From: route@monster.com
Sent: Tuesday, March 22, 2016 11:01 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Gis Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUME OF JAMES R. KYLE JAMES R. KYLE 112 Goldenrod Drive Hercules, CA 94547 (510) 282-3864 (cell) (510) 245-2104 (home) Email: jrkyle@hotmail.com Abilities: AutoCAD Experience: AutoCAD 2010, AutoCAD 2009, LDT 8 and Civil
3D Created 3-D terrain models including details for landscaping, plant lists
and schedules. Worked with X-refs in transportation and
landscaping. Modified contour maps, created 3-D site plans. I am
experienced in working with paper space and model space. Engineering Content Management System: Buzzsaw, Teamwork Management Experience: Managed and supervised drafting department
(IT/Hamilton Army Airfield). Managed project schedules and deadlines. Software Experience: AutoCAD Architecture 2009, Spanner, ArchiCAD, Civil
3D, AutoCAD 2008, LDT 8, Carlson X-port, Softdesk, LDD, Microstation, Word,
Excel, and PhotoShop. WORK EXPERIENCE: F.E. JORDAN ASSOCIATES AutoCAD Drafter/Engineering
Technician
July
2011– Present Created and modified plans for the
MTA Central Subway Project (Moscone Center Station). in the Civil Engineering
Department. Created and modified Demolition Plans, Grading and Drainage Plans
and Sections, and Detail Sheets, using AutoCAD Civil 3D 2012. . AURIGA CORP. AutoCAD Drafter/Engineering
Technician
August
2011–July 2012 Created and modified plans for the MTA
Central Subway Project (DP3) Systems Design for electrical layout throughout
the entire tunnel. This included the Telephone (CO), Electrical Lighting
(EL), Electrical Power (EP), Traffic Signals (ET), Overhead Contact Systems
(OV), and Traction Power (TP). Tunnel Layout, Station Plans, Equipment
Layout, Panel Schedules, Circuit Layouts, Sections, and Detail Sheets, using
AutoCAD Civil 3D 2012. . ITSI AutoCAD Drafter/Engineering
Technician
May
2011–June 2011 Created and modified plans for the
Civil Engineering Department. Created and modified Cover Sheet, Title Sheet,
Site Location Maps, Demolition Plans, Electrical Plans, Detail Sheets, Paving
Plans, Existing and Proposed Site Plans using AutoCAD Civil 3D 2011 and 2012.
Using Civil 3D 2011-2012, Existing topographic Maps would be created by
inserting survey data, which intern would be used to create finished grading
plans. PES ENVIRONMENTAL INC. AutoCAD Drafter/Graphics
Technician
November
2009–December 2009 Created and modified plans for the
Graphics Department. Created and modified Cover Sheet, Title Sheet, Site
Location Maps, Sample Location Maps, Soil Contamination Maps, Sanitary Sewer
Plans, Storm Drain Layouts, Demolition Plans, Existing and Proposed Site
Plans using AutoCAD Map. Also created and modified Pump Station and Control
Panel Layouts. Cad files would be converted to pdf file format and uploaded
to the companies transfer folder to be reviewed by the project manager in the
Seattle office. Downloaded adobe pdf file corrections of the Cad files
made by the Seattle office to be revised on the Cad files in the Novato
office. ALLIED CONTAINER SYSTEMS Computer Drafter/Engineering
Technician
July
2009–August 2009 Created and modified Architectural,
Civil, and Structural Engineering Plans. Created and modified Cover sheets,
General Notes and Specifications sheets, Plan and Elevation sheets,
Foundation Plan and Details sheets, Elevations and Sections sheets. AutoCAD 2010
was used to modify plans. ILS ASSOCIATES INC. Computer Drafter/Engineering
Technician
April
2003–August 2008 Created and modified topographic maps using LDT 8,
Civil 3D and Carlson X-port from survey data shot in the field by the survey
crew. Using the survey data, contour maps, baseline alignments to create plan
and profile sheets and cross-sections were created. Created site plans and
used JPEG, TIFF, Bitmaps and GIS files for site plan overlays. Created and
modified site plans, drainage plans, erosion control plans, schematic utility
plans, notes and details. Engineering Content Management System Buzzsaw and
Teamwork were used in conjunction with the LDT 8 to help manage updated files.
JWD GROUP Computer Drafter/Designer
September
2000—June 2002 Created and modified plans for the
Civil/Planning Department specializing in Shipping Port Design. Created and
modified site plans, elevation plans, and cross-sections used for
construction. Created gate details consisting of entrance/exit gates layouts,
pre-check and scale area. AMERITAC Computer Drafter/Designer
June 2000—July 2000 Created and modified plans for the Concord Naval
Weapons Station Revitalization Project. Created floor plans to be used in the
field to survey piping layouts in buildings onsite. The field data would be
added to the drawings using Acad 2000. DMJM Computer Drafter/Designer
February
2000—April 2000 Created and modified plans for the California
Facilities Study Project (Bay Area Team). Recreated hand-drawn floor plans of
the different courtrooms in CAD drawings. Used blueprints and raster images
as a reference. The CAD drawings were used to label and take square footage
of every room for the following counties: Alameda, Contra Costa, Marin,
Monterey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa
Cruz, Solano, and Sonoma. SABAH INTERNATIONAL
Computer Drafter/Designer
April 1999—February 2000 Created and modified fire protection plans for
detection and suppression projects. Created cover sheets, general note
sheets, riser diagrams, floor plans, isometric piping plans, wiring diagrams
and detail sheets. Modified as-builts for suppression and detection
layouts. IT CORPORATION/HAMILTON ARMY AIRFIELD Environmental Project CAD
Designer
December 1995—April 1999 Created and modified site maps, sample location maps,
soil contamination maps, sanitary sewer line plans, storm drain layouts,
levee and easement plans, contour and excavation plans, all onsite, as
information was made available by engineers, geologists and surveyors.
Projects included: BRAC
Project Reports: ·
RI/FS Remediation Plans ·
POL Hill ·
Outparcel A-4 ·
Northern Perimeter Fuel Line ·
Levee Easement Construction Plans GSA
Project Reports: ·
Phase I & Phase II Stockpile
Remediation Conceptual Project Plan IT CORPORATION
Environmental Project CAD Designer
August 1995—December 1995 Created and modified soil boring logs, site
presentation maps, soil sample location maps, cross-sections, detail maps and
excavation maps. ENVIRON INTERNATIONAL CORPORATION
AutoCAD
Drafter
July 1995—August 1995 For the Emeryville Redevelopment
Project, created and modified chemical concentration maps, site plans, soil
boring logs and cross-sections, as well as digitized contour maps for
presentation purposes. WEISS ASSOCIATES
AutoCAD Drafter
May 1995— May 1995 Created and modified site maps, cross-sections and
soil sample location maps. GREINER, INC.
1991—1994 AutoCAD Drafter Fulfilled requirements to make a variety of changes
to landscaping plans, transportation plans, as well as waster management
plans, either by using manual drafting methods or AutoCAD R12. Landscape Architecture: Skilled in pipe sizing, creating irrigation plans and
detail sheets for job requirements. Developed preliminary plant list
and plant schedules including area takeoffs for space availability and
planting plans. Experienced in creating title sheets for a variety of
projects, as well as creating landscape details using AutoCAD. Site Planning: Performed takeoffs, created slope maps and cut fills on contour
maps. Created and modified 3-D contour maps in AutoCAD. Water Resource/Water Management: Created and modified pump station plans and pump
station designs. Performed water flow calculations, modified site
plans, pump station layouts and piping in AutoCAD. Transportation Planning: Designed freeway presentations for meetings.
Created and modified layouts for stoplights and street sensors, as well as
modifying street intersections, roads and highways. EDUCATION: 1.
Drafting and AutoCAD at Bay Area Engineering Societies Committee for MANPOWER
Training, Inc., 2.
Contra Costa College. 3.
Certificate of Completion of Microstation Training from CORDAX. 4.
Martinez Technology Education Center, Autodesk Training Center: AutoCAD
2009 Successfully
completed certification studies for AutoCAD 2009 software. 2d drawing topics
included model space drawing for mechanical and architectural drafting
covering elevations and isometric views. The use of efficiency tools such as
the ribbon interface, blocks, attributes, layer management, external
references, area calculations, object snaps, and styles. Paper space topics
included the use of viewports, annotations, and tables. 3d topics included
extrusions, solids editing, Boolean operations, visual styles, ucs
management, materials application and rendering. AutoCAD
Architecture 2009: Course
of studies included the use and management of intelligent architectural
objects such as walls, floors, roofs, stairs, structural members, door and
window assemblies, and walk-thru animation. Certificate
of Completion for Computer Software Essentials: Course
of studies included Microsoft Office 2007, Windows XP, Word, Excel, and
PowerPoint. Certificate
of Completion for Adobe Illustrator Certificate
of Completion for Adobe Photoshop CS3 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
|