From: route@monster.com
Sent: Thursday, September 10, 2015 3:44 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Educational Details
Experience
6 year
Skilled Achieve: · FTTX,FTTH,FTTB · System
Migration Copper to Fiber · ADSL · Structure
Cable system UTP( CAT 3,5,6) · OSP( All
type of Joint) · GSM (BTS
3900 Installation) · IBS ( IN
Door Building Solution ) · OTDR · Fluke
Tester · 2G,3G,4G · WLAN · Low
current
Trainings
ETISALAT UAE · FTTH Migration
Trainings From Etisalat · FTTH ONT
Installation Trainings From Etisalat
OOREDOO QATAR · Migration
&Troubleshooting · Soft
Skills · Hard
Skills &ISP Sop · Hard
Skills & OSP SOP · Business
Rule of ONT · Visit
Report Completion Training
Presently working
in AL ABERAH Electrical Mechanical UAE Responsibilities: · Installing
the Radio Setup And Troubleshooting · Installing
the Telemetry Equipment and Troubleshooting · Installing
the PTU · Installing
the Auto Tracking Antenna · LGX 24F
Termination And Testing (Alcatel lucent) · Structure
Cable Testing With Fluke Tester (DTX 1800) · Fiber
cable Maintenance & Troubleshooting · Structure
cabling system: Design and Installation of Structured Cabling ·
Physical installation of Category 3,c Category 5, Enhanced
Category 5, Category 6 and Fiber Optic Structured Cable Distribution Systems. ·
Accurately test copper and fiber (multimode and single
mode ·
Diagnose and correct copper and optical fiber problems. ·
Perform site surveys, read and use blueprints and floor
plan and conduct visual site inspections. ·
Physical installation of routers & switches,
co-ordinate with network engineers to finalize the installations. ·
Assist in installation of Wireless Access Point and Guest
Wireless. ·
Record and Update Site Infrastructure ·
Creating telephone extension and configuring IP phone as
per the request. ·
Perform cable splices optical fiber (mechanical and
fusion). ·
Perform administrative tasks including, documenting test
results and as-builds, completing safety reports, keeping safety meeting,
maintaining log books, providing labor summary reports. ·
Installing the CCTV Network BIN OMRAN
TELECOM AND TRADING W.L.L DOHA (QATAR) Contractor of Qatar Telecom
Oordeeo
PROJECT: Huawei/Oordeeo FTTX National
Broadband
· ISP Team leader (Huawei ONT Installation/Migration/Fiber
Optic splicing and services testing) · Migrate copper services to fiber and Create New FTTX
customers(Business/residential) · Install/configure Huawei GPON/ONT (HG8247/HG8447). · Customer Provisioning (Internet, Voice and Mozaic IPTV)
into Oordeeo secure Access SSL VPN · Using Comptel tool, Demonstration of Mozaic TV (IPTV) and
Information on service to Customers. · Service Provisioning and testing of services after
Migration. · Configure CiscoEA4500/CiscoEA2700 AP at customer premises
for Internet access. · Request DCR change where applicable. · Install copper and Fiber optic at customer sites (patching
UTP cat6/cat3, patch cord and pigtail termination. · Telephone line connection, identify existing in HOUSE wiring to extend circuits, terminate · RJ11, testing phone lines and troubleshooting using toner. · FTTX ISP/OSP Fiber Optic splicing (FAT, Sub FAT, Joint
enclosure and ODF) · Fiber Optic troubleshooting using light source and power
meter. · Electrical power connection and ISP survey route and
install ATB & ONT · Survey route for OSP cable pulling teams inside customer
premise · ISP ONT Installation. · Adhere to Quality control and ensure SOP followed on-site. · Complete all documentation on all customers Work order,
time spent at location, materials used And system
configuration worksheet. · Attend meetings regarding Site Implementation Qualities. · Taking Photos of ISP
Installations area and submit to ISP Manager. Experience in UAE
(United Arab Emirates (July 2009 - To 15 June 2011) My
son Telecom System UAE at FTTH (Fiber to the Home) for Etisalat Project with Following
Responsibilities:- ·
Working for Etisalat on GPON Project as a
Senior Field Technician in My son Telecom System Abu Dhabi, UAE. ·
GPON Service provisioning, configuration and Migration. ·
Wireless router configuration and installation. ·
Splicing, Testing and termination of optical fiber cable. ·
Preparation and Installation of Splitters at Different
Outdoor Fiber Cabinets.. ·
Patching Splitters and Splitters to ODF, and also
patching in Outdoor Fiber Cabinets. ·
Splicing and Testing of Single Drop Fiber, 8 fibers,
16,24,48,96,144,192 Fiber. ·
Installation of ONT, FDH & ODF
(optical fiber distribution frame). ·
Troubleshooting in FTTH network using OTDR,
Source Meter, Power Meter and Visual Fault Locater IBS (Indoor
Building Solution) for Etisalat and Du (Ericsson, Motorola) Job Responsibilities: ·
Installation of RBS ·
Installation DAS (Distribution of Antenna System) ·
Installation of Splitters & Tappers ·
Lying of Feeder Cables & preparation of all connectors ·
Testing with Anritsu Site master Tier
Four the Smart Solution as Team Lead
HUAWEI MOBILINK (BTS) SWAP PROJECT AS A
Team Leader Job Responsibilities: ·
ALCATLE BTS swapped with Huawei3900(A)BTS Indoor to
Outdoor ·
Installation of Huawei and 3900A ·
Installation of TMC & Minishelter and shifting of
Microwave indoor to outdoor ·
Installation of EMU for alarm patching and troubleshooting ·
Patching & verifying all EMU alarms ·
Quality Assurance and Quality Control & Safety
Precautions HUAWEI
TELENOR (BTS) SWAP PROJECT AS A Team Leader ·
NSN BTS SWAPPED WITH HUAWEI 3900(A)BTS & DBS 3900 ·
Installation of Huawei 3900DBS and 3900A ·
Installation of RRU ·
Installation of EMU for alarm patching and troubleshooting ·
Patching & verifying all EMU alarms ·
Quality Assurance and Quality Control & Safety
Precautions ·
Use of site master, power sensor and view LCT software. ·
Panning of microwave dish. IT’S
Proficiency ·
Word, Excel, power point and Internet Browsing and
experience on various operating systems ·
Configuration and installation of Cisco & Balkan
routers. ·
Configuration and installation of
ONT Equipment Used In
Optical Fiber Field & GSM Field Ø
OTDRs: · ACTERNA
JDSU 6000. · ACTERNA
MTS 5000e. · EXFO
FTB200. · FTB 100 Ø
FUSION Splicer Machine: ·
Fujikura 50s. ·
Fujikura 60s. ·
Fujikura 70s Ø
JOINT ENCLOUSER: ·
Corning ·
3M ·
Leviton Ø
Power/Source meter testing: · Exfo · JDSU OLS
55 · AFL Ø
UTP Tester: · Fluke
DTX–1800 cable analyser, LAN Tester, Tone Tracer
Worked on following projects in Al Aberah as a Team Lead UAE Army Abu Dhabi: Ø 34 km Fiber optic cable link
connectivity (Pulling, Terminating, Jointing, testing and labeling) ZMC Al Ain: Ø Did Optical Fiber connectivity MDF
to IDF and IDF to IDF and back bone optical fiber Cable connectivity
(Pulling, Terminating, Jointing, testing and labeling). Ø More then 700 dual UTP voice and
data Point (Pulling, Terminating, Jointing, testing and labeling) ZMC Sweihan: Ø Did Optical Fiber and UTP and
Coaxial Cable work at CCTV and Access control Project of 32 Building in ZMC
Sweihan Al Hamra and Rawais: Ø Did GCC Optical Fiber cable work
and divert route (Pulling, Terminating, Jointing, testing and labeling) Zayed Miltary College Al Ain: Ø Did Optical Fiber cable work and
120 dual UTP point (Pulling, Terminating, Jointing, testing and labeling) Flajal Haza in Alain: Ø Did Optical fiber, STP and copper
cable work in building and its security towers. (Pulling, Terminating,
Jointing, testing and labeling) ZMC Sweihan: Ø Did Copper and UTP cable work in
Khatiba Sweihan. (Pulling, Ducting, Terminating, testing and labeling) |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|