From: route@monster.com
Sent: Tuesday, March 22, 2016 11:01 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Gis Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Mitch Green
Bakersfield,
CA 93312 (504)
289-3945 Email: mjgreen41@yahoo.com OBJECTIVE
QUALIFICATIONS AutoCAD 2013,
CADworx 2013 Plant professional Cadworx 2013 Equipment, Microsoft Office
Suite; Excel, Outlook, Word, PowerPoint, Arch GIS. Conflict resolution,
strong client relations, organizational skills, energetic work attitude,
creative problem solver, listening skills, excellent communicator, fast
learner. EDUCATION Bakersfield
College, Bakersfield, CA Currently
enrolled in Industrial Drawing Associates Program EMPLOYMENT March 2014
– January 2015 Fluor/Brinderson – Piping Designer/CAD operator Created
P&ID drawings for AWTs, Splitigators, pressure vessels, and test
separators from field walks to meet project requirements. Created
appurtenance drawings for oil separators, slop oil tanks, gas boots, and
knockout vessels to meet project requirements and client standards. Created
tank detail drawings to meet project requirements and client standards.
Created hazardous area classification drawings, area lighting plans, cable
tray routing plans, electrical load schedules, MCC elevation drawings, motor
schematics, and lighting wiring diagrams, VFD schematics, analog and discrete
junction box drawings, and one line diagrams. Familiar with
Chevron and Vintage/Oxy standard. May 2013 –
March 2014 Nestle/Dreyers – Piping Designer Plant walk
down to develop as-built P&IDs for plant utilities to include domestic
hot and cold, water, compressed air, steam natural gas, chocolate, clean in
place, and roof top ammonia system. Also responsible for tagging all system
valves. Overseeing drafting and QA for projects to adhere to schedule. March 2013
– May 2013 A-C Electric Company – Drafter Assigned to
solar energy residential group. Prepared presentation packages incorporating
Google earth images with AutoCAD overlays to show design of solar panels
needed for each residential client. Also included standard and detail
drawings to suit each client along with creating the necessary one line
diagrams for each job. June 2012 –
March 2013 Processes Unlimited International, Inc – Drafter
I Field as
building of AWTs at Chevron Kern River. As-building existing P&IDS and
creating new ones as needed, incorporating latest Chevron P&ID standards.
Working closely with the project lead to deliver packages to client in
compliance with schedule. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|