From:                              route@monster.com

Sent:                               Thursday, September 10, 2015 3:45 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Joepersie Barasana 

Last updated:  06/06/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: JCBarsana

Resume Value: mq8gsjvbp2fir8ym   

  

 



JOEPERSIE CAMO BARSANA

Fujairah, United Arab Emirates

P. O. Box 14

Contact Nos.: +971 503242240 / 050 2803672

E-Mail Address:   joe_per102@yahoo.com

PASSPORT No.:   XX0911271 

Valid Driver’s License              : UAE & Philippine Driver’s License

 

OCCUPATIONAL OBJECTIVE

             

To obtain a position that suited to my qualification and to be able to impart my knowledge and skills that would contribute success to the company.

 

HIGHLIGHTS OF QUALIFICATION

 

v      Planning & Designing of FTTx Multi Services Access Network to accommodate different transmission technologies like GPON, xDSL, MSAN’, Access Network Technologies.

v      Planning & Designing of Fiber to the HOME (FTTH) Access Network utilizing Gigabit Passive Optical Network (GPON) FTTX Technology to provide the triple-play-services (voice, video & data) and future Broadband Requirements.

v      Optimum Planning & Designing of Next Generation Long Haul and Metro (Junction Network) between exchanges to carry the Core Network Transmission.

v      External Network Planning & Designing of Telecom-Infrastructure-Development for Outside Plant Civil Works to cater Optical Fiber Access Network with circuit diversity & redundancy.

v      Project Management of Optical Network Engineering Construction, Operation & Maintenance to ensure reliability, service availability and fault clearing service level.

v      Coordination with subcontractor & other departments to monitor the issued project, project workflow and status for the completion of project without any delay and taking appropriate actions with stipulated time.

v      Proficient in Telecom designing techniques using design tools such as Geographic-Information-System (GIS), Telcordia (Network Engineer 4/5).

v      Experience in acceptance testing & commissioning of Optical Network Transmission Network, GPON passive Multi Services Access architecture, GPON active Broadband Access equipment and Fiber Network Management.

v      Planning & Designing of Structured Cabling system to cater GPON FTTH services.

v      Expert in Operating a variety of Fiber Optic equipments such as Optical Time Domain Reflectometer (OTDR), Fusion Machine, Power Meter.

v      Maintenance for copper and fiber cable.

 

WORK EXPERIENCE

 

 

Company:              BUILDMAX LLC (CONTRUCTOR ETISALAT)

Office#509 5th Floor Platinum Business Center

P.O. Box: 113033

AL NAHDA 2, DUBAI, U.A.E.

 

Position:              NETWORK PLANNING DESIGNER

 

Job Description:

v      Optimum Planning & Designing of Wired-line Inside Plant (ISP) and Outside Plant (OSP) of FTTx Network utilizing the Point-to-Multi Point Gigabit Passive Optical Network (GPON) for the provision of info-communications services, Triple Play (voice, video, data) within designated exchanges.

v      Planning & Designing Fiber-to-the-Home (FTTH) Multi Services Access & Transport Network using design tools like Telecordia-GIS, Network Engineer 5, (Arc_GIS).

v      Planning & Designing of New Generation Long Haul Transport Network between exchanges with Main & Diversity route to carry the Core Network Transmission (GPON,-OLT’s, IP-NGDLC’s, UMTS, IP-VPN & GSM requirements.)

v      Provide Plan and Design of GPON Network for Civil Works infrastructure such as underground pipeline / ducting system, hand hole, manhole, direct buried, trenching, road crossings and aerial infrastructure in order to meet the circuit diversity and redundancy of Transport Network  & Multi Services Access Network  to congregate present and future requirements of ETISALAT.

v      Provide FTTx GPON point-to-Multi-Point architecture plan network reliability and diversity within the exchanges areas and to upgrade the existing infrastructure as and when required.

v      Conducted site survey in order to explore creative solutions considering the physical condition of the site for the provision of civil works connectivity, fiber optic route link diversity, redundancy and circuitry of FO Network to meet quality design, project execution plan and effective cost estimate.

v      Perform study of Network plan for migration and upgrading the infrastructure network from the existing copper cable to GPON – FTTx  Technology.

v      Prepared work order estimate for Fiber Optic development on schedule of works for cable, civil, splicing, with technical details drawings  (plant map, key map, SLD, schematic, block diagram, CPD, MCD) for the proposed & existing network plants of ETISALAT and issue to the Contractors for project implementation and execution.

v      Coordinate with other section for the work progress and project status to ensure that service can be provided without delay and taking appropriate corrective actions within target time.

 

Period :              April 1, 2012 up to present

 

 

Company:              Emirates Telecommunications Corporation – ETISALAT

Head Office: P.O. Box 3838, Abu Dhabi, United Arab Emirates

 

Position:               1yr 2 months (CABLE MAINTENANCE SECTION) copper and fiber

1yr 4months (DEVELOPMENT SECTION) FTTH-GPON and copper

1yr 1month (PLANNING SECTION) / FTTx / GPON Multi Services Access & Transport  Network

Network Planner – RND Planning Section – Access Network / Zone-2

 

Job Description:

v      Optimum Planning & Designing of Wired-line Inside Plant (ISP) and Outside Plant (OSP) of FTTx Network utilizing the Point-to-Multi Point Gigabit Passive Optical Network (GPON) for the provision of info-communications services, Triple Play (voice, video, data) within designated exchanges.

v      Planning & Designing Fiber-to-the-Home (FTTH) Multi Services Access & Transport Network using design tools like Telecordia-GIS, Network Engineer 5, (Arc_GIS).

v      Planning & Designing of New Generation Long Haul Transport Network between exchanges with Main & Diversity route to carry the Core Network Transmission (GPON,-OLT’s, IP-NGDLC’s, UMTS, IP-VPN & GSM requirements.)

v      Provide Plan and Design of GPON Network for Civil Works infrastructure such as underground pipeline / ducting system, hand hole, manhole, direct buried, trenching, road crossings and aerial infrastructure in order to meet the circuit diversity and redundancy of Transport Network  & Multi Services Access Network  to congregate present and future requirements of ETISALAT.

v      Provide FTTx GPON point-to-Multi-Point architecture plan network reliability and diversity within the exchanges areas and to upgrade the existing infrastructure as and when required.

v      Conducted site survey in order to explore creative solutions considering the physical condition of the site for the provision of civil works connectivity, fiber optic route link diversity, redundancy and circuitry of FO Network to meet quality design, project execution plan and effective cost estimate.

v      Perform study of Network plan for migration and upgrading the infrastructure network from the existing copper cable to GPON – FTTx  Technology.

v      Prepared work order estimate for Fiber Optic development on schedule of works for cable, civil, splicing, with technical details drawings (plant map, key map, SLD, schematic, block diagram, CPD, MCD) for the proposed & existing network plants of ETISALAT and issue to the Contractors for project implementation and execution.

v      Coordinate with other section for the work progress and project status to ensure that service can be provided without delay and taking appropriate corrective actions within target time.

 

Period :              Sept. 15, 2008 to March 31, 2012

 

 

Company:

             

Ø       PAXCOM Inc. / PTCInc. Paxcom Training Center Inc. ( Sister Company )

2F Sta. Isabel Commercial Center, Rufina Subd., Sta. Isabel Malolos City Bulacan

Sub-contractor of GLOBE / P.L.D.T. / DIGITEL Phil. Projects

 

Position:              O.S.P. Supervisor / O.S.P. Training Instructor

 

 

Job Description:

v      Paxcom Inc. O.S.P. Supervisor

Handling O.S.P. / Out Side Plant Operation

Handling Special Project From (GLOBE / P.L.D.T. / DIGITEL )

Handling of Emergency works of 24/7 on Calls

Handling Inspections for a prospect Projects to be contracted 

Handling Documentation for F.A.T. Final Acceptance Test

Monitoring Daily Activities

 

v      P.T.C.Inc. O.S.P. Training Instructor

Teaching Basic Color Coding ( European, American, Showa )

Teaching Basic Cable Splicing ( Aerial, Underground )

Teaching Basic Cable Installation ( Aerial, Underground )

Teaching Basic Interpretation of Plans

Teaching Basic Testing of Old and New lines for Cut-overs                                                 Teaching Basic Closing and Re opening of Shrinkable Closures

Teaching Basic Termination of Different Modules in Cabinet

Teaching Basic Installation Cables in Different Cabinets & M.D.F.

 

Period:                            November 26, 2007 to September 5, 2008

 

 

Company:              MAHER AL MARZOOKI EST.

P.O. Box 86682, Riyadh 11632, Kingdom of Saudi Arabia

Sub-contractor of  SAUDI TELECOM COMPANY S.T.C. / SAUDI RAILWAYS ORGANIZATION S.R.O. / ARAMCO (IDAS & RIC) Projects

 

Position:              F.O.C. & Foreman Fiber / Copper Splicer (Pressurized & Non-Pressurized)

                            SaudiTel Company (STC)

Safety Officer in ARAMCO (IDAS & RIC) Projects F.O.C. Works

 

Job Description:

v      Installation of  F.O.C. cables to Manholes, Exchange, HRISLU,RAN

Preparation of  F.O.C. cables for Splicing or Cut-over's

Splicing of New & Old F.O.C. lines using FSM 30S,FSM 40S

ERICSSON FSU 925RTC, FSU 975RTC, SUMITOMO Fusion Machine

Perform End to End testing using OTDR

Getting Splice Loss with mean average value using OTDR

Performing Power meter using Laser Precession (LP5250/LP5200)

Expo Power Meter/Light Source, GN NETTEST

Power Meter/Light Source & Talk Set

Re-opening & Closing of F.O.C. closures Raychem, PSI,3M,WESA

Representative during Acceptance test

 

v      Copper Cable Works

Cable Installation Direct Buried & Manholes to Hand holes

Installation of B.S.W. Buried Service Wire

Installation of S.T.B., U guard, Pillar D.P.

Jointing of secondary & Primary Cables inside Manholes, Hand holes, Joint Pits by using 3M Modular, Scothlock UY connector, MR1 pica bond

Installation of Terminal Blocks Pillar D.P./ Cabinets / M.D.F.

Closing & Re opening of Lead Closures for Primary Lines

Splicing of Polyteline cable to Paper insulated cable

Repair Fault Like I.C.T. & M.C.T.

Rerouting of New Cables for Additional Cabinet or Pillar D.P.

Performing C.L.T. confermation for Cut-over

Stenciling of Pillar D.P., Wall D.P., Indoor D.P., Cabinets

Prepare Necessary documents (Binders) for P.A.T. & F.A.T.

 

v      Safety Officer Works

Performing Daily Safety Guide Line

Performing Daily Check List of Work Site Before Working

Performing Gas Test at Manholes & Hand holes

Checking Permits Before Work at Site

Checking of tools & Equipments

 

Period:                            November 11, 2004 to November 24, 2007

 

 

Company:              DIGITEL TELECOMMUNICATION PHILS., INC.

110 E. Rodriguez Jr., Avenue, Bagumbayan, Quezon City

2nd Largest Fixed-wire Telecommunications Company in the Philippines

 

Position:              Service Technicians I & R

 

Job Description:

v      Installation Works

Jumper ring at M.D.F. / E.L. Side to Primary Side Pair Assign by Dispatch

Jumper ring at Cabinet Primary to the Secondary Pair Assign by Dispatch

Coordinate to Switching for confirmation of Telephone No.

Confirmation of Dial tone from the D.P.

Installation of drop wire from D.P. to subscriber   

Closing of  Work by Coordinating Dispatch

 

v      Repair Works

Gathering information’s on Subscribers by Call Thru

Designating Work Cabinet by Cabinet & D.P.

Isolation of Troubles from M.D.F./ Cabinets / D.P. / Subscriber line

Repairing an I.C.T./ Individual Cable Trouble & M.C.T. Major Cable Trouble

Closing of repair by Coordinating to Dispatch

 

Period:                September 01, 2000 to April 07, 2003

 

 

Company:              MAHER AL MARZOOKI EST.

P.O. Box 86682, Riyadh 11632, Kingdom of Saudi Arabia

Sub-contractor of SAUDI TELECOM COMPANY (S.T.C.)

 

Position:              Foreman  Fiber / Copper Splicer

 

Job Description:

v      Integrated Telecom Company/Al Khobar Area ( Fiber Optic Junction projects)

ITC Cable Landing Station (Corniche Tower) Al khobar Mall – Gulf Tower

v      STC/MODA Frequency Replacement Projects (Fiber Optic LDN & Junction Route

MODA Madina-Tabuk / Bisha – Baha LDN FOC & Junction FOC Route (Asir Region)

v      Key Account Projects (Riyadh City Area & Qassim District)

Muraba,MalazKhurais,Naseem,Nadeem,Aziziyah,Aula,Andalus,Dirriyah,Esul

Khaleej,Mathar,Shobah,Yasmin Sites & Buaraydah SItes

 

Period:                            September 18, 1998 to May 10, 2000

 

 

Company:              NESIC TELECOM CONSTRUCTION PHILS., CORP.

7th & 8th Floor, Don Jacinto Bldg.,

141 Salcedo St., Legaspi Village, Makati City

Dealing with the Telephone Construction of

DIGITEL ( NX-2 ) Expansion Projects

 

Position:              Technicians ( C ) Foreman Copper Cable Splicer

 

Job Description:

v      Splicing Works

Splicing of 1200 / 1800 Pairs Primary Cables in Manholes

Splicing of 1200 / 1800 Pairs Primary Cables in Cable Vaults

Splicing of Aerial for Secondary Lines

Termination of Copper Cable in Cabinets, ELU, RLU, Secondary & Primary Lines

Installation of D.P. / Egerton Closures

Continuity Testing using Headset / Tone Generator

Closing of Raychem Closures

Termination of MDF / Crone Blocks by using Crone Puncher

Testing of Splice Cables by using Tone Generator & Head Set

Preparation of testing Data for P.A.T.

 

Period:                            September 08, 1997 to September 12, 1998

EDUCATIONAL ATTAINMENT

 

 

v      Dec. 2003                             BASIC SAFETY COURSE

P.S.T / F.P.F.F / P.S.S.R

Magsaysay Training Center, Metro Manila, Philippines

v      April 1991                  Lorraine Technical School / Caloocan City

                                                         PRACTICAL ELECTRICITY

 

v      March 1998                      Southern Institute  / Hagunoy, Bulacan

                                                          HIGH SCHOOL

v      March 1995                       Sto. Rosario Elementary School / Hagunoy, Bulacan 

                                                          ELEMENTARY

 

COMPUTER BACKGROUND

 

Ø      Knowledge in Microsoft Office, excel, Power point, Microsoft Outlook, Reformat using WINDOWS XP, WINDOWS XP Home Edition, WINDOWS 2000, VISTA Version, 3000 VORTEX

 

TRAINING/SEMINARS ATTENDED

 

Ø       P.S.S.E. Philippine Society of Safety Engineers

Middle East Chapter / November 2007

ASSOCIATE MEMBER

Ø       Validation of Competency Standards for Outside Plant (OSP) Cable Service

(Installation and Maintenance) / May 30, 2007 / TESDA Tabang Guiguinto

Ø       Trainers Methodology Training Program (TM1)

June 04, 2007 to June 06, 2007 / TESDA Tabang, Guiguinto Bulacan

Ø       Workshop on the Development of Competency Assessment Instrument

June 25,26,27,28, 2007 / TEDA Tabang, Guiguinto, Bulacan

Ø       5S WORKSHOP / DIGITEL TRIANING CENTER

August 28, 2002

Ø       CUSTOMER SERVICE MANAGEMENT SEMINAR

DIGITEL TRAINING CENTER

August 08, 2003

Ø       BASIC OUTSIDE PLANT / DIGITEL TRAINING CENTER

October 09 to 13 2000

Ø       3M TELCOMM PRODUCTS / 3M Splicing Rig Kits, Dynatel 957

KB Closures and Outside Cable Accessories

October 11, 1998

Ø       BASIC (AERIAL & UNDERGROUND) Jointing and Testing of Copper Cables

NESIC TELECOM CONSTRUCTION PHILIPPINES CORPORATION

February 02 to 07 1998

 

PERSONAL  DATA

 

 

Date of Birth                            :              October 10, 1972

Place of Birth                            :              Balagtas, Bulacan Philippines

Age                                          :              40 years old

Citizenship                            :              Filipino

Civil Status                            :              Married

Religion                             :              Catholic

Language                            :              Basic Arabic, English & Tagalog

 

 

References upon Request

 

 

 

JOEPERSIE CAMO BARSANA

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US