From: route@monster.com
Sent: Tuesday, December 22, 2015 8:02 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Resume Robert C.
Carson 1816 Palo
Alto Circle Las Vegas,
Nevada 89108-2502 Phone +
FAX: 702.207.2105; Cell: 702.339.8674 Email: robert.c.carson@gmail.com Chief
of Project and Construction Managers -Innovative Solutions to Complex Projects-
SECRET Clearance Hands-on
visionary with advanced technical expertise in Project Management, Construction
Management, building, decommissioning Cell Sites; RFIs, RFQs, ROW,
SOWs. Strong skill set in all types of
telecommunication technologies including: analog/ digital microwave radios, Fiber
Optic cable systems, lightwave/SONET trunked radios, video
conferencing systems, PBX/telephone systems, digital/analog multiplex data
communications equipment, remote telemetry/SCADA, protective relaying
and AC/DC power. Telecom Construction, Cable managing,
analyzing, and implementing complex technical Projects like FTTH/FTTx,
DAS, WiFi using AutoCAD,iBWave, Planet, and ATOLL; extensive
knowledge in Construction, Project Administration, analysis,
engineering, end user support in FTTH/FTTx, DAS, WiFi with
their BOMs infrastructure Design Review
and Approvals. EDUCATION & CAREER DEVELOPMENT ·
Fixed Ciphony Repair-Crypto, (AUTOSEVOCOM)
US Army, Ft. Monmouth, NJ-Chu Lai, Vietnam 1967-1969 -. Voice,
Facsimile, Data encryption over Wide Band and Narrow Band
devices. ·
OSHA-Train The Trainer- 2014-Nashville,TN. ·
Registered Communications
Distribution Engineer (BICSI) July 2011 to Present ·
Project Management Professional (PMP)
2012 to Present ·
MBA-
University of Redlands 1985 ·
BS-EE
- San Jose State University 1977 ·
BA
Sociology/Criminology – University of Washington 1967 ·
BS-Telecommunications
Engineering Technology-College of Telecommunications Engineering 15 Jan
1999 ·
International Association For
Radio, Telecommunications And Electromagnetics (INARTE)-RF
Endorsement-NO: E1-02939 - 20 Oct 1987 to Present ·
Information Technology
Infrastructure Library (ITIL) v3 certified 2013 ·
TIRKs, Vbuild, CBS/CNE, CLLI.NET,
CITRIX, FROGS, ACAD usage Professional
Experience (Most Contracting) Talescend
LLC-Contractor for Bechtel Communications For GFI FTTH-Nashville, TN March
2015 ·
SME on
OSP aerial and Directional bore solutions for FTTH PON system. Robert C. Carson Page 2 ·
Managed the “proofing” of
collocation Ducts Downtown Nashville in NES Manhole System. CSX
Railroad permit Drawings for Directional Bores and Aerial crossings. Reviewed
and changed Design FTTH parameters to meet optimum OSP specifications.
OSP construction methodologies; OSP construction bid and award process; OSP
route feasibility and design development ·
OSP engineering, permitting, make
ready and construction processes; ·
OSP metrics and measures; Working
knowledge of GIS-based tools such as MapInfo, ArcView or Google Earth ·
Third party conduit and fiber
negotiation and purchase. Louis
Berger Aviation Services –Project Manager- Electrical & Civil Engineer
Constructor - FOB Gamberi, Afghanistan November 2013 – 15 May 2014
(Completed)US
Army Force Protection, CRAM, Communications – FOBs Gamberi, Wright,
Mehtar Lam, Torkham –SECRET Managed construction solutions for perimeter and building
defenses, replacement of Central to Distributed Electrical generation
on FOBs Gamberi, Mehtar Lam, Torkham, Wright. Wrote SOWs, RFQ's BOMs. Wrote
and Managed Deconstruction/Decommisioning and turnover plans to ANA,
ABP. Planning, design, standards and quality
review, scope and Bill of Material development, vendor engagement and costing
matters related to structured cabling (FTTH/FTTx-General Staff) and
environmental activity for input to PIMP. Satcom
Systems, Inc – Construction Manager-Infrastructure FTTH/FTTx project-
City of Shafter, CA May 2013 – October 2013 (Completed) Managed
construction contractor
Sebastian Corporation in plowing, trenching, directional boring of 2” HDPE
inner ducts, locate wires, marking tape for 25 installed miles of PON
Fiber Infrastructure, placement of 106 Handholes, bowing and pulling
various fiber cables, splicing of FTTH/FTTx network. Planning, design,
standards and quality review, scope and Bill of Material development, vendor
engagement and costing matters related to structured cabling and
environmental activity.. ACRS -Director OSP Design
(FTTH/FTTx) And Civil Construction - Lubbock and Plainview, Texas.
May 2012 – March 2013 (Completed) Design
Engineer/ Planning on R.U.S. Funded Telecom Project in Lubbock, TX. For NTS
Communications.This was Fiber to the Home for Lubbock and Plainview and
several Robert C. Carson Page 3 small
towns in between. Established C.O.’s, longhaul and distribution for GPON
System. Loyal Source Government Services -
Senior Telecommunication Construction-Project Manager,January 2012 – May
2012 Vandenberg AFB, CA. SECRET (Completed Project) Configured Cisco SRW208, 2911;
Produced Red Line Drawings for switches and routers installation. Performed
BER and circuit configuration testing and placement for VOIP and
telemetry links for Minuteman and Atlas missiles. Planate Management Group – Strategic
Civil Construction Planner - June – September 2011 Kabul + Kandahar,
Afghanistan - Expeditionary Cell Communications System (ECCS)-ISAF
(Completed Project) ·
Managed Construction and placement
of call processing Centers of Emergency Service after
Kandahar Area Wide Cell Sites and Fiber Channel E-1 Shutdown By Taliban after
1800 daily. Developed the Creation of Trouble Ticket/Help Desk
System on this Congressional approved 20 COW system linked by Microwave
and installed by Mantech Corporation defining call parameters; Planned
and Managed placement and connection of 20 ·
Generators as Prime Power source
for 20 COW system. Senior construction adviser to NATO in the
rebuilding of the wireless telecommunications. SIX3 Systems, Inc
- SIX3 Systems, Inc – November 2010-May 2011 (Completed Contract) CIDNE/TIGR
Operator-Battalion S-2; SME Construction Manager- FOB Orgun-E, Paktika
Province, Afghanistan-- Inputted
daily Sigact reports into Combined Information Data Network Exchange (CIDNE)
and Tactical Ground Reporting System (TIGR) on Centrex and SIPR. Produced
Person, Village, and Bed down area PowerPoint Baseball Cards on
Americans, Filipinos with data pulls from several sources for Company and
Battalion operations using Query Tree, M3. GSM/GPRS/WCDMA/UMTS Cell
equipment, VOIP, WAN connectivity optimization. Terra Concepts
LLC- Civil Information And Construction Manager-Brigade November
2009-November 2010 (Completed Contract) FOB’s Gardez,
Sharana, Chapman- Afghanistan -Managed
CIDNE Commander’s Emergency Response Program (CERP) financial, Engineering,
Rule of Law folders prior to publishing into database. Developed Target
Person folders with pictures and assessments of Locals. Instructed Military
Civil Affairs officers and EM in CIDNE reporting procedures. Developed
PowerPoint slides on procedures and processes. Managed the
Construction on Military and Civilian optimizing LAN/WAN, MW, FTTH/FTTx
low voltage telecommunication arrays. Battlespace
Flight Services- Consultant in Tech Control as Senior WAN Telecom Robert C. Carson Page 4 Construction
Specialist - June 2009–October 2009 SECRET Ramstein
AFB, Germany-Built Satcom
low voltage circuits on the Reachback program. Troubleshot and
performed uplink and downlink connectivity between pilots in the USA and
Predator and Global Hawk drones in Middle East using LAN/WAN's over SIPR DISN
ATM network. U.S Census Bureau-Collection
Manager- Las Vegas, Nevada - March2009 - June2009 (Completed
Project) Canvassed
neighborhoods to verify residents, Apartments, Commercial addresses. Took GPS
Map spots of all structures. Mapped with GPS map spots new streets and houses
in sub divisions. NEK/ASG -Project Manager -Sr. FSR
JTF Paladin- Afghanistan - June 2008 – December 2008 (Completed) SECRET Installed, programmed, and tested Duke V-2
jamming systems in various vehicles. Installed, programmed, and tested
MMBJ 2.1 jamming systems in various vehicles. Wrote reports on installations
and maintenance for Military leaders. Managed Construction on
fiber/CAT 5 LAN/WAN optimization for JOC/NOC's for NIPR/SIPR/Centrix systems
over DISN array. Advanced Information Systems –Sr.
Civil Construction Manager Consultant For COX Cable - Las Vegas,
Nevada - February 2008 – May 2008 (Completed Project) Wrote RFP for construction
on major clients’ premises for best installation and utilization of Cox fiber
Channel connection (FTTH/FTTx) and CCTV
embedded plant. Gathered data from various Cox Construction, Planning,
Design, Splicing entities to develop a Construction Guide for Contractors not
familiar with Cox policies and procedures. RFP approved by various Cox
Vice Presidents and Directors. RFP implemented by issuance to several
Contractors. ITT Federal Systems (ITT
TACSWACAA-US Army-Taji, Iraq)- Civil Construction Management-Telecom (Low
Voltage) -August 2004 – January 2008 Completed Contract) Secret Managed FTTx +
Cat 5 installation
and Troubleshot Low voltage Network connectivity for
Multi-National Warfighters’ computers;Created new User
Accounts for NIPR, SIPR, Centrix in MS Active Directory, CIDNE; Created
new
mailboxes, distribution lists; Updated users’ profiles. .Troubleshot Cisco
VOIP
phones, Models 7912, 7940, 7960, 3550 and managed users on low voltage (
LAN/WAN) connection procedures. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Bahasa Indonesia |
Beginner |
|
|
English |
Fluent |
|
|
German |
Beginner |
|
|
|