From:                              route@monster.com

Sent:                               Wednesday, September 16, 2015 1:58 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: OSP Technician

 

This resume has been forwarded to you at the request of Monster User xapeix03

Randolph Baclao 

Last updated:  09/17/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

3301 North Park Dr. #1516
Las Vegas, NV  89119
US

Mobile: (916)538-8208   
Home:
(916)760-8080
rcbaclao@yahoo.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: R BACLAO REUME

Resume Value: r9574jnvhtaepu85   

  

 

                                 R A N D O L P H     C.     B A C L A O

932 Toni Ave ., Las Vegas ,NV 89119

Cell Phone: (916) 538-8208

E-mail Address: rcbaclao@yahoo.com , rcbaclao@sbcglobal.net

 

OBJECTIVE:

 

          Position- Outside Plant Engineer, Fiber and Copper Engineer ( Planning / Design / Project Evaluation & Management / Implementation,Business Development ) utilizing my skill , training and knowledge with extensive experienced in the Philippines, Middle Asia ,Middle East and US.

 

SUMMARY OF QUALIFICATIONS:

Profile:  34 years of extensive and practical Engineering / Project design and Planning /     Implementation, Project Estimates / Bid’s and proposals   in Outside Plant System  including  Project supervision and quality assurance in depth background in all aspects of telephone industry. Fiber Optic and Copper cable.

 

Excellent organizational and interpersonal skills, readily accepts responsibility and works well with all levels of management and personnel. Proven leadership and supervisory skill, able to coordinate projects and personnel with sustained high level results.

 

Experienced in coordinating efforts with management and administration, shows team effort and flexibility, able to meet schedule, deadlines and implement correct solutions.

 

 

 

Areas of Expertise:

Project Biddings and Development  – Outside Plant System and Engineering.

Overhead and Underground Facilities Design and Construction.

Project Evaluation Approvals / Field Contract Inspection / Supervision.

Project Development / Planning Forecasting, Long and Short range project.

Fiber/Copper Network Design PDS/DSL/DPG/ FTTN / FTTP/Cell Sites PROJECTS. VRAD PROJECTS, PERMIT DWGS,MTU,MDU

Fiber to the Hub/Fiber facilities to the home, business and commercials

         Computer Literate/Auto Cad,visio.

 

 

EDUCATION: Bachelors Degree

                   B.S. ELECTRICAL ENG’G- Adamson University Class 79

       San Marcilino, Manila Philippines

 

 

 

SEMINARS/TRAINING ATTENDED:

 

a.         FTTCS, Opteman,Gigaman training –CHC Consulting, Santa Ana, CA

   11-26-2012 to 12-7-2012

b.        TECO- CenturyLink-Denver , Co –Oct 2012

c.          OSP-FM and Fireworks/Bidmaster Trainning,- CenturyLink/Qwest

Lakewood, Colorado-  March 4 to 14 2012   

OSP-FM 18.1 – Websiminar- Grand Junction,Co : 5/22/2012                    

d.        Fireworks and Bid Master training- CenturyLink, Las Vegas,NV

e.          ARES PLR/Design & Workprint & Aotl- AT&T  National Trainning

Sept. 11 2006-Sept 29 2006  ATT Sacramento, CA  USA

f.           Managing/Performance Telecom Workshop by Kepner Tregoe AT& T Philippines  Oct. 5-6 1995

g.         ISO 9000 – Awareness and Communication Programme  AT&T & Lucent Tech. Philippines.    June 07 1996

h.         Instructor- Outside Plant System  – AT&T Phil. Sept. 1995 Manila, Philippines.

i.             Outside Plant Eng’g. Course- Telectronis System Inc./ Republic Telephone Co. Pasig, Philippines.

j.             Basic Telephony Course- Republic Telephone Co./ Telectronic System Inc. Pasig, Metro Manila, Philippines

 

EMPLOYMENT HISTORY :

 

 

 

a)     Century Link/Qwest Telecom - ITC -las Vegas , Nevada- 0ct. 20-2013 to present

      Design OSP GPON  Projects, LCP , Fiber and Copper cable , Planning and    Distribution, E7 and C7

b)  Verizon's California-Impact Solutions,  Aug. to Oct. 17-2013- Network    Palnning Engineer for ,Los Angeles Area,

 

c) CenturyLink/Qwest Telecom-Outsource-Inc, Las Vegas Nv

Planning,ISP and OSP design and Groomings,

TECO jobs-jobs closings in all 14 States of Qwest

08/2012  - up to present

 

d)CHC Consulting –Santa Ana, CA, -(Work at Home)

ATT- Opteman, FTTCS Detailed Design for San Diego, CA area.

11/26/2012 to 01/15/2013

 

e)CenturyLink/Qwest  Telecom- Onframe  (Mountain Ltd.- -               3/5/2012-present  Grand Junction, Colorado,

                        Design Copper and Fiber Outside Plant System

                          b) CenturyLink/Qwest  Telecom  (Outsource-Inc) –Las Vegas, NV   

                                        01/24/2011-01/20/2012 Prism Projects for Century     Link/ Qwest  Telephone Company.

1.                 Groom  and Condition F2 cables from Cross Box to Terminals.

2.                 Prepare Plan, Costs and Documents for Customer Fiber Optic Patch Panel Termination.

3.                 Prepare Plan, Fiber availability and Route/ Diversity.

4.                 Prepare ADSL Plans and Documents for Prism TV, Data Customer.

 

 

 

f) AFL Inc.- Southern Ca and Northern Ca- ATT Telecom –

                                                            7/27/09-No Job/Work  2/15/10 –AFL Telenet-

                                                       FTTCS – ATT Northern Ca.

JPA Project – ATT  Southern Ca.       

1. Prepares Plans for ATT mobility Cell sites job, provide underground and                        aerial fiber cable and terminations to MUX, material and labor cost,.

2. Provide Fiber Backbone from Cental office and distribution both UG and aerial fiber cable to SAI/Cross connect termination to Cell site for each wire center and feeder routes, including material and labor cost.

        3. Prepare Joint Point attachements to Power Comapany, Cable TV.

 

g) Wellsco Inc(InfoTech). – Camarillio and Santa Monica, Ca.—VERIZONS 6/21/08-   7/17/09

1.               At Camariilio District Area including Oxnard, Thousand Oaks, Malibu, and Vicinities. : Prepare Plans for MDU/MTU projects, from FDH or fiber count available at MH’s or Pole to customer that are Multiple Dwelling Units, placing fiber cable both aerial , underground , opening IDDS/ICGS/AAIS verizons records and updating and placing fiber cable on prepost records , running material and labor cost, field verification for fiber terminations, coordinate with building owners.

2.               At Santa Monica, Sunset, Vinice, San Fernando Valley area: Prepare Plans both for MTU and MDU projects , placing fiber cable and terminations through IDDS/ICGS plans at Verizons office in Santa Monica , field verifications both UG, aerial and Bldg. Telecom closet, work with other Verizons Dept. on fiber utilizations Planning, Records and others, preparing Work sheets, work distributions, material and labor cost.

 

 

 

 

 

 

h) Northstar Communications: San Ramon, and San Francisco Ca – ATT San Ramon, CA- 3/10/8-6/06/08 ATT San Francisco, CA 6/09/08 -6/20/08

1.             At San Francisco and San Ramon Area including the whole East Bay area from Oakland, Berkely down to Livermore : prepare fiber plans for VRAD ( fiber terminations and Distribution) for FTTN ATT projects, 

2.             field verifications, permit drawings  for VRAD locations, extend fiber cable both UG and aerial from Central Office, prepare material and labor cost, all works are to be done in ARES at ATT San Francisco office on frame to be Pre posted on AREA Frame.

 

i)) Fujitsu Co. – Upland Ca, -Verizons – 2/05/08-3/07/08

At Verizons Office FTTP in Upland District Area, including  Diamond Bar, West Covina, Barstow and Ontario and Vicinities, ICGS /AAIS , Prepare Fiber to the home verizons projects both underground and aerial fiber cable from Central office to new FDH, Requires field verificatuin of FDH locations, terminal and SB locations, Units verifications Business or Res., placing MH’s, SB’s and conduits,include material and labor cost.

 

 

j) Northstar Communications: Sacramento Ca – SBC 3/29/05-2/01/08

SBC Sacramento Office

Prepare FTTN Job for Greater Sacramento Area,  Sonomo Area, Narin county Area and Solano County area for Vrad placement, prepare fiber plans for VRAD ( fiber terminations and Distribution) for FTTN ATT projects,  field verifications, permit drawings  for VRAD locations, extend fiber cable both UG and aerial from Central Office, prepare material and labor cost, all works are to be done in ARES at ATT Sacramento office on frame to be Pre posted on AREA Frame.

 

 

 

k) Randstad Communications – SBC Sacramento 06/27/05  - 07/22/05

At Sacramento SBC Office – FTTN job for Greater Sacramento Area-

All Job was move to Northstar Communications to design the FTTN to continue the VRAD placement and all associated works.

 

 

l) TEK System – Elk Grove, Ca Frontier Telecom- )  07-2005  08-2005

At Elk Groove Area, Prepares expansion project both Copper and Fiber Distribution for Frontier Telecom Wire Center Areas, placing MH’s , SB’s and Cross Connect Distributions, placing cable both UG an aerial cable., including material and labor cost.

 

m) Northstar Communications: San Bruno Ca ( San Jose District)

SBC San Bruno  Office – 3/14/05- 6/24/04

 

Prepare DSL , MPOE, and Maitenance design job for San Bruno area that includes Western side of San Francisco Bay area,  prepare fiber and copper plans and terminations,  field verifications, permit drawings  for placement of  CEV’s  locations, extend fiber cable both UG and aerial from Central Office, prepare material and labor cost, all works are to be done in Auto CADD .

 

 

 

 

n) Ameriss Co. – Riverside Ca.- Verizons Telecom – 3/28/04 – 3/11/05

           At Riverside District Area both San Bernardino and Riverside Area.

Verizons Fiber to the Home (FTTP) jobs , Planning and Detailed Design projects from Central office to each FDH, including Mh’s and conduits, permit drawings, fiber terminal locations, dwelling units both Business and residentials, prepare plants both fiber , primary fiber cable, FDH distributions, terminal locations, MH’s , SB’s and conduit distributions.

 

 

o) Apple Computer / Ingram Tech (Volts) 9/2003 – 3 2/2004

2911 Laguna Blvd., Elk Grove Ca.

Administration and Logistech job for Assembly and installation and distributions of Apple products.

 

 

p) HP Computer / Agilaent Tech-Excel Log(Ranstad)  01/2003 – 9/2003

2911 Laguna Blvd., Elk Grove Ca.

Administration and Logistech job for Assembly and installation and distributions of HP Computer Apple products.

 

 

 

n) NorthStar Telecom – San Jose, Ca- Pacific Bell/ATT Telecom –

  5/20/00-09/16/02

                                                         NorthStar Comm.,San Jose Ca.

                                                         Pasific Bell-South Bay, N. First St. San Jose ,

                                                   CA. 95134

                                               San Bruno, Ca-  SBC/ATT Telecom     2004-2005

                                                 Sacramento, Ca –ATT Telecom -2005 -2008

  BAU jobs for Pacific Bell/SBC/ATT  for San Jose Bay area, and   Sacramento District Area, prepares copper and fiber distribution both DSL, VRAD and Pronto Projects, including new CEV locations for DSL, VRAD locations for Fiber,

 

 

q)  NTT Nippon Telecom & Telegraph Co. (Japan) 09/1998-02/1999

                          Project Location : Sri  Lanka 1998-1999

Work with NTT and NTC of Japan, project locations Sri Lanka (Sri Lankan Telecom Co) Planning and Distribution Design for 5 years and Long term Planning study, prepare fiber and copper distribution w/ MH’s , SB’s and conduit layout for the whole Sri Lanka Telecom Outside Plant System, include material, labor cost and project construction terms.

 

 

r) BECHTEL Co. (Telecom Div.)- Aramco - Al Khobar , Saudi Arabia   7/1996-7/1997

AT Al Khobar , Saudi Arabia- Project Locations at ARAMCO- Arabian and American Oil Co. – Prepare and Copper and Fiber Planning, Project Study and Distributions , Fiber HUB, CO installations  and MUX, Eqpt., prepare design for  Oil refinery, Bldg and Residentials Fiber and Copper Distributions including Material and Labor cost, permit drawings and more.

 

 

s) FLOUR DANIEL Co. (Telecom Division-Middle Asia and Pacific Region)

                           Proj Location : Gujarat, India    12/1997-05/1998

        At Manila Regional office for Asia and Pacific area.: Prepare Project Study , Business Development, Bids and Proposals, for Telecom project in Manila, projects also include in Gujarat India and Vicinity , field Visit in Gujarat India coordinate with Municipal, Business and Res, District about possible expansions projects for Telecom.

 

 

t) AT& T  Philippines (Asia Pacific Region) 7/1995- 7/1996

                                                             AT&T Phil. & / Lucent Tech. Phil.

                                                              Makati City, Phil.

 

At Regional office in Manila for Asia, ATT covers for the Outside Plant Design , Planning and Trainninng for possible Telecom expansion projects for ATT., both fiber, copper and labor , material cost.

Projects for Globe Telecom, Subic Telecom, Islacom telecom.

 

u) PhilGest/ PCNC – Tel. Eng’g. Contractor – )  7/1990-7/1995

 

At Manila. Contractor for Telecom Company for Fiber and Copper Planning and Distribution Design, fielding and coordination w/ Carrier and customers, prepare the whole package and submit to Carrier Telecom Co for approval and constructions, that includes all the Primary, Secondary, Mh’s details with material, labor and construction cost.

 

 

v) Saudi Telecom Co. – Kingdom of Saudi Arabia –7/1985-7/1990-1991-1994

         At Al Qassim, Riyadh and Madinah Kingdom Saudi Arabia: work with  this Mnistry, - prepare the whole Outside Plant System both copper and establishing an study for fiber design, that includes Primary , Secondary and Cabinet area design , issue small, routinary and big expansion projects.

 

w) Philippine Long Distance Telephone Co. – .           2/1981-7/1985

                                                        Phil. Long  Distance Tel. Co. (PLDT Co.)

                                                        Makati City, Phil.

       At Manila, an employee for this Telecom Comapany – prepare routinary design for copper distribution design to an existing facilities on filed , prepare entrance cable, rehab , replacement that includes field verifications and coordinationd w/ building owners or pole removals.

 

 

 

 

x) Republic Telephone Co.  )       6/1980-2/1981

                                                        Republic Tel. Co. (RETELCO),Pasig City,Phil..    

     At Manila, suburb of Metro Manila,- my first job and undergo Outside Plant Engineering training after graduating from BS in  Elec. Engineering, design an small jobs for Outside Plant System- routine , rehab , cable replacement and fielding, for republic Telecom Co. as an employee of this carrier.

 

 

 

 

 

 

AWARDS & MERITS:

              Outstanding Employees of PLDT Co, (Phil. Long Dist. Tel. Co.)

                              MERITORIOUS PERFORMANCE AWARD FOR 1983,

                              Makati, Phil.

 

               Outstanding Employees of CNAD (Cable Network Adm)

                               For 1982- PLDT , Makati, Phil.            

 

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-NV-Las Vegas

Relocate:

Yes

Willingness to travel:

Up to 25% travel