From:                              route@monster.com

Sent:                               Tuesday, March 22, 2016 11:00 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Gis Drafter

 

This resume has been forwarded to you at the request of Monster User xapeix03

Michael Mussari 

Last updated:  04/22/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Ladera Ranch, CA  92694
US

Mobile: 702-326-7509   
mmuss96@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Lead Desginer/ Land Surveyor

Resume Value: due2ceh5b47uqu2h   

  

 

Michael Mussari
79 STRAWFLOWER STREET
LADERA RANCH, CALIFORNIA 92694
C: (702) 326-7509 Email: mmuss96@gmail.com
ENGINEERING DESIGNER/ LAND SURVEYOR
AutoCAD GPS Survey Design/Drafting
Results-oriented Designer/Drafter and Land Surveyor with over 10 years of office and field experience in AutoCAD,
natural gas pipeline design, land surveying, mapping, drafting, and supervising. Detail-oriented with a commitment
to high standards and a proven ability to build and maintain excellent client relationships. Highly motivated, quick
learner, results oriented style, seeks challenges, and solutions to complex problems.
§ AutoCAD LD 2007/ AutoCAD Civil 3D 2010-13/LDD
§ Gas Pipeline Design/Drafting
§ Residential Subdivision Surveys & Design
§ Energy Projects
Areas of Expertise
§ GPS Surveys/ Field Operations
§ Legal Descriptions & Proposals
§ Construction Knowledge
§ Supervising & Scheduling
Professional Experience
MARMAC FIELD SERVICES, Costa Mesa, California
Lead Designer
Create plan, profile, isometric and single line gas/petroleum pipeline drawings using AutoCAD and Bentley
MicroStation. Research data and reference client diagrams, land survey information/recorded maps,
imagery/mapping systems, sketches, and examples by engineering leads to aid in design of projects. Support and
assist Electrical Department with design; and Land Survey Division with field and office duties.
Key Accomplishments:
§ Provide Southwest Gas Corporation with design services for their General Engineering Contract. This includes
§ Performed AutoCAD design and plan & profile drawings for the relocation of pipes for Kinder Morgan projects.
§ Perform Topographic Survey for major oil refinery, using Topcon equipment.
§ Supervise CAD Technicians and review design work.
determining existing utility locations/conflicts, layout and drafting of proposed pipelines and facilities.
TRC SOLUTIONS, Henderson, Nevada
Designer
Perform AutoCAD drafting, mapping, and engineering calculations to support planning of civil, structural,
environmental and natural gas pipeline projects. Create plan & profile drawings using recorded survey maps,
sketches, imagery, and examples by engineering leads. Meet with external customers to develop preliminary and
final design plans. Support and assist Land Survey Division with field and office duties, including legal descriptions.
Assist and support other TRC offices with structural, environmental, and land survey duties.
Key Accomplishments:
§ Provided complete CAD drafting and technical support for various pipeline projects for Southwest Gas
Corporation, including developing project land base from existing reference sources, determining existing utility
locations/ conflicts, layout, and drafting of proposed pipeline facilities and development of any details and/or
special exhibits required for a project.
11/07 – 10/11
Engineering, consulting, and construction management firm that provides integrated services to the environmental,
energy, infrastructure, and real estate markets.
11/11 – Present
Marmac Field Services is a privately held corporation that provides engineering and design services, mapping, rightof-way
procurement, project support and construction management.
§ Lead AutoCAD Technician for Florida Gas Transmission Project. The TRC Las Vegas Pipeline Engineering
Group developed over 300-wetland delineation plan and profile exhibits for permit drawing creation from existing
GIS aerial topography references to support the filing documents for required wetland mitigation.
§ Support in drafting of solar parking canopies for the Las Vegas National Guard.
TOLL BROTHERS / EASTERN STATES ENGINEERING, Las Vegas, Nevada
§ Support in design of Bluff Creek Gas Transmission Station, which included compressor buildings, auxiliary
buildings, and pipeline design.
05/06 - 10/07
A Fortune 1000 company, Toll Brothers is the USA’s leading builder of luxury homes.
Land Survey Coordinator
Research and interpret source documentation, including engineering plans, correspondence, legal documents,
titles, deeds, construction plans, and maps. Supervise, schedule & assist three field crews. Produce Plot Plans;
Process field notes and reduce GPS, RTK, and conventional field data. Upload and download data and maintain
existing data in ACAD and TGO working files. Provide crew with required data to perform specific project. Make
manual/visual checks of preliminary data & inspection of final products. Use and application of Topcon GPS and
Trimble GPS. Maintain accurate records and documentation. Maintained excellent client relations.
Key Accomplishments:
§ Participated in set-up and establishment of Toll Brothers Las Vegas Survey Division.
§ Conducted complete construction staking of roadways, perimeter walls, building structures, and utilities for
Madison Grove Residential Subdivision at Providence Master Plan, which consisted of over 200 lots.
V-POINT, Henderson, Nevada (Purchased by TRC Solutions)
Survey Technician
Aid in analysis, preparation, and review of Parcel & Final Maps, Record of Survey, ALTA Maps, legal descriptions,
topographic mapping, and survey related exhibits. Import data into ACAD and TGO working files & perform survey
calculations. Research and analyze survey related documents. Schedule survey crews, field experience, and
general survey staff support.
Key Accomplishments:
n
n
Performed survey calculations for survey crews and survey mapping, as well as prepared legal descriptions for
several phases of the Foothills Subdivision at MacDonald Ranch Master Plan.
Provided survey services for the Clark County Water Reclamation District, Pipeline Rehabilitation Project and for
the Clark County Water Reclamation District, Gilespie Street Sewer Project. This project consisted of providing
aerial targets, connection points for potholing, verified elevations, and centerline alignments, and performed rightof-way
mapping.
n
Conducted preliminary survey functions such as topographic surveying, boundary, and alignment and
construction staking of roadways, building structures, perimeter walls, and utilities for Mountain Falls Master Plan
in Pahrump, Nevada. This 2,700-acre development consisted of multi-family and single-family residential
subdivisions, as well as golf course estates, a retirement community and commercial properties.
KERRY T. HOWE ENGINEERING LTD., St. Catharine’s, Ontario, Canada
Land Survey Party Chief
Perform construction staking, topographic, boundary, and traverse surveys. Perform survey calculations, field note
preparation, cut sheets, and evaluate engineering drawings. Record measurements & reduced field notes.
Application and use of Geodimeter. Supervise instrument man.
08/02 - 09/03
A consulting engineering firm specializing in land development engineering, municipal engineering, roads, bridges
and culverts, and acoustical studies.
11/03 – 05/06
Engineering, consulting, and construction management firm that provides integrated services to the environmental,
energy, infrastructure, and real estate markets.
Page 2
Key Accomplishments:
§ Provided complete construction staking of roadways, building structures, and utilities of the 220 lot Pallek Farm
§ Performed topographic surveys of Lower Bridge abutment for future analysis of lead contamination in the
Niagara Gorge.
Subdivision in Niagara-on-the-Lake, Ontario.
GDX AUTOMOTIVE, Welland, Ontario, Canada
Joining Technician
Press operation & assembling of weather stripping for automobiles. Parts inspection and advising on quality of
weather stripping. Train new staff in joining process.
Key Accomplishments:
§ Met daily quotas for production of sealing products for GMC trucks.
UPPER CANADA CONSULTANTS, St. Catharine’s, Ontario, Canada
Land Survey Instrument Technician (Rodman)
Set up and operated various types of survey equipment. Record measurements & reduced field notes. Perform
survey calculations and acted as a rod person. Evaluate information on engineering drawings & survey sketches.
Key Accomplishments:
§ Assisted in construction staking of Thorold Stone Road Expansion Bridge.
04/00 - 02/02
Designs, develops, markets, and manufactures sealing systems for dynamic and static automotive applications.
The company offers sealing products, including door weather-strips, inner and outer belt strips, secondary seals,
and quarter window.
05/98 – 04/00
Provides project management, construction services, water resources engineering, civil and municipal engineering,
and surveying.
Education
MOHAWK COLLEGE, Ontario, Canada
Majors: Civil Engineering Technology
NIAGARA COLLEGE, Ontario, Canada
Courses: AutoCAD I & II
COLLEGE OF SOUTHERN NEVADA, Nevada
Courses: Civil Survey Design, Principles of Land Surveying
ENVIRONMENTAL SYSTEMS RESEARCH INSTITUTE, INC. (ESRI)www.esri.com
Training Seminar: Working with CAD Data in ArcGIS 9.2
ARCHWAY SYSTEMS, INC., California
Training Class (3 DAY): Bentley MicroStation for AutoCAD Users
01/2012
09/1987-12/1991
09/2002-05/2003
01/2005-12/2005
08/2010
Reply to: (702) 326-7509 Email: mmuss96@gmail.com
Page 3



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

7+ to 10 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-CA-Orange County

Relocate:

Yes

Willingness to travel:

Up to 75% travel