From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
CAROLE HENDERSON 4517 Purnell Road Wake Forest, NC.
27587 919-841-3125 gymeaux57@yahoo.com SUMMARY: Manager of Engineering Dept. - Manager of
the FTTP project for Parsons, Inc. - OSP Engineer - Contract Consultant
- Technician - Computer Operator - Voice Controller. Began at entry level in
1977, after having Honorably served 4 years within the Telecommunications
field of the USN., working over the next 20+ years reaching management level
with an outstanding track record. Customer care and service. COMPUTER SKILLS Microsoft Office Suite, Verizon Software
Systems, Lotus Notes, Windows, other proprietary software applications
exclusive to the individual Companies and/or Vendors. WORK EXPERIENCE Millenium Automotive Group, Durham, NC Sales and Leasing Specialist 2011 – 2013 ·
Creating
and establishing rapport and trust between myself and the customer in
order to provide
a win/win solution; purchase of an automobile ranging in price from
$65,000.00 to
$15,000.00. ·
Certified
in the product line of Hyundai, Chrysler, Dodge, Jeep and Mazda, along with
the vast array
of pre-owned vehicles. ·
Skilled
in the negotiation phase of payments and pricing ·
Closing
and securing the deal. ·
Providing
stellar Customer “care” and service to each client. Sheetz, Inc., Raleigh, NC.
Shift Supervisor 2009 - 2011 Fortune 500 Company in Customer Convenience
- Retail Fuel and Food Customer Care and Service Verizon, Teays Valley, WV Contractor for Mountain, Ltd. 2007 - 2009 ·
Performed
site surveys for New builds to determine route, cable size, terrain
obstructions, rights of way issue(s), Customer interfacing, determine
existing plant, replacement of existing plant and/or the placement of new
plant. and future needs for both copper cable or fiber optic cable. ·
Engineered
Fiber Optic route(s) from the Central Office or an existing splice point
within the field, where a continued build could be achieved into a new
Subdivision, Mall, or a Business complex. ·
Researched
and Engineered designs for Verizon due to State relocations, inclement
weather, accidental mishaps, and emergency conditions such as flooding, snow
and ice, mudslides. ·
Interfaced
with Customers routinely to ensure their satisfaction, or if needing to
obtain Rights of Way via their property, as well as Officials with WVDOT. ·
Provided
accurate records, with the appropriate codes and symbols in order for the
drafter to complete the prints. ·
Resolved
all issues as they arose and prior to submission for permits. ·
Determined
the condition of the existing plant regarding a replacement, retire in place
or removal and stated same on the engineering prints. ·
Ensured
all pertinent records were updated and submitted to the appropriate staff and
departments. ·
Oversaw
the safe and correct completion of the job until handed over to the customer
or client. ·
Reason
for leaving: Verizon sold the regulated side of their business to Frontier
within 14 States and Verizon commenced “downsizing” within their own
businesses in each of those States. Duke Energy, Charlotte, NC Contractor for TekSystems 2005 - 2006 ·
Design
and coordinate OSP projects utilizing Fiberbase software
·
Design
and coordinate ISP projects ·
Maintain
the integrity of the Fiberbase database(s) with both ISP and OSP records and
prints provided by the Engineers ·
Attend
weekly status meetings with all departments assigned to the Project ·
Assist
the assigned Engineer within the field, as directed, needed or desired Parsons, Int’l., Elkridge, MD Wire Center Project Manager 2001 - 2005 ·
Responsible
for the staffing needs which compromised of: 40 surveyors, drafters and
engineers ·
Created
and monitored the Budget, reports, payroll and, personnel issues ·
CABLE:
Completed Site surveys, pole mapping, strand mapping and resolved any Rights
of Way issues. ·
Gathered,
Researched and engineered the Feeder Routes; identifying Residential,
Commercial, as well as future interests, such as new Subdivisions to benefit
Verizon. ·
Identified
the splicing of the copper cable(s) and created separate prints for the
splicers. ·
Provided
to the client the “red lines” and “as builts: for their permanent databases ·
Allocated
the “spare” copper wires to communities and businesses alike, for their
projected growth ·
Reviewed
and approved all prints, in their final version prior to submitting to the
client ·
Identified
all field deficiencies and noted on the designed prints, for the client ·
WIRELESS:
Identified, surveyed, planned and engineered the Fiber Optic backbone and feeder
route for the Fiber To The Prem (FTTP) project ·
All
phases utilizing Fiber Optic cable versus copper cable were completed with
Client satisfaction. ·
Attending
regular meeting with the Client to determine needs, changes to their practices
and procedures and inserting them into our organization. ·
Developed
the standards for the OSP Engineers within Parsons Verizon Telecom, Sterling, VA., Valhalla,
NY and Bowie, MD.
Contractor for RJE Telecom Team Leader
·
Researched
and identified all permitting, Public Utility Easements, (PUE) and Plats
pertaining to the location of work. ·
Performed
the Survey ·
Identified
the route and most efficient path ·
Created
the 1st draft of the engineering prints ·
Returned
to site to insure draft version was 100% correct, made any changes as
necessary and submitted to drafters for the AutoCAD design. ·
Met and
maintained the quota as defined by the client ·
Oversaw
both the work and the product of my subordinates Progress Telecom, subsidiary of Progress
Energy, FL and NC Engineering Specialist IV 2000 – 2002 ·
Researched
and completed Feasibility studies for potential clients and fiber builds ·
Researched
and designed Road and relocation projects determined by the State ·
Designed
Aerial and underground builds – fiber only ·
Obtained
the necessary Franchises and permits within the State and for a specific
project ·
Inspected
ongoing and completed projects to insure the compliance of all Company,
Local, State and Federal laws ·
Area of
responsibility: Miami, FL to NYC, NY ·
Assisted
in the creation of the Engineering standards for the Department ·
Created
and developed Scope of Work, (SOW) documents and materials for assigned
projects ·
Establishing
the demarcation point within a building or residence and dropping the service
to that point, Engineering, as necessary the demarcation point, I.e.,
ladders, backboards and the like ·
Worked
independently and remotely
ACSI NT, Subsidiary of eSpire
Communications, Sterling, VA. Manager of Engineering - Florida 1999 – 2000 ·
Interviewed
and hired staff members ·
Researched
and performed site surveys ·
Addressed
all Franchising and permitting issues before each adjudicating authority ·
Developed
Bids, Scope of Work, and awarded the bids to the vendor awarded the contract ·
Resolved
all engineering, staffing or, drafting concerns ·
Interacted
with various vendors and awarded projects if workload might have jeopardized
a due date of a project ·
Attended
scheduled Dept. head meetings and provided accurate and correct information
to insure upper management was kept informed and current. ·
Interfaced
and worked with officials, at all levels of the Government to insure
compliance of Local, State and Federal laws. Also to insure all partied were
in compliance with all safety rules and regulations. ·
Providing
a complete diverse path for the backbone ·
Once
the project was completed, provided the necessary as-builts and redlines in
order to update the database and maintain the integrity thereof
Frontier Corp. fka Rochester Telephone,
Rochester, NY Contractor for Mountain Ltd., Yarmouth, ME 1997 – 1999 ·
Responsible
for 5 Serving Wire Centers, (SWO) and their copper or fiber needs; from DS0
to DS3, trunking, sonet and local services. ·
Engineer
of choice to complete the engineering for the Wide Area Network, WAN of
the Rochester Public School System comprising of 57 schools. ·
Researching
and engineering of all road and relocation projects, as assigned by the NYDOT ·
Satisfying
both copper and fiber needs for the five SWO, company and customers alike ·
Ordering
all materials regardless of the size of the project, poles, cable, personnel
hours, and depending upon the amount of monies needed to complete, acquiring
the necessary permission from Upper Management to commence the project ·
Providing
the redlines and as-builts to the clerks for input, in order to maintain the
integrity of the database ·
Overseeing
the various stages of the project through completion and in accordance with
all Company, State and Local laws for compliance and safety Previous experience includes: UTC/Sprint, Carlisle, PA Contractor for TekSystems, fka Aerotek 1995 – 1997
Special Circuits Maintenance and Repair
Specialist MCI WorldCom, Vienna, VA Contractor for Butler Tech. 1994 – 1995
Special circuits and high focus accounts Cable and Wireless, Vienna, VA C&W, Vienna, VA Circuit Design Engineer for CITIBANK,
C&W’s largest account 1993 – 1994 The Washington Times, Washington, DC Computer Operator 1991 – 1993 Contel ASC, Rockville, MD Circuit Design Engineer 1988 –
1989
AT&T/Bell System, Washington, DC Central Office Technician 1981 – 1988 SPCommunications, aka Sprint, NYC and
Cooksville, MD Circuit Design Engineer 1979 – 1981 NASA Goddard Flight Center, Greenbelt, MD Voice Controller 1977 – 1979 Military:
USN, USNR and USAR |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|