From: route@monster.com
Sent: Tuesday, December 22, 2015 8:03 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
BONIFACIO O. RECINTO 1124 Garland Way Corona, CA 92879
Mobile: (510) 299-8942 E-mail: bonn1221@yahoo.com Objective: Seeking a planner/outside plant/cable or wireless
network engineering management position. Offer extensive hands- on and
supervisory/managerial experiences in various multi-million dollar project
(locally as well as abroad), within the telecommunications industry. Summary: Network/Planner/Contractor/Project Control Engineer with (30) thirty years
experienced in Telecommunications Outside Plant Engineering. Worked
previously for Cendera/Fujitsu Consulting Inc. (Upland, California, U.S.A.),
Ameriss Corporation (Riverside, California, U.S.A.), Lourdes
Industries, Inc. (Hauppauge, New York, U.S.A.), Bechtel Corporation (San
Francisco, California, U.S.A.), Maverick Engineering & Consulting
(Martinez, California, U.S.A.), NorthStar Communications Group (AFL-Network
Services) (San Jose, Fresno, California, U.S.A.), Mastec North America
(Hayward, California, U.S.A.), AT&T/Lucent Technologies/Bechtel
Telecommunications (Manila, Philippines), Saudi Telecommunications
(Kingdom of Saudi Arabia), KTK Fujikura (Manila, Philippines) and Philippine
Long Distance Telephone Co. (Manila, Philippines). Work Experience: IMPACT SOLUTION INC. Upland/Ontario, California, USA LFA-FTTP Senior Engineer – September 2008 to
Present Supervise the SFU/MDU/MTU-FTTP (Fiber to the Prem) project for Verizon
Communications in the San Bernardino, Riverside and Los Angeles Counties.
Plan, design, and quality control, feeder and distribution work orders with
complete cable and conduit design and City/County permit drawings using
Auto Cad program. Job also includes posting, work print
creation, task coding, narratives, pricing, contractor assignment,
DOR (delayed order request), work flow, fiber to the cell site (AT&T
Mobility Projects), Greenfield (preparation of scaled layout drawings for new
developments), T1/DS3 customer’s request and other BAU road widening
projects. Familiar with Verizon systems such as IDDS/ICGS, AAIS,
V-build, IVAPP, BDMS and CCP. Design FTTP aerial networks which includes
fielding, make ready and pole loading(using easy load and o calc programs).
Meet with Verizon managers, engineers and planners on a regular basis regarding
quality, FTTP standard updates, product launching, deliverables/schedules,
billing, permit requirements and project management. CENDERA/FUJITSU CONSULTING, INC. Upland, California, USA FTTP Senior Engineer – August 2005 to September
2008 Managed the FTTP (Fiber to the Prem) project for Verizon
Communications. Plan and design feeder as well as distribution network in
various wire center in the Riverside and San Bernardino Areas. Job includes
quality control check on all completed work orders, conduct training/lectures
on FTTP standards, assign work orders to engineers and associate engineers,
regular meeting with Verizon managers, supervisors and engineers, report
directly to the regional manager on a daily basis regarding updates on the
whole FTTP project. AMERISS CORPORATION Riverside, California, USA Outside Plant Engineer – March 2004 to August
2005 Worked on the FTTP (Fiber to the Prem) project for Verizon
Communications. Plan and design feeder as well as distribution network in
various wire center in the Riverside and San Bernardino Areas. Job includes
quality control check, training associate staff, coordination with clients,
city and utility engineers, regarding engineering and construction standards.
LOURDES INDUSTRIES INC. Hauppauge, New York, USA Field Communications Engineer – January 2004 to
February 2004 Performed field surveys and design for Verizon Communications under
the FTTP project (Fiber to the prem) in Westchester and Rockland Counties which
is part of Valhalla wire center. BECHTEL CORPORATION San Francisco, California, USA Market Engineer – October 2003 to December 2003 Worked on the AWS (Advanced Wireless systems) project for the San
Francisco Market. Job includes quality control check on wireless network
design plans done by contractors, exact location of UMTS equipments and
antennas and making sure all design conforms with AT&T and Bechtel
standards. LOURDES INDUSTRIES LLC Hauppauge, New York, USA Outside Plant Engineer – July 2003 to Sept 2003 Worked on-premise with Verizon Communications as an outside plant
engineer for various telecommunication projects in the Brooklyn Area. Job
includes conduit layout and cable design(buried/UG and aerial), T1 lines,
house cable, Lfacs verifications, planning studies, PGFLEX, cable extension,
Microsoft visio drawings and various maintenance jobs. MAVERICK ENGINEERING & CONSULTING Martinez, California, USA Contractor Engineer – Feb 2003 to June 2003 Worked on-premise with Mastec North America as a contractor engineer
for the Comcast project in the Bay Area. Job includes design of fiber rings, aerial
detailed design, make ready and wind/pole loading, which is part of the
Comcast Cable upgrade in various areas. NORTHSTAR COMMUNICATIONS GROUP San Jose/Fresno, California, USA
Project Engineer - June 2001 to Jan 2002 / April
2002 to July 2002 Worked on-premise with Pacific Bell as a contractor engineer for the
PRONTO Project in the South Bay Area. Performed, monitored, and reviewed
planning and scheduling/cost engineering functions. Engineered various wire
center locations placing Remote Terminal such as CEV, CEC, Lite-span and
upgrades cross-connect cabinets. Job includes civil work conduit layout design,
cable design, pole lines and city/county encroachment permit acquisition using
Autocad 1998. MASTEC NORTH AMERICA, INC. Hayward, California, USA Engineering Manager/Project Control - May 2000 to
June 2001 Managed the engineering design of underground broadband network
projects for RCN Telecom Services in various locations in the Bay Area. Also
managed the preparation of detailed underground engineering network design
for Bechtel Telecommunications under Metromedia Fiber Network project for the
San Francisco and Los Angeles loop areas. Job also includes preparation of permit
drawings, coordination with various public utility companies, City/County
Public Works & Engineering Department, and property owners. Prepares and
analyzes comparisons of scope, quantities and cost data between projects.
Develops bid evaluation cost and schedule criteria and prepares bid
evaluations. MAGNITEL, Inc./KTK-FUJIKURA Phils., Inc. Makati City,
Philippines
Supervising Senior Engineer – May 1997 to Dec 1999
Controlled and managed the preparation of the ultimate outside plant
engineering design, aerial pole lines and underground networks, to meet the
telephone expansion project of Globe Telecom-Phase 2 in Makati area taking
into consideration the existing guidelines and planning standards of Globe
Telecom and KTK-Fujikura. AT&T Phils. Inc./LUCENT TECHNOLOGIES/BECHTEL Phils. Makati City, Philippines
Supervising Senior Engineer – March 1995 to May 1997 Controlled and managed the preparation of the ultimate Outside Plant
Engineering Design, aerial and underground network (Demand Forecast,
Fundamental and Detailed Design) to meet the telephone expansion of Globe
Telecom in Batangas area taking into consideration the existing guidelines
and planning standards of AT&T/Lucent/Bechtel and being the primary
function to develop, plan and design aerial, buried and underground fiber and
copper cable network which will enable Globe Telecom to give service to
potential subscribers, as identified during the planned life of the network,
with a minimum additional expenditure. Saudi Telecommunications Riyadh/Abha, Kingdom of Saudi Arabia Senior Engineer – May 1982 to February 1995 Responsible in the planning and engineering of several outside plant
telephone network projects, as part of the company’s telephone expansion
program. Responsible in conducting thorough planning studies on areas to be
served, performing specific phases of the job to provide these areas with
cross-connect networks, i.e. cross-connect telephone cabinets, primary and
secondary facilities, manholes and conduits, etc. Further duties includes
analysis, design, forecast, calculation of the major items to ensure that the
highest engineering requirements, standards and design are met; transmission
and signaling limits, cabinet boundaries, sizing of primary and secondary
cables, feeder cable routes, future growth requirements to cover a 25 year
period, planned timing of primary and secondary cable relief, pressurization
requirements of primary cable, duct sizing requirements for present as well
as planned future facilities. Philippine Long Distance Telecommunications Company MGO Building, Legaspi, Makati City, Philippines Engineer 1 – June 1980 to May 1982 Conducted planning, design feasibility studies, specifications and
implementation requirements pertaining to the outside plant facility demands.
Conducted field survey, inspection and coordination with parties involved
directly or indirectly before and during construction of projects for proper
implementation. Designed underground/aerial cable, manholes and conduit,
house cable distributions and other related activities regarding outside
plant facilities. Worked also involves planning, material and cost estimates based on economics, forecast studies and other related
technical data. Education: Bachelor of Science in Mechanical Engineering/Graduated May 1980 Don Bosco Technical College Manila, Philippines Training and Seminars Supervision Training (October 1996) Career Planning (August 13-16, 1996) ISO 9000 Awareness and Communication Program (July 1996) Network Systems Asia/Pacific Strategy Forum (April 1995) Documenting Management Practices, Process, Systems and Procedures
(March 1995) Planning and Costing of Materials (July 1982) Basic Outside Plant Engineering (June 1982) Special Skills: Proficient in AUTOCAD 2004/2007-2014, Microstation(ICGS/IDDS
Posting) and MS Visio. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|