From:                              route@monster.com

Sent:                               Thursday, September 10, 2015 3:44 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Zafran Zeb 

Last updated:  03/18/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

UAE, Abu Dhabi
  
AE

Home: +971508790041   
zafran.zeb123@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Zafran CV

Resume Value: we39g83b4apy9w7k   

  

 

Name:   Zafran Zeb                        


Date Of Birth: 17-04-1989                    

                             Religion: Islam                            


Gender: Male                                


Address:                                Pakistan Rawalpindi


Passport No: AZ5095442                      


Nationality : Pakistani                            

PERSONAL PROFILE

Zafran Zeb

                                    OBJECTIVE
Enjoy new challenges and like to work in demanding situation. I am looking for a professional career in multinational sector which will provide me unlimited growth opportunities and suitably.
                     

Contact Number
                     

                        00971-508790041

 

 

             Language : English,Urdu,Arabi,Punjabi       
    

                    Email: Zafran.Zeb123@gmail.com
         
                          Driving License: UAE (In progress )

 

                                 Nationality : Pakistani                            

                                              

                                    Educational Details

Education

Institute Name

Passing Year

Diploma Of Associate Engineer in

Telecommunication

Faiz_UL_Islam Institute Of Technology Mandra Rawalpindi

2008

S S C

 

BISE Rawalpindi

2005

Optical Fiber (Short Course)

Pakistan Telecom Foundation Pakistan

2009

Computer Hardware

Institute of Rural Management RWP

2009

                                                    Experience 6 year

 

Skilled Achieve:

·   FTTX,FTTH,FTTB

·   System Migration Copper to Fiber

·   ADSL

·   Structure Cable system UTP( CAT 3,5,6)

·   OSP( All type of Joint)

·   GSM (BTS 3900 Installation)

·   IBS ( IN Door Building Solution )

·   OTDR

·   Fluke Tester

·   2G,3G,4G

·   WLAN

·   Low current

 

                                                  Trainings

                                                 ETISALAT UAE

·   FTTH Migration Trainings From  Etisalat

·   FTTH ONT Installation Trainings From Etisalat

                                                 OOREDOO QATAR

·   Migration &Troubleshooting

·   Soft Skills

·   Hard Skills &ISP Sop

·   Hard Skills & OSP SOP

·   Business Rule of ONT

·   Visit Report Completion Training

                                   

Presently working in AL ABERAH Electrical Mechanical UAE

Responsibilities:

·   Installing the Radio Setup  And  Troubleshooting

·   Installing the Telemetry Equipment and Troubleshooting

·   Installing the PTU

·   Installing the Auto Tracking Antenna 

·   LGX 24F Termination And Testing (Alcatel lucent)

·   Structure Cable Testing With Fluke Tester (DTX 1800)

·   Fiber cable Maintenance & Troubleshooting

·   Structure cabling system: Design and Installation of Structured Cabling

·   Physical installation of Category 3,c Category 5, Enhanced Category 5, Category 6 and Fiber Optic Structured Cable Distribution Systems.

·   Accurately test copper and fiber (multimode and single mode

·   Diagnose and correct copper and optical fiber problems.

·   Perform site surveys, read and use blueprints and floor plan and conduct visual site inspections.

·   Physical installation of routers & switches, co-ordinate with network engineers to finalize the installations.

·   Assist in installation of Wireless Access Point and Guest Wireless.

·   Record and Update Site Infrastructure

·   Creating telephone extension and configuring IP phone as per the request.

·   Perform cable splices optical fiber (mechanical and fusion).

·   Perform administrative tasks including, documenting test results and as-builds, completing safety reports, keeping safety meeting, maintaining log books, providing labor summary reports.

·   Installing the CCTV Network

  BIN OMRAN TELECOM AND TRADING W.L.L DOHA (QATAR) Contractor of Qatar Telecom Oordeeo

 

            PROJECT: Huawei/Oordeeo FTTX National Broadband                                    

·      ISP Team leader (Huawei ONT Installation/Migration/Fiber Optic splicing and services testing)

·      Migrate copper services to fiber and Create New FTTX customers(Business/residential)

·      Install/configure Huawei GPON/ONT (HG8247/HG8447).

·      Customer Provisioning (Internet, Voice and Mozaic IPTV) into Oordeeo secure Access SSL VPN

·      Using Comptel tool, Demonstration of Mozaic TV (IPTV) and Information on service to Customers.

·      Service Provisioning and testing of services after Migration.

·      Configure CiscoEA4500/CiscoEA2700 AP at customer premises for Internet access.

·      Request DCR change where applicable.

·      Install copper and Fiber optic at customer sites (patching UTP cat6/cat3, patch cord and pigtail termination.

·      Telephone line connection, identify existing in HOUSE wiring to extend circuits, terminate

·      RJ11, testing phone lines and troubleshooting using toner.

·      FTTX ISP/OSP Fiber Optic splicing (FAT, Sub FAT, Joint enclosure and ODF)

·      Fiber Optic troubleshooting using light source and power meter.

·      Electrical power connection and ISP survey route and install ATB & ONT

·      Survey route for OSP cable pulling teams inside customer premise

·      ISP ONT Installation.

·      Adhere to Quality control and ensure SOP followed on-site.

·      Complete all documentation on all customers Work order, time spent at location, materials used

       And system configuration worksheet.

·      Attend meetings regarding Site Implementation Qualities.

·      Taking Photos of ISP Installations area and submit to ISP Manager.

Experience in UAE (United Arab Emirates (July 2009 - To 15 June 2011)

My son Telecom System UAE at FTTH (Fiber to the Home) for Etisalat Project with Following Responsibilities:-

·                        Working for Etisalat on GPON Project as a Senior Field Technician in My son Telecom System Abu Dhabi, UAE.

·                        GPON Service provisioning, configuration and Migration.

·                        Wireless router configuration and installation.

·                        Splicing, Testing and termination of optical fiber cable.

·                        Preparation and Installation of Splitters at Different Outdoor Fiber Cabinets..

·                        Patching Splitters and Splitters to ODF, and also patching in Outdoor Fiber Cabinets.

·                        Splicing and Testing of Single Drop Fiber, 8 fibers, 16,24,48,96,144,192 Fiber.

·                        Installation of ONT, FDH & ODF (optical fiber distribution frame).

·                        Troubleshooting in FTTH network using OTDR, Source Meter, Power Meter and Visual Fault Locater

 

IBS (Indoor Building Solution) for Etisalat and Du (Ericsson, Motorola)

Job Responsibilities:

·   Installation of RBS

·   Installation DAS (Distribution of Antenna System)

·   Installation of Splitters & Tappers

·   Lying of Feeder Cables & preparation of all connectors

·   Testing with Anritsu Site master

 

Tier Four the Smart Solution as Team Lead

 

                                     HUAWEI MOBILINK (BTS) SWAP PROJECT AS A Team Leader

Job Responsibilities:

·   ALCATLE BTS swapped with Huawei3900(A)BTS Indoor to Outdoor

·   Installation of Huawei and 3900A

·   Installation of TMC & Minishelter and shifting of Microwave indoor to outdoor

·   Installation of EMU for alarm patching and troubleshooting

·   Patching & verifying all EMU alarms

·   Quality Assurance and Quality Control & Safety Precautions

 

           HUAWEI TELENOR (BTS) SWAP PROJECT AS A Team Leader

 

·   NSN BTS SWAPPED WITH HUAWEI 3900(A)BTS & DBS 3900

·   Installation of Huawei 3900DBS and 3900A

·   Installation of RRU

·   Installation of EMU for alarm patching and troubleshooting

·   Patching & verifying all EMU alarms

·   Quality Assurance and Quality Control & Safety Precautions

·   Use of site master, power sensor and view LCT software.

·   Panning of microwave dish.

 

 

   IT’S Proficiency

 

·                        Word, Excel, power point and Internet Browsing and experience on various operating systems

·                        Configuration and installation of Cisco & Balkan routers.

·                        Configuration and installation of ONT     


   

 

Equipment Used In Optical Fiber Field & GSM Field

 

Ø      OTDRs:

·   ACTERNA JDSU 6000.

·   ACTERNA MTS 5000e.

·   EXFO FTB200.

·   FTB 100

Ø      FUSION Splicer Machine:

·             Fujikura 50s.

·             Fujikura 60s.

·             Fujikura 70s

Ø      JOINT ENCLOUSER:

·                                                              Corning

·                                                              3M

·                                                              Leviton

Ø       Power/Source meter  testing:

· Exfo

· JDSU OLS 55

· AFL

Ø       UTP Tester:

· Fluke DTX–1800 cable analyser, LAN Tester, Tone Tracer

 

    Worked on following projects in Al Aberah  as a Team Lead

UAE Army Abu Dhabi:

Ø      34 km Fiber optic cable link connectivity (Pulling, Terminating, Jointing, testing and labeling)

ZMC Al Ain:

Ø      Did Optical Fiber connectivity MDF to IDF and IDF to IDF and back bone optical fiber Cable connectivity (Pulling, Terminating, Jointing, testing and labeling).

Ø      More then 700 dual UTP voice and data Point (Pulling, Terminating, Jointing, testing and labeling)

ZMC Sweihan:

Ø      Did Optical Fiber and UTP and Coaxial Cable work at CCTV and Access control Project of 32 Building in ZMC Sweihan

Al Hamra and Rawais:

Ø      Did GCC Optical Fiber cable work and divert route (Pulling, Terminating, Jointing, testing and labeling)

Zayed Miltary College Al Ain:

Ø      Did Optical Fiber cable work and 120 dual UTP point (Pulling, Terminating, Jointing, testing and labeling)

Flajal Haza in Alain:

Ø      Did Optical fiber, STP and copper cable work in building and its security towers. (Pulling, Terminating, Jointing, testing and labeling)

ZMC Sweihan:

Ø      Did Copper and UTP cable work in Khatiba Sweihan. (Pulling, Ducting, Terminating, testing and labeling)



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US