting and non-service
affecting. Handling necessary isolation and troubleshooting. · Monitoring of some parameters that might affect the service. · Conduct preventive and corrective maintenance. Transmission
equipment like Ericsson Minilink, line driver, DMC microwave radio, NERA SDH
and PDH, Ericsson Multiplexer, ECI mux and Ceragon. · Perform preventive and corrective maintenance of different
transmission equipment. · Clearing of alarm that might affect the reliability of the
transmission system. · Trouble shooting and restoration in case of outage. · Installation and commissioning of NOKIA (HDSL) modem for quick
transmission facilities via two (2) pairs of copper cable. · Provide rerouting and cross-connections of 2Mbps signal. · Perform cross-connection of E1 to provide link for Network Element
like RSS, BTS, BSC and Switch. Radio Base
Station of TACS from Ericsson · Conducts recommissioning of ETACS radio base station every quarter of
the year to optimize the operational efficiency. · Conduct preventive and corrective maintenance as well as trouble
shooting and restoration of outage. Support for
the project management in CS installation and CSMP (Cell Site Management
Program), which are done in a per area basis. Being Cluster Head, he was
responsible in the area of Tarlac and Nueva Ecija and Pangasinan. · Most of the Cellsite acquisition is done by his group. Coordinating
with landowner, permitting from Brgy and Sanguniang Bayan. · Pushing the contractor for the mobilization, preparation of civil
works, transmission readiness by microwave radio, copper & line driver or
fiber optic means. · Ensure that there will be no avoidable outage in relation to power,
ACU and other related causes where contractor is the main responsible. Supervisor –
Subscriber Line Installations, O & M of Fixed Lines: June 1998 to
June 1999, Smart Communications, Inc. – Philippines · Project management for the subscriber line installation including
operation and maintenance. · Handling at least 15 contractors responsible for the subscriber line
installations including the activation, operation and maintenance in the
entire North Luzon area (Regions 1, 2, 3 and CAR) of Smart Communications. · Ensure that the volumes of installations are met in agreed due time. · Ensure that the qualities of installation are in accordance with the
agreed standard specifications. · Contractors’ control and management are given priorities to ensure
that subscribers’ satisfactions are achieved. Senior
Engineer – Transmission Wired/OSP Engineering and Implementation /O&M:
Feb 1995 to June 1998, Smart Communications, Inc. – Philippines · Planning, design, cost estimate, implementation and maintenance of
fiber optic cable network installed for interconnection of different network
elements by buried, underground, and aerial means including its excavation,
duct-system and pole-lines respectively. · Coordination with other carriers and facilities as well as with
building owners and government agencies that will be involved in the design
and implementation of the project. · Manage the restoration of cut or damaged FOC whether ducted, buried or
aerially installed caused by natural disaster like typhoon or any incident
either accidentally or intentionally done by individual or group.
· Coordinate/ manage contractors both for Telecom and Civil Works
before, during, and after the installation (acceptance). Network / OSP Engineer – Saudi Telecom, MOPTT at
K. S. A. –: Nov. 1989 to Nov. 1994 Planning,
design, cost estimate and acceptance of outside plants related job in
telecommunication involving copper and fiber optic cable by means of aerial,
buried and underground solution in accordance to Saudi Telecom and MOPTT
specifications for primary, secondary and trunking networks. · Survey and prepare necessary plans and documents for the subscriber
lines installation thru buried cable. · Provide as-built-plan of the existing cables in the manholes and
prepare rehabilitation plan to accommodate the pending telephone applications
and the 5-year forecast demand. Alcatel Philippines, Inc. (Customer Service
Dept.) – PABX Technician : Jan, 1989 to Nov. 1989 · Maintain EPABX PC-TS2 switching equipment including the main
distribution frame and power supply used by the entire system of Manila
International Airport. Trainings and Seminar
NSN equipment
installation, commissioning and integration training. 2G/3G Sept 17-19 2012.
LTE Jan 30-Feb 1, 2013. ATT on-site
training for commissioning and integration. May 30 – June 8 2011 Effective
Management Using MS Office – European IT Service Center, Makati July 23-25,
2008 SDHTraining –
By Ceragon, Makati City, July 9-11, 2009 Nokia 3G
Systems Training, April 18-20, 2006, Mandarin Oriental, Makati, Phils. Power System –
Benning Product at Makati City, June 14, 2001 Radio Network
Optimization – Baguio City, May 17-18, 2001 SDH Training –
By Nokia at Makati City, October 24-26, 2000 Operation and
Maintenance of BTS and BSC- Nokia Product Bangkok, Thailand, September 11-15,
2000 Nokia GSM
Systems Training- Aug. 7-9, 2000, Makati City Cellular
Planning Principle, May 03-04, 2000 Fiber Optic
Cable Training by Ericsson at Hudiksbal, Sweden, Feb12-24, 1997 PDH and SDH
Transmission for Ericsson Product- Feb. 26-March 23, 1997 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
Tagalog |
Beginner |
|
|
|