2010-2012 Zayo Bandwidth (FTT) Plymouth, MN Construction
Manager · Meeting with Contractors and internal Customer
personnel to define project scope and set accountability across the FTT
project team · Meeting with contractors and internal Customer
personnel to establish project timelines for the entire project scope · Manage contractors to ensure everyone is meeting
deliverables from a construction prospective · Work with Internal personnel to understand any and
all fiber splice points and fiber assignments on existing Customer network · Manage the Construction Company selected by Customer
to ensure complete project management from the scoping of a project to the
close out of a project · Drive the review of Buildings/Site Locations for
Cabinet/Electronic Equipment Installation, throughout the market to support
Customer Telecommunications Services at such sites with assistance of vendors
and local personnel, to ensure site acquisition success which would require
site designs for Landlord/Customer approvals of such electronic equipment
installation. Typical sites can vary from the following: 1.
Cell tower compounds 2.
Commercial, Industrial or Residential
Buildings 3.
Collocation providers 4.
Hospitals, Universities, etc, 5.
Private Property Owners · Manage the daily task/schedule tracker to ensure
Contractors are meeting commitment dates as well as working with them to
forecast out the entire project from a time line prospective · Update the daily schedule tracker as dates move
forward or pull in to ensure all team members are aware of the schedule
change · Oversee OSP construction including validating
contractor completeness on any and all segments of the project to ensure
project sections are complete and accurately reflected on all contractor
invoices. · Manage an RFP process for any additional contractor
work required outside current contractor scope of work · Managing material purchasing and inventory · Manage and maintaining all site surveys,
Construction Documentation, Permits, Close out packages and as-builds’ for
each and every site being constructed and ensuring that these files are
supplied to the Customer facility management team. · Preparing weekly reports detailing activity to
management in the form of a summarized tracker 2007-2010 Madcom
LLC, Buffalo, NY
Construction Field Manager · Manage OSP daily construction schedule and validate
that all segments are complete and timelines are met to ensure our commitment
to the customer · Meet with project team and customer to establish
timelines for construction completion and deliverables. · Manage BOM and track and coordinate material
delivery · Provide oversight of construction execution on all
assigned construction projects to field personnel and subcontractors in a
timely manner · Provide daily reports of project status and
performance data as required to management · Manage and maintain all site surveys, Construction
documentation, Permits, Close out packages and as-builds for each and every
site being constructed · Communicate and distribute contract documents,
project information, and any clarifications to field personnel. · Drive ISP/OSP construction to meet our contractual
obligation to the customer and deliver site turn ups 2004-2007 Lexent Metro Connect
Inc NYC Construction Field Manager ·
Manage a team of Field Engineers for a fiber network of underground
and aerial fiber placement for a Metro PCS DAS build (560 Nodes) ·
Report status of the construction on aerial and underground
fiber placement to Project Management ·
Submit fiber staking sheets and all field documentation to the CAD
department for fiber placement construction drawings ·
Proof and Redline all fiber placement construction drawings and submit
to CAD department for final asbuilds ·
Meet with crews and inspectors at the various construction locations
to resolve environmental issues to ensure project completion ·
Provide fiber docs and support to splicers to assist with continuity
troubleshooting issues ·
Submit permits and pole applications to the proper municipality ·
Meet with field personnel to ensure the installation of cables,
electronic equipment, and grounding requirements are executed properly ·
Conduct field inspections of OSP construction and restoration ·
Manage construction progress and detailed activity on a daily tracker ·
Meet with Contractors, Utility Reps (Pole Owners) and Internal
Customer Personnel for the approval of fiber placement and DAS equipment on utility
poles
2003-2005
BN Systems Inc Albany, NY ·
Installed PBX Systems and Key Telephone Systems ·
Cable drops for voice and data, fiber optic cabling ·
Installed ITT/ITRACS structure cabling solution ·
Cable Trays, Ladder Racks, inner ducts ·
Low voltage camera security systems
·
Manage installation of power, lighting, transformer and Energy
Management Systems ·
Installed Motor Control Center for pumps, motors and distribution ·
Installed Service equipment, distribution, bus duct, Dimming System ·
Troubleshoot and repaired Control circuits (DC/AC) ·
Installed Access control systems, Intercoms and security ·
Installed and buried conduit from 1” to 4” (Schedule 40/ Rigid
Conduit) Education William E. Grady Vocational H.S. NYSA Electrician Apprenticeship
Program
Electrician Journeyman License US Army (Support/Communications) Bronx
Community College
|
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|