Kyle Calloway
Oklahoma City, Oklahoma 73132 US
Phone: (405)761-4788
Kyle.calloway@yahoo.com
EMPLOYMENT HISTORY
Owner/Project Manager
PC LLC/Calloways
December, 2010 — December, 2010 ()
PC LLC/Calloways Dec. 2010 Owner/Project Manager Residential low voltage cabling, wireless and
wired networks, wireless and wired security camera installation, Online Specialty Store
Field Manager
Rausch Coleman Homes
October, 2008 — December, 2010 (2 years 2 months)
Rausch Coleman Homes Oct. 2008- Dec. 2010 Field Manager Responsible for overseeing sub
contractors Conducting a punch list Ensuring that all punch list items are completed Ordering
materials Taking care of customer care issues Filling out work orders to be completed Overseeing
completion of new home construction from start to finish Completion of new home within budget and
timeline Responsible for meeting with city inspectors
Project Manager
Stampsco
April, 2008 — September, 2008 (5 months)
Stampsco Apr. 2008- Sept. 2008 Project Manager Responsible for low voltage cable install
Projects: Oklahoma Blood Institute Installation of over 35,000 feet of Cat. 6 network cable,
Installation of Motorized projectors at four separate locations, Installation of security cameras and
fire alarm cable.
Fiber Tech/ Lead OSP
Trans-Tel Central
February, 2007 — April, 2008 (1 year 2 months)
Trans-Tel Central Feb. 2007- Apr. 2008 Fiber Tech/ Lead OSP Responsible for all outside plant fiber
installation Responsible for managing employees on the job
Owner/Bore Rig Operator
Underground Directional Boring
May, 2006 — January, 2007 (8 months)
Underground Directional Boring May 2006 Jan. 2007 Owner/Bore Rig Operator Responsible for
operations of boring Responsible for placement of fiber optics Responsible for handhole placement
and boring Responsible for supply technical advice towards networks
Project Manager
Trillion Digital Communications
April, 2004 — May, 2005 (1 year 1 month)
Trillion Digital Communications Apr. 2004- May 2005 Project Manager Responsible for new
construction projects. Responsible for sub contractors. Responsible for setting poles for RF
equipment. Responsible for overseeing running electrical and fiber to pole for RF equipment.
Responsible for overseeing placement of RF equipment on poles. Responsible for overseeing
placement of Network equipment on pole and inside Communication closets. Responsible for
overseeing termination and testing of fiber. Responsible for overseeing Safety on job sites.
Responsible for overseeing correct alignment of antennas. Responsible for scheduling sub
contractors work week.
Field Representative Specialist
General Dynamics
October, 2000 — March, 2004 (3 years 5 months)
General Dynamics Oct 2000 Mar 2004 Field Representative Specialist Responsible for inventory of
network equipment, setting up network equipment in lab (onsite). Assisted Network Engineers with
configuring switches and routers. Assisted test engineers with all phases of equipment testing.
Conducted building walkthroughs to check fiber distribution panels, ensuring adequate number of
fiber strands were present and terminated. Installed racks and cabinets in buildings for network
equipment. Installed network equipment in racks and cabinets. Installed and tested BackUps for
network equipment. Dressed, terminated and tested fiber optic and Category 5 cable. Conducted
site surveys with the customer on location and design of network equipment. Helped with vendor
selection. Worked on Visio drawing for collaborative design review and final design review. Assisted
outside plant personnel with placement of fiber optic distribution panels; pulling fiber to location of
network equipment, and Fusion Splicing Fiber Optic Cable
Lead Technician
ADNET
January, 1998 — January, 2000 (2 years)
ADNET (Advanced Networking Technologies) Jan 1998 - Jan 2000 Lead Technician Responsible for
new construction projects, training, installing, and testing for all types of low-voltage cabling. Lead
Technician member of an on-site team for Kaiser Permanente Attended project meetings,
conducted analysis of clients' needs, designed switch rooms and backboards. Responsible for
installing Microsoft software on new computers, Setting up Microsoft Exchng personal computers,
installing hardware, Installing network components such as hubs, NIC cards, cable modems,
Training new technicians, Resolving network issues pertaining to Hewlett Packard, Lexmarx and
Kyrocera printers, Maintaining client workstations, Troubleshooting PCs and networks.
Communications Specialist
U.S. Army
January, 1992 — December, 1996 (4 years 11 months)
U.S. Army 1992 - 1996 Communications Specialist Setup, maintained, and installed SINGARS
systems for an Elite Airborne unit out of Ft. Bragg, NC. Schools included: Airborne Airborne Ranger
Sniper Sears Special Operations Also assisted with SATCOM installation and operation Formal
Training
IDENTIFIED KEYWORDS
We've pulled the 20 top keywords from this candidate's resume and ranked them below in order
of most years experience to least.
training
testing
operations
satcom
cabinets
design review
site surveys
vendor selection
drawing
splicing
inventory
fiber optic cable
visio
fiber optic
ordering
budget
cabling
printers
clients
pcs
Last updated on 2015-03-10
Powered by ZipRecruiter