From: route@monster.com
Sent: Wednesday, September 16, 2015 1:58 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Frank
A. Bongiorno 16
Hillcrest Ave Albany,
NY 12203 518-459-1689
Fbng1689@gmail.com My name is Frank Bongiorno and I have worked in an
Engineering-Technical-Consultant role for over a dozen years. My experience
has been in both the Public and Private sector under many roles. I have been involved in the design, contract
administration, construction, and supervision of the following: Co-Gen
Power Plants, Telecom Systems, and the Certification-roll out of over 12,000
Electronic Voting Systems deployed in New York State. I have engineered, permitted, and supervised the
construction of several POP’s (Point of Presence), lateral fiber build-outs
to several high profile buildings, and 250 KW Caterpillar Backup Generator
installations in Boston MA, Hartford CT, Stamford CT, and Albany NY. In addition I was instrumental in the engineering, build-out,
and virtual modeling of a major telecom network consisting of 97 collocation
facilities located throughout several states including MA, NY, PA, WA, OR,
and ME using a program called
“TBS”.
I have supervised and oversaw the construction of
several Re-generation Buildings along the NYS thruway for a long haul fiber
build-out. Served as a team leader for NYSTEC (Consulting
Company) and worked on the VSA RF project collecting and compiling data into
a Microsoft Access Database used to Engineer and Construct a State Wide
Wireless Network build-out. Finally I have worked on several Natural
Gas Fired Combined Cycle Co-generation Facilities in various office and field
engineering capacities.
Relevant
Technical/Management Duties: NY State Board of Elections (Albany NY) – Certified the State Wide deployment of over
12,000 Electronic Voting
Machines.
I was the interface between the Voting Equipment
Vendors and New York State Board of Elections. I conducted test cases of EMS (Election Management
Software) upgrades, including functional testing. Provide Software and Hardware training to County
Election personnel by creating my own easy to use training manuals. Upgraded firmware and performed Hash Checking on the
firmware of the Electronic Voting Machines. Trained and supervised temporary employees with
functional testing of Voting machines. I provided Test Deck training sessions to County
Board Election personnel. I also conducted Acceptance Testing of voting
machines at many County Board of Elections. Sent out firmware upgrades of voting systems to
County Board of Elections throughout New York I maintained documentation on SFT and FTP sites and
disseminating documentation to County Boards. I was the lead for documentation and vendor
applications. I reviewed the applications submitted by vendors, documentation
submitted by vendors, and used “WASP” an asset tracking system database. Field Engineer for NYSTEC (Rome and Albany NY) – Statewide Wireless Network (VSA Project) visual site
assessment
project.
I conducted field assessments of both prospective
and existing RF tower infrastructure to be used for a state wide wireless
network. I was responsible for scheduling of site visits and completing
assessment reports. Initiated and held kick-off meetings with county
agencies prior to conducting field assessments. I had to mine the FCC database for prospective RF
tower sites, collected field data on sites that were surveyed and prepared
videos along with site information collected. I completed applications to
obtain FCC licenses. Compiled and then had to input data into Microsoft
Access Data base used in assisting the build out of a state wide wireless
network (SWWN). Field Engineer J Fletcher Creamer & Son
(Bethlehem NY) – General Contractor
on the Phase 1 construction of a Multi-million dollar Civil Subcontract for
construction of various concrete slabs and underground utilities of a
350-Megawatt Natural Gas Fired Combined Cycle power-plant for (PSEG) Submitted weekly, monthly progress reports and
tracked change order payments for Electrical, Mechanical, and Civil
activities. Administered subcontracts in these disciplines. Received, logged, and transmitted subcontract
documents (Plans, Spec’s, and RFI’s) to ensure current revisions were used in
the field. I provided field engineering support to our staff. Communicated with both PSEG and Sergeant &Lundy
(A&E Firm) on construction issues via RFI’s within a software package
called “Project Talk”. I designed shop drawings and sent out RFP’s for
anchor bolt embed templates, structural steel frames, steel grating, and
pre-cast concrete manholes for storm/sewer piping. Equipment Engineer Fairpoint Communications (E
Greenbush NY)-Equipment Engineer
then promoted to Construction Manger for a competitive local exchange carrier
(CLEC). Designed, supervised, and performed quality-assurance acceptance of
various collocation facilities in several States.
Designed, supervised construction, and accepted
collocation facilities in several states (NY, MA, ME, WA, PA, and OR).
Obtained building entrance permits into ILEC and RBOC central offices. Designed and virtually modeled equipment used
throughout the Fairpoint network into a Data Base called “TBS” (Telecom
Business Solutions Software) ahead of schedule and was awarded a bonus. Also designed T1, T3 and OC interoffice circuits
into “TBS” and issued DLR’s design layout requests Cut PO‘s, administered subcontracts, issued weekly
and monthly progress reports, trained personnel, reviewed vendor
documentation packages from Lucent and Nortel Networks for correct
specifications. I used an OTDR to test db fiber losses in build-out
projects (including an OC 48 Hot Cut). Inspected sites in several states to ensure
Fairpoint quality standards were met. Designed & Engineered the layout of Equipment
racks inside collo cages including DC power, fuse assignments,
DSX cross-connects, grounding, shelf positioning, card population, and back
plane cross-connects.
Performed audit of entire network (97 collo’s),
including equipment, circuit ID’s, cross-connects, RBOC CFA’s (Circuit
Facility Assignments) & Power Distribution for collocation cages. OSP Engineer for Telergy (Albany NY) - OSP engineer for a small CLEC, involved with the
design and construction of a long haul diverse, redundant fiber optic
network. Submitted design work to NYSDOT for approval and permits. ·
Designed and engineered aerial and underground fiber
construction builds for a diverse long haul fiber optic network build-out. ·
Filed for and obtained permits from power and telco
utilities for conduit/inner-duct placement and aerial pole attachments.
·
Designed and obtained approval of a major fiber lateral
build out from I87 to I787 via alternate route 7. Submitted design to NYSDOT
Engineering Department for approval and obtained necessary authorization. OSP/ISP Engineer MFSNT (MASS, CT, & NY) - Designed, permitted, supervised construction,
various (Point of Presence) POP’s and lateral fiber optic build-outs in MA
& CT for a Competitive Local Exchange Carrier (CLEC). Issued and
administered subcontracts up to $25,000 with-out supervisor approval ·
I tracked contractor progress via an accrual system before
authorizing payment. Permitted, managed, tested and installed (2) two
Caterpillar back-up generators in CT (Stamford & Hartford). ·
Supervised the construction of several re-gen buildings
used to house various telecom tenants on a multi-million dollar long haul
fiber project on the NYS thruway. Provided as-built drawings, permitted
-coordinated utilities fed into buildings (electrical, phone, and fiber)
along with placement of concrete transformer vaults. I checked db losses at
fiber patch panels with an OTDR and Power meter. Prior work experience includes being employed as an
office engineer on (2) additional Natural Gas Fired Combine Cycle Power
plants. One as a Mechanical Engineer for LG&E power
systems (The GC) on 79MW combined cycle co-gen plant in Rensselaer NY. The
mechanical subcontract was my responsibility including administration, RFI’s,
and providing sub with up to date drawings. I performed all the preliminary mechanical piping
take-off totaling $5 million and tracked job progress. Authorized payment of
field change orders submitted by mechanical contractor. The other as a Structural Steel Field Engineer on a
57MW Natural gas fired combined cycle power plant project in Ilion NY for
Zurn-Nepco. I worked under Lance Hardesty “Project Engineer” and Bill
Wilkerson the “Project Manager”. I kept a Change Order Log of discrepancies
between fabricated steel and design drawing requirements. Performed pick
diagrams for HRSG modules. I was responsible for field engineering and
structural steel construction which included the power house building.
Performed all the QA & QC of structural steel used on the project. I staged the structural steel columns and beams in
an orderly fashion. I had to verify that beams and columns had proper
placement (elevation & configuration) of various bolt patterns, sizes,
and beam clips in accordance with engineering plans and specifications. Also
sketched handrail designs, embed plates, and various frames as needed for
fabrication and installation. Education: University @ Buffalo graduated with honors B.S.M.E Honors: Member of
Pi Tau Sigma (Mechanical Engineering Honor Fraternity) National
Deans List Certifications/Classes: ADTRAN
Total Access 850 Certificate March 28, 2001 T-Berd
Training Class April 2001 A +
Hardware 40 Hour Course Certificate of Completion October 25, 2002 LYNCOLE
“Theory & Practical Applications of Grounding & Bonding” Certificate
April 11, 2006 Professional
Development Program “Network Basics” Certificate April 30, 2009 Cornell
University RRP (Repair Renovation Paint) Lead Paint Safety Certification
January 7, 2014 |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|