Richard Vaughan, PMP 4587
Tanner Peak Trail, Brighton, CO 80601 R.vaughan1978@gmail.com
| 720-253-3121 | www.linkedin.com/in/rvaughan1/ Career Summary: Project Manager Seeking a position as a Project Manager within a
team based environment ·
Certified Project Management Professional, Certified Scrum Master ·
15 years experience in project driven engineering departments,
including ISO-9000 environments. Expert level CAD skills. ·
Proficient at coordinating vendors, manufacturing assets, design
teams, and virtual teams across multiple projects. ·
Extensive change control experience including REV control, ECR
management, drawing releases and internal change management. ·
Adept at problem solving, requirement writing, organization, and
communication management. ·
Experienced with Microsoft Project, Word, Excel, Visual Manufacturing,
and web based document management such as Google docs. Experience guiding
projects from conception to shipment. Including ECR, RFI, as-built
documentation, and OEM manuals Education Bachelor of Science in Business and Project
Management, University of Phoenix: 2013
with Honors ·
Completed courses in risk management, portfolio management, PMI
standards and PMBOK integration, procurement, project planning and earned
value management, project estimating and control. Associates of Applied science degree in
Mechanical Drafting, Westwood College: 1997 ·
Received training in Geometric dimensioning and tolerancing (ANSI/ASME
Y14.5 1994), and AutoCad. Experience Material Handling Designer Steel Storage Systems Inc.: March 2011-December
2012, September 2005-June 2008. Designed and detailed material handling
equipment, including conveyor systems, and rack storage units. All products
were made from structural steel elements. ·
Lead designer for 140+ projects and served as project head for most
system designs. ·
Coordinated with the shop, sales team, and engineering elements to design,
and deliver projects on time. ·
Crated BOM’s and material takeoff estimates. ·
Tracked project’s progress through fabrication, delivery and
installation. ·
Trained new employees in general project flow, drawing standards, design
requirements, document control, bill of material creation and company
practices. ·
Reviewed designs to meet OSHA and other safety requirements. ·
Routed projects through manufacturing and inventory control using the
Visual Manufacturing ERP system. ·
Performed QA checks on equipment and parts as needed. ·
Created approval drawings and participated in quote process to
establish project guidelines and requirements. Document Control Drafter Mark VII: Nov 2008–July 2009, July 2010-November
2010. Created design documentation and release drawings for new carwash
designs. ·
Assisted engineers in drawing state of the art proto-type car wash
equipment. ·
Certified drawings as completed and ready for release as part of the
project release process. ·
Created a new digital drawing distribution and control process. ·
Created bills of materials and entered them into the BPCS material
planning system. ·
Managed drawing distribution to appropriate departments as new
drawings were updated and released. Commercial Railcar Designer Colorado Railcar: June 2008 – November 2008.
Designed and detailed parts and components for commercial railcar project. ·
Created design and layout of key steel railcar components ·
Evaluated manufacturing processes and detailing of all parts. ·
Delegated drawing and design responsibilities according to ability and
project needs. ·
Performed material planning for assigned sections of railcar including
steel and trim components. ·
Led drawing release and revision control in an ISO-9000 environment. Project Manager/Drafter Denver Water; Property Management group: June
2004-September 2005. Led a project to document and register all easement
agreements that had been lost or misfiled. ·
Managed all program assets including project timeline and resources. ·
Created filing and documentation processes for easement drawings and
pertinent contract information. ·
Entered all easements into GIS ArcMap system and properly filed
associated documentation. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|