From: route@monster.com
Sent: Tuesday, December 22, 2015 8:03 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
|
|
Fred R Matuszewski |
|
|
· VISIO (CAD) System
· Materials Management
· Materials ordering
· Creating site construction specifications
· Creating construction drawing templates
· Writing construction scopes of work
· Creating bills of materials
· SP/ASP and Quality Mgmt. on a given cell site
· Process and procedures as well as all Federal and Local
standards.
· EWO (CAD) System
· PACS (Pricing) System
· Hand Drafting
· LODGE Data Design
· OSPCM, BST (CAD)
· Micro Station Auto CAD
· Spatial Engineer 9.X (CAD)
· TELSTRA Networks
· GIS Mapping
· ICGS
· IDDS
· BDMS
· Make Ready Engineering Design
· Microsoft Excel, MS Project, MS Office, Word, Power
Point
· Project Management Course ADESTA LLC
· Project Engineering
· Site Acquisition Leasing
· Construction Supervision
· Fiber Engineering
· Copper Engineering Aerial
· Buried
· Underground
· Conduit-Manhole Engineering.
· Languages: English, (Spanish ongoing process, taking
classes)
· I Knowledge of OSHA regulations.
· All positions listed have been of contract nature with
Telephone Companies, throughout the U.S.
· These positions were subject to financial wellbeing of the
operating companies.
· Most positions were of short term nature.
Military Service US Army SF 5th & 7th
GP (Top Secret inactive Clearance)
Duke Energy, for APC Inc.,
Ohio
05-2014 to Present
OSP CW Professional, Transport Engineer
· Engineering fiber cable to Power Substations and cell
sites, and developing routes to in-house customer locations, using existing
back bone fiber. And new fiber, the design included aerial in power zone, and
the utility zone, with some underground.
· Field survey’s included collecting data using GPS
instrumentation; GIS Mapping, Make Ready Engineering, Project managing
my projects, the work included collecting pole data, attachment heights of
existing plant. Engineering new cable locations. Working in the power
zone.
· Site acquisition,
Material requisition; coordinating with cell tower customers, work crews,
city, and state representatives.
· Creating permit requests for all necessary applications.
Horizon Telecom, for Sigma Tech., Ohio
09-2012 to 05-2013
OSP Engineer
· Engineering fiber cable to cell sites, and developing
routes to customer locations, using existing back bone fiber. The design
included both aerial, and underground.
· Field survey’s included collecting data using GPS
instrumentation; GIS Mapping, Make Ready Engineering, the work
included collecting pole data, attachment heights of existing plant; using a
Tremble hand held GPS survey instrument, engineering new cable locations.
· Site acquisition,
Material requisition; coordinating with cell tower customers, work crews,
city, and state representatives.
· Creating permit requests for all necessary applications.
TEK Systems for Windstream Com. of Hudson,
Ohio
01-2012 to 08-2012
OSP ENGINEER
· Designing jobs on Micro Station, both underground and
aerial, Job Track was used, a material, and labor based costing software
used by Engineering for job pricing.
· The work composed of placing fiber to the cell site,
placing copper and pair gain equipment.
· Coordinated Site acquisition, Material requisition
coordinating with customers, work crews, city, and state representatives.
· Creating permit requests for all necessary applications. Job ended due to the lack of work.
Telecom America Services for Frontier Com.,
Fort Dodge, Iowa
6-2011 to 11-2011
OSP Engineer
· My work consisted of road moves, new business services.
· My area of work consisted of several small towns within a
200mile radius of the Ft. Dodge area.
· Make Ready noting power violations etc.
· I did rehab of copper, to include aerial, buried,
underground, and damaged fiber cables, Site acquisitions.
· I placed fiber to the cell sites.
· I worked on Infinium, and materials, and labor based
costing software used for job pricing.
· I worked with Spatial Engineer 9.x CAD System.
· Job ended due to lack of funding.
VIASYS Corp. for Corps Engineers, Fort
Bragg,
NC
09-2010 to 10-2010
Engineering Coordinator
· I Coordinated ISP and OSP, fiber cable and equipment
placement in Central Offices, and billeting locations through the entire Fort
Bragg area.
· I Coordinated with DOD.
· Terminations to cell towers.
· The work was scheduled to last for three month; due to a
lack of funds the project was halted.
AT&T, Raleigh, NC
02-2010 to 09-2010
OSP Engineer
· I was responsible to five in house company Engineers.
· I surveyed the existing plant, through the Raleigh area.
· I did all rehab to copper, to include aerial, buried,
underground, and damaged fiber cables, Site acquisitions, Make Ready for
new cable, I worked on special projects Engineering fiber to the cell
sites, Using OSPCM, BSTCAD, and Micro Station Systems.
· Job ended due to the lack of work.
EMBARQ, Fayetteville, NC
04-2008 to 01-2010
OSP Engineer for Telecommunications
Services
· I worked on fiber projects, copper cable projects
(subdivisions) design, DSL, T-1 etc.
· All outside Plant functions.
· Site acquisition, I used GIS gathering equipment, EWO,
PACS, Class, ICE, ECP, and other EMBARQ systems.
· Make Ready Engineering, The job ended due to the lack of
work.
AT&T, Laurinburg, NC
05-2007 to 04-2008
OSP Engineer for Outsource
· The position consisted of rehab of existing damaged plant;
to include pole replacement, copper cable, fiber cable, new services,
subdivisions.,
· Cell tower sites, Material requisition coordinating with
customers, work crews, city, and state representatives.
· Make Ready Engineering, Creating permit requests for
all necessary applications.
· Job ended due to the lack of work.
Time Warner Telecom
05-2005 to 02-2007
OSP Engineer for Telecommunication Services
· I worked, and coordinated with TWC Engineering, Sales
dept. and Installation crews.
· I Coordinating with contractors, and customers.
· My job was to work with business customers only.
· Sales would request a survey to a prospective customer; to
determine the accessibility from the existing fiber cable ring. Once the
determination was completed, I would set up a site meeting, to coordinate
with all interest parties.
· The survey would include the duel entrances, Engineering
SONET, DWDM, Central Office/Common Systems, and Ethernet Switching.
· Routing inside duct, plenum cable, equipment locations,
and taking measurements for the wiring, and also Grounding accessibility. I
then would draw up the project on VISIO CAD; I would make up a distribution
chart, and map assigning dark fiber to new customer’s location.
· I would then coordinate the construction.
ADESTA LLC, Lynchburg, VA
08-2004 to 05-2005
Engineered Fiber Cable and Construction
Managed
· The project was a revitalization project that was funded
by Big Tobacco money. The project was a 750 mile fiber optic project.
· The start of the project was Farmville, VA, and finished
in Petersburg, VA.
· The project involved: Site acquisitions, Make Ready
engineering, using a Tremble GPS data collecting system.
· The Make Ready was engineered, and mapped to be turned
over to the pole owners for their approval.
· The fiber cable was both aerial, and underground.
· Permits to Virginia Dept. of Transportation, and
Railroads, Cities, Counties, and DOD to cross Military reservations.
· I also met with property owners to negotiate POP sites,
and running lines if necessary.
Sprint, Kernersville,
NC
01-2003 to 04-2004
OSP Engineer for Outsource
· Design copper, fiber cable jobs, and OPEC projects.
· Reworking an entire Service area.
· Placing new feeder, and distribution.
· I engineered road move projects new and old subdivisions,
coordinated with State City, and county permitting divisions.
· I coordinated with contractors aerial, buried and
underground.
· I was also assigned a 7,500 line exchange to maintain.
Sprint, Junction City, Kansas
07-2002 to 11-2002
OSP Engineer
· Designed copper cables, drew jobs on EWO CAD, and priced on the PACS system.
· I covered an area from Kansas City to North to Nebraska,
and South to Wichita I also coordinated with State City, and county
permitting agencies.
Cleveland, Ohio
07-2001 to 11-2001
OSP Engineer to Telecom America Services
· The position was to engineer and rehab existing copper
cables throughout the Cleveland Ohio area, it included both residential and
business.
· Refurbishing both aerial and underground the project ended due to the 9-11 attack on the United States.
KMC TELECOM LLC, Fayetteville,
NC
02-1998 to 11-2001
Project Engineer
· My projects were Fayetteville NC, Wilmington NC, and Fort
Bragg NC.
· I was a Project Engineer during the design phase.
· I managed the construction during building phase.
· I placed a 41 miles of aerial and buried fiber optic
ring around Fayetteville, and 10 mile ring around Fort Bragg, with a 28
mile aerial and buried ring around Wilmington NC.
· The entire jobs had to have make ready completed and
approved, by pole owners.
· Once the construction was complete, I worked with the
sales, building laterals to new customer’s installation of equipment
collocating with other carriers, along with Public Works Fiber System.
· I maintained a warehouse with materials needed for
expansion.
· I acquired Site locations, and I planned, and managed the
dark fiber keeping a fiber distribution and assignment map.
· This was supposed to be a position with longevity, KMC’s
management over extended its finances, and was forced to go bankrupt.
Sprint, Fayetteville, NC
04-1996 to 01-1998
Sr. Project Engineer
· I worked in the Fayetteville Engineering office my duties
were engineering fiber projects, copper projects, service orders, and
road move coordination’s.
· I drew all my projects on Sprint EWO, PACS systems.
· I engineered the first fiber subdivision in the
Fayetteville area.
Sprint, El Paso, Texas
09-1995 to 03-1996
Contracted for AEROTEK
· I worked for Sprint Long Line out of Phoenix, AZ.
· My job was to engineer, and replace a 22 mile fiber optic
cable that was damaged by the railroad several times in the same area.
· I was to reroute the cable to Interstate 10, and back to
the railroad.
· The plan was to replace the single mode cable with a dual
mode fiber cable.
· Sprint requested a Geodetic Survey and to provide HEC GIS
lode data design information on all major dry washes.
· The project was completed on time, and brought in under
budget.
Earlier Jobs
D.R. Allen GC Position:
· Project. Mgr. Quality Control Ft. Bragg/Pope AFB worked
w/DOD Building Rapid Deployment Center, for Delta Force. (Sec. Clearance)
· Pratt Whitney Aircraft Aerospace Designer, Worked on the
Space Shuttle (Sec. Clearance), Daniel International Document Control Super.
Buffalo State University of New York,
BS, Civil Engineering/Cons. Marketing
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
|