From: route@monster.com
Sent: Thursday, September 10, 2015 3:47 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael Mack 222 Paradise Way.
Red Oak, TX · 404-960-9577 · mack1inc76@gmail.com SKILLS
Field
Engineer
05/2015 – 08/2015 Tuckertech / Alcatel
Lucent -
VERIZON
Washington state §
Verizon CSM V1 –
V2 card swaps §
Linked to 7705
SAR router to verify chassis with console cables §
Removed setting
from V1 with usb card readers and placed settings on the new card V2.
Waited to site to green up and take traffic. §
Maintenance
Window Integrator/
Commissioner/ NSN BTS –
ERICSSON
11/2014 - 5/2015 Fusion Solutions/
Spectrum - TMOBILE Kansas City §
Commissioned and
integrated sites for T-Mobile L700 with the L1900 existing radios. §
Trouble shot
radios (fibers) for connection to be configured for commissioning §
Installation,
Integration, Operation, Maintenance, Troubleshooting, and Optimization of any
and all Cell Site Equipment Ericsson and Alcatel-Lucent §
Integration,
Testing, Operation, and Troubleshooting of Network Hardware and Interconnect
Facilities including Alcatel Lucent 7705’s routers, EBH, Fiber, Fujitsu 9500,
SAR 18’s and 8’s, Aviat Microwave §
Re-routing the
RF cables. §
Clearing of all
the alarms, which are affecting network efficiency. §
Installation,
commissioning and swapping of equipment for L700, L1800, L2300, U2100
technologies. Integrator/
Commissioner/ NSN BTS/ TMO RA
rollout
8/2014 – 11/2014 Lemcon/
Tanint - TMOBILE Texas
market (Dallas/ Austin/ San Antonio) § Responsible for the installation,
integration, and commissioning and cutover of TMOBILE 4G Mobile Broadband
Network in the Dallas Market. I configured and commissioned BTS Cabinets
using BTS site manager § Commissioned sites for the 2G and
4G shared mode § Performed sweep test on antenna
lines (Anritsu). Performed closeout packages to be turned into the PM with
pictures of site and all components/ work done § Maintenance window work for the
cutover, installation was performed in the day § Performed various tasks
related to the installation and maintenance of GSM/UMTS/LTE Ericsson RBS BTS,
or Lucent/Alcatel equipment and accessories. This included Radio, Router, and
AC/DC Power Equipment §
Working on L700
up gradation of sites including escalation work for L2300, L1800, U900/G900
and U2100 technologies. §
Replacement of
FSME with FSMF and installing FPFD, FBBA and FBBC modules. §
L2300 integration,
commissioning and Connectivity Test. . Integrator/
Commissioner/ NSN BTS/ Modernization
1/2014 – 8/2014 Versacom / T mobile
Modernization - NW Arkansas § Install, Commissioning,
integrating, System verification & acceptance for Nokia BTS/LTE 2G Flexi
platform Network Element. perform advance troubleshooting , able to
follow NSN NED documentation and independently resolve project issues § Day work § Performing testing of RF systems
for RL, DTF, VSWR and PIM § Commissioning, integrating, System
verification & acceptance and troubleshooting for NSN GERAN Flexi BTS
hardware ( ESMB, FXFA, FXFB) § Deep understanding of Antenna Line
configuration and connectivity as well as Flexi BTS/LTE Feature set ( Rx
diversity / Antenna Line sharing (TMA’s and Di-plexors) § Have working experience for the
NOKIA Flexi BTS/LTE Installation, Commissioning & Integration, Technical
support, Validation, FOA and Project Technical support specific task and
closeout packets § Have good understanding about the BSC / RNC Field Tech/ LTE/
EF&I10/2013 – 1/2014 Tucker Tech/
Alcatel Lucent - AT&T
- New York, NY; Oakland, California § Worked the Utah, Idaho, Oklahoma
markets doing the LTE eCEM to bCEM upgrade, also changing out the RUC fan
component. § Commissioned and Integrated LTE
(EnodeB) sites in the SLC market. Drive tested sites with the provided
phones §
Installed UMTS
UCU III cards, swaps or adds, worked with the RITC to fully integrate and
accept the growth sites, including all file loads §
Managed 2
markets at the same time (Philly and NY) alone, doing UMTS UCU’s adds or UCU
CN’s. §
Provided support
and trained techs in SLC/ Boise to do the CN work and completed Boise for the
UMTS UCU add wo §
Required tools:
ALU: LA6; LR13; NEM §
Installed the
new enobeB controller board in test markets §
Excellent verbal
and written skills to coordinate with the market PM’s and ALU
representatives; (submitting reports in a timely manner and
corresponding a schedule or plan to implement or get the project done.) §
Carrier
additions 2C and 3C Field Tech/ LTE/
EF&I
3/2013 – 10/2013 Avion Systems/
Alcatel Lucent – Verizon/ AT&T
- Atlanta, GA §
Worked the
Minnesota/ El Paso/Idaho/ Colorado markets, doing the LTE eCEM to bCEM
upgrade, also changing out the RUC CN fan. §
Worked with the
NOC to fully integrate and accept the site including all file loads, drive
testing, data testing and other duties to ensure the site is completely ready
for ATP. §
Responsible for
inspection of equipment and interconnection between equipment to ensure all
equipment is communicating properly and troubleshoot equipment as necessary
to clear all alarms. §
Responsible for
inspection of the site to ensure that functional call testing data is
acceptable and within specifications. §
Test the fiber,
GPS, and channel cards inside the digital unit §
Diagnose alarms
with the switch and on MMBS, replace defective equipment and clear the alarm
state with regards to alarms between the MMBS and the switch §
Managed as
market Lead and trained a team of 3 – 5 people in El Paso and New Jersey to
install bCEM/ RUC procedures, and how to properly check into a site (IVR) and
access sites § Required tools: ALU:
LA6; LR13; NEM (Smart Laptop) § Submitted reports in a timely
manner and created BOM for project coordination Field Tech/ Lead
8/2011 – 2015 Field Solutions/
Desktop Support - Ironbow - Columbus, GA §
Installing and
imaging 250 plus units for Windows 7 deployments to various medical site
locations around Fort Benning. Upgrading the ALTHA refresh §
Lead Tech, kept
logs for inventory and time management §
SCCM and Desktop
Deployment knowledge §
Coordinated the
plan of action for materials to be distributed and ordered; BOM Field
Solutions/Technical support - NCR – Atlanta, Georgia § Installed POS systems in
Walmarts, Home Depots, and Starbucks. §
Have prior networking, cabling and routing
experience as well as excellent oral communication and customer service
skills. §
Provided onsite support for NCR Lead Tech to
complete the SSCO/ SCO installation. § Traveled site to site; GA, AL,
SC Field Tech/ Lead Field Solutions/
Technical Support - Fujitsu - Dallas, Texas § Traveled site to
site, installing and setting up POS and Back Office Controllers for Limited
Brands, i.e. Bath and Body Works, Victoria Secrets. §
Managed an
assigned assistant for each job site. Also closed out task for assistant upon
completion. §
Networking,
cabling and routing experience as well as excellent oral communication and
customer service skills. §
Lead in windows
client deployment and migraton RF Field Technician
II 04/2010- 07/2011 Clearwire -
Atlanta, GA. §
Responsible for
the installation, integration, and commissioning of Clearwire 4G Mobile
Broadband Network in the Atlanta Market. I configured and commissioned
Motorola BCU I & II and Samsung (PRAS/CRAS & FRAS) Wi-MAX BTS
Cabinets using Samsung (WSM/Ace-MAN) Network Management System, and
integrated Backhaul Transport Systems which included §
Ciena WWP-311v
Switch, Ceterus-1530 T-1/DS3 Interface, Dragonwave & Motorola/Orthogon
PTP600 Microwave Radios. I also installed remote power systems Site Boss
(570) / Eltek Valere, and (AC-400I2-H) AC Units. I am fully proficient and
knowledgeable in troubleshooting all components of T1 Architecture, RF &
Microwave Interference Levels and Path Alignment. §
Installation,
integration, commissioning, and maintenance of NEC IDU/ ODU and Aviat microwave
equipment, Accedian NID, Ciena 3920 and 3940 switches, and Zyxel/Zy-Wall
firewall equipment. I installed equipment, laced wiring, loaded local files,
and commissioned new and maintained existing sites and equipment. . I
responded to all NOC call outs & outages within a specified area to
resolve system problems, and determine the cause of equipment failure using
various types of software programs, and complex test equipment such as
Secure-CRT, Ocular IP Network Management System, Link Watch, Anritsu (Site
Master), and T-BERDTest Pad. Network
Technician 06/2007- 04/2010 Verizon FIOS (Volt
Info) - Tampa, Fl. § Responsibilities included installation, maintenance, and
integration, of fiber based ONT equipment at customers’ premise and turn-up
of data, video, and/or voice services. I am knowledgeable of all components
of the Vz fiber network from the Hub (FTTH), the ONT (FTP), to the set-up of
the customer premises equipment. § I installed the ONT, ran/installed all wiring necessary
for power and connectivity to the router/ gateway, NID, and/or STB’s. I
supported cell site implementation rollout of the up and coming 4G (LTE)
conversion/ rip & replace build out. I have a thorough
understanding of RF video provisioning, computer networking (TCP/IP, Wi-Fi,
Router configuration, voice/VoIP set-up) and UTP wiring. Providing
reliability of installation and excellent customer education of services
installed. Cut-Over
Technician & Installer 11/2005- 05/2007 Comcast Cable-
OSP Atlanta, Ga §
Responsible for
node to node installation, maintenance, replace and repair of trunk line taps
and drops. I inspected, tested and analyzed coax nodes, taps, and drops, then
repairing or replacing equipment per Comcast’s requirements. §
I am
knowledgeable with the use of the SDA5000, the Ebtech SWIZZ, and other coax
testing equipment and RF Engineering aspects of cable construction,
troubleshooting RF interference levels (ingress and outgress) testing. Experience §
Proficient in
maintaining networks consisting of hardware, Modems, Switches, Routers,
Network Elements §
Troubleshoot
Carrier Class Networks: Transport, IP, RF, WiMAX circuits’ networks §
UMTS, iDen,
CDMA, DOM A, and EVDO §
Network Integration
Engineer (CLEARWIRE, VERIZON, SPRINT and AT&T; ( Ericsson, Alcatel
Lucent) §
Power fail
testing, light level testing, RSL testing, and speed testing §
Trained for
Installing and Commissioning for 3900 and 6500 LTE, 4G site, ZTE SITES §
Hardware/
Software Commissioning of Huawei BTS 3800 §
Upgrading and
integration of BBU 3900, RRU3801e. §
Loading of
Configuration Script file using Huawei LMT Software §
Ciena (WWP) 311V
installation and commissioning with remote verification § CDMA PMSC, CSVS, UMTS,VSE, TRF02,
R4, SDM to CBM, CNM integration § ProComm, FTP, Telnet of enclosure
rack configuration via Ciena (WWP) 311V for all cabinet devices § IP network node commissioning and
verification § Linux Run, lace, connect, and
terminate coax, BNC, LCC, and RJ45, RJ11, and cables § Writing and running scripts
MS-DOS, Unix, § Installing DC rectifier system
including battery string § Terminate power and fibers § Install, commission, turn-up, and
testing of 4G WiMAX § HP Servers, Cisco routers and
switches § Configuration of Cisco switches
and routers § Knowledge and hands-on experience
as GSM BSS/CDMA BSS /OMCR Engineer, Ericsson OMT/LMT Software, Huawei
M2000/LMT, ZTE ZXC10 NMS Software § Indoor/Outdoor Installation,
Commissioning and Integration of Ericsson RBS 2G/3G Product Family such as
RBS 2202, 2206, 2106, 2216, 2116, 3202, 3206, 6601, 6201 LTE Cabinets § NSN BTS/ TMO L700 & 1900 § CSM V1/V2 SAR 7705 Computer Skills Anritsu software
tools- HHST, Antenna Sweep Equipment, Motorola PtP link
planner software, EMS electrical down tilt software, RFS optimizer software,
Andrew, ATC 200 software, Access, Visio, Word, Excel, Adobe, MS Windows &
Linux operating systems, Windows 7 migration and SCCM |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|