From: route@monster.com
Sent: Thursday, September 10, 2015 3:48 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Fred Le Fevre 5408
Rutledge Ct, The
Colony, TX 75056 Cell:
972-786-6657 f.lefevre@sbcglobal.net SUMMARY
OF QUALIFICATIONS · MS Word, Excel, Power Point, Outlook, Access, Project ,
Excel for Project Managers, Construction Estimating w/ Excel · Six Sigma Project Management · Scoping Management · Applied Project Management / Boston University Corporate
Education Center-Tech Skills · Construction Project Management Distance Program / Auburn
University · OSP Engineering, Field Notes, Aerial, Buried and UG,
Permitting and ROW Use · Aerial Distribution Pole-Line Design, Make-Ready, Guying
& Anchoring, Loading · ETA Certification CFOI-OSP (#FOITX1005) Structured Cabling
and F/O Installation 2002-2006 · AT&T document access and record systems OPTI-NT and
BSTCAD, LFACS, FACS-120, OPEDS, Map-viewer, OSP CM · VERAX Reporting & Management Database Administration PROFESSIONAL
EXPERIENCE PEG
Bandwidth
01/2013 – Present Senior
Construction Engineer & Fiber Backhaul Site Coordinator OSP / ISP · Maintains Schedules and Monitors All PEG Site Walks /
Project Close-Outs · Tracks and Manage all Dark Fiber Initial and
Pre-Construction Work Requests · Prepare and Submit Site Drawings for Transport and
Submissions and Approvals for NTPS · Installation of HH and/or conduit to H-Frame, Shelter, or
Outdoor Compound · Installation of Transport Cabinet and Appropriate
Equipment/ Hardware, Connection of DC Power · Fiber to Compound and Splicing Status and Installation of
MRV Switch and Testing · Obtain ROW, access, utility easement information from
customer · Obtain A&E drawings, Prepare site plan, Redline site
plan and Redline for NTP submission · Monitor status of NTPs and Monitor status of sites
released to transport · Schedule installation of HH, conduit, transport cabinet,
and equipment · Coordinate with fiber construction crews as to projected
date of fiber to compound · Ensure HH and/or conduit is in place prior to arrival of
fiber · Ensure transport cabinets are installed and powered prior
to arrival of MW crews · Schedule connection of DC power, Install of MRVs, Assist
with provisioning of MRVs · Inspect transport cabinet installations for quality
control · Monitor and report status of site installations to
Director of Operations on a daily basis · Monitor equipment orders, arrange delivery, storage and
transport for cabinets, HHs, Hardware) · Respond to outages or equipment failures Osmose
Communications Services (BB Com) for Goodman
Networks
09/2012-1/2013 Century Link
/ Sprint FTTT / FTTH OSP Field Engineer MN · Fiber to the Tower and Fiber To the Cell Site Last Mile
Fiber Optic OSP Design for 229 existing Sprint Sites · Site Assessment Design Survey for Sprint · Site Survey, OSP Site Requirements, BoM, Power Requirements,
Scope of Work, Compound Drawings · Shelter and Racking requirements, Rooftops and Building
Colocations · Aerial, Buried and Underground Design Make-Ready and
Fieldwork · ROW Research, Permitting and Utility Research RJE
Telecom01/2012 – 09/2012 Windstream
/ Verizon Wireless Fiber to the Tower Construction Arkansas and WV Project · Long-haul and Backhaul Fiber Construction Management
,Supervision and Inspection to 177 existing cell sites · Supervised and Reviewed all Aerial Distribution Design and
Make-Ready · Supervised and inspected general contractors and equipment
responsible for aerial, buried and underground construction · Supervised and inspected splicing and testing of
fiber optic cable installation · Verified all row and easement requirements in
advance of construction equipment · Verified all 3rd party utility agreements, specifications and regulations
along route · Project Management Audit Group Staff · Project Management Audit Group Responsible for
Finalization of Client Documentation and Contract Deliverables · Project Management Audit Group Responsible for Permit and
ROW Close-out Processes · Project Management Audit Group Responsible for Authorized
Service Provider(ASP) Invoice and Financial Reconciliation Nexlink
Global
Services
11/2011 – 01/2012 OSP Field
Construction Supervisor for RUS / Stimulus Customer Projects · Long-Haul Fiber Project Supervisor in Missouri for Federal
Stimulus / RUS Utility Client · Supervised general contractors and equipment responsible
for aerial, buried and underground construction · Supervised splicing and testing of fiber optic cable
installation · Verified all row and easement requirements in
advance of construction equipment · Verified all 3rd party utility agreements, specifications and regulations
along route · Supervised four (4) OSP inspectors in 36 mile fiber optic
construction on MO DOT ROW · Supervised all aspects of staking, aerial construction and
make-ready, guying, anchoring · Supervised all aspects of buried, sign and vault
placements, conduit and boring construction applications · Reviewed OSP prints prior to construction and as-built
documentation daily · Produced daily reports as required Dynamic
Technical Services, Corinth, TX5/2010 – 11/2011 FTTT /
FTTH Construction Project Manager for AT&T · On-Premise at AT&T in Oklahoma City for
FTTX Projects FTTH, (FTTN-VRAD), FTTCS / ETTCS and FTTP · Fiber, Manhole / Hand-Hole and Conduit Placing · Additions and / or Arrangements to Cross Connect Cabinet · Placement of Properly Sized VRAD (Video Ready Access
Deployment) Cabinet · Bonding and Grounding, Evergood Power Cabinet
Installation Requirements Logical
Link Inc., Bedford, TX
10/2008 - 4/2010 Wireless
Implementation & Installation Project Manager for Zayo Bandwidth · Contracted to DSE/ Cobalt Construction for Zayo Bandwidth
in Indiana for 200+ Existing Sites (with T-Mobile) · Third Party Contract Management for fiber access and dark
fiber leasing, permit and row acquisition · EF&I Implementation, OSP/ISP IM & CPM for ASP’s,
SOW, NTP, MOP’s, BoM, Site Walks, BTS installation · H-fixture construction, Nema & Hoffman Cabinet
installations , · Purcell Box and Chatsworth 19” Rack Installation ,
Security Cage and Decking Installation · Backboard Installation , Free Standing and Wall Mounted
Ladder Racking Installation · Power Up, Turn-Up, Alarm Install, Verify Cross Connects,
Maintenance Window Work · Wireline Fiber Design, Fiber Backhaul / Backbone
Fiber (Core) Infrastructure Dynamic
Technical Services, Denton, TX
11/2003 - 8/2008 Senior
Manager of OSP Services / Infrastructure Project Manager · MCI WorldCom, AT&T, Verizon Business, Cox, and Time
Warner Cable. · New Orleans to Houston to San Antonio Micro-Duct Fiber
Placement Project including downtown New Orleans, Houston and San Antonio
metro rings · The projects consisted of but were not limited to, fiber
optic backhaul OSP and civil construction, wireless site survey and analysis,
UMTS implementation, aerial, buried, UG, conduit, inspection,
make-ready, FTTN - VRAD's / FTTP - FTTH / FTTCS - ETTCS,
ISP/OSP building industry consulting, structured cabling solutions and
collocations. Permit and ROW Acquisition. · Managed network services and infrastructure implementation
Managed a Computer Assisted Design, Engineering and Construction staff of 25. EDUCATION Auburn
University Extension , Construction Project Management8/2008 - 1/2010 · CPM, CBM, Excel for PM, Construction Estimating w/
Excel · Comp TIA Project+ , Comp TIA Network+ Boston
University Corp Education Centers (Operated by Tech-Skills, LLC, - Addison,
TX Campus)8/2008 - 1/2010 · Project Management Professional (PMP) Diploma Program College
of the Mainland / Institute of Robotics Galveston County Campus, Texas City,
TX9/2002 - 12/2002 · Diploma - Certification - 60 Hours, Fiber Optic and
Broadband Electronic Technology · (LAN / WAN), wireless #, data & voice, structured
cabling, GPS, splicing / installation / theory) CSU
System - Colleges of Engineering and Continuing Education eLearning10/1998 - 12/2003 · Cal State University @ Sacramento Diploma - Utility
Management Program · Certificate – MS Project 2000 · Cal State Poly University @ Pomona Diploma – MS Visio 2002 University
of Missouri, Columbia, UM Extension, College of Public Admin &
Governmental Affairs9/1983 - 10/1984 · Diploma - City and County Planning and Plan Administration PROFESSIONAL
AFFILIATIONS · Texas Society of Telephone Engineers Member since 1986 · BICSI Member (member #127374) since 1995 · Electronic Technicians Association (ETA) Member (Certified
Member #FOITX1005) since 2002 · Project Management Institute (PMI) Member (member #
1384142) since 2009 · American Management Association (AMA) Enrolled in
management certification process AWARDS
RECEIVED (MCI) Team 400
Monthly Award for Michigan Project04/1993 Team 400
Monthly Award for PCS Network Project0/1993 Team 400
Monthly Award for Mutual Signal Network Acquisition11/1993 Team 400
Monthly Award for FAA Redundancy Project0/1994 4th
Quarter 1993 Facility Engineering Teamwork Award12/1993 Subject
of Telephony OSP Magazine article for Innovative Construction Approach in San
Luis Obispo, CA07/1994 Team 400
Monthly Award for Mexico Construction Project04/1995
|
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|