From: route@monster.com
Sent: Thursday, September 10, 2015 3:48 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Page 1
Steven B. Paulsen
4637 Clippert St. Dearborn Heights, Mi. 48125
Home (313) 278-3519 Cell (313) 510-0537 spaulsen@prodigy.net Nov
2011
to
Sigma Network Services,
Cincinnati Bell, Cincinnati, Ohio Present
Fielded and completed Fiber to the Home
(FTTH) construction prints for aerial and buried applications.
CenturyLink pole line work from
July 2012 to December
2012, completing overdue joint use applications. Worked AT&T
projects. Sept
2010
to
ADEX Corp, ATT, Memphis,
Tennessee Oct
2011
Worked copper DS1 projects in the Design Provisioning Center utilizing OPEDS
/ BSTCAD, completed PMTOOL and Wide Band testing. Apr
2010
to
Mountain LTD, ATT, Kansas
City, Missouri Aug
2010
Worked from
home completing F2 pair bonding on projects using the DCP
and FEI modules in the Engineering Portal for ATT’s project Light Speed.
Project managed approximately 10 engineers with projects flowing through me
for Quality Control on 80 projects. Feb
2008
to
Butler Telecom, RRT / ATT,
Detroit, Michigan June
2009
Planning completed in the Resource
Recycling Technology database for the removal of ATT copper trunk
lines. Transferred to RRT operations in September 2008 as project /
program manager. April
2005
to
Butler Telecom, SBC / ATT,
Livonia, Michigan Nov
2007
Prepared work order packages in design for FTTN U-verse (Lite Speed),
tracking jobs and trouble-shooting all jobs / revisions with construction
including problems with AOTL, R/W & easement placements, conduit, cable,
splicing and electrical. Was requested by planning periodically for
help with fiber routing, costing and design. Worked units starting in
August 2006 for Butler and PowerTel Inc. placing VRAD’s and F2 conditioning
in the Detroit and Chicago metro areas. Completed between 3 – 5 VRAD
placements / week and 3 – 5 F2 conditioning jobs per week. Worked
with drafting in Micro station (ARES). Oct
2004 to
Tesinc, SBC, Houston, Texas April
2005
Worked from home completing Distribution analysis and rehab planning
packages. Used OPTI-LITE CAD.
Completed Distribution analysis packages based on information from ATT LEIS–LAD
(loop activity data) output. Sept
2003
to
GXT, Inc., SBC, McAlester,
Oklahoma, WorldCom, Detroit, Michigan Oct
2004
Single contract engineer in remote engineering office. Managed all
engineering for nine rural wire centers. Managed other contract
engineers through ACAS projects. Major projects were NGDPG, engineered
and coordinated Civic projects (City and County road relocations), service to
Cellular Towers including inspection, held orders (F1, F2, T1, T3).
Presented project proposals to planning for F1 relief. Inspector for
MCI in Detroit for highway relocation / rebuild project (Highway 12 –
Michigan Ave). July
2001
to
CDI Communications, Ameritech,
Detroit, Michigan Oct
2001
Project Engineer for Infrastructure Maintenance Organization.
Supervised work load for 14 engineers. Worked with drafting in Micro
station (ARES). March
2001
OSP Consultants, Richardson,
Texas to
July
2001
Regional Manager for OSP Cellular operations, Texas consisted of walk
through, routing and pricing for antennas at various buildings in Houston,
Texas. Jan
2000
to
Southwestern Bell Telephone,
Austin, Texas March
2001
Contracted Jan to April, hired on as Manager Engineering Design - Managed
all engineering, outsource and in-house, for the Fireside wire
center. Approved CLEC applications and designed diverse routing for
fiber DS3 circuits. Worked with and supervised seven contractors and
helped train new SWB engineering employees. AutoCAD 2000/4CEF OPTICAD.
Managed / Engineered for Broadband (PRONTO) projects. June
1999
to
ComPlus, IXC / Broadwing
Communications, Austin, TX Jan
2000
Senior Project Fiber Designer - Supervised Engineering Companies and
completed working drawings for conduit entrance / diversity routes within the
United States. Coordinated and engineered 14 route miles of underground with
Bell South in Miami, FL. CAD 14. July
1997
to
Universal Network Development
Corp., Southwestern Bell, Dallas, TX June
1999
Project Engineer/Manager - Worked numerous large projects including pair
allocations for ADSL (36 SAI’s), managing four engineers and two
drafters. Start up for SW Bell 4CEF (OPTI) system included setup and
training. Also included permitting to TXDOT for Caprock
Communications. AutoCAD 14, OPTI-LITE. April
1997
to
Henkels & McCoy, GTE,
Gardnerville, Nevada July
1997
Engineered and submitted work prints in Micro station IDDS (ICGS) for
placement of pair gain units (copper fed UMDC) and feeder relief in rural
farming areas of Nevada. Completed nine projects. March
1994
to
North Star Telecom Services,
Nevada Bell, Reno, Nevada April
1997
Facilities Planner, Lead Area Engineer, Project Engineer- Complete Route
planning for the Reno South & Metro areas. Analyzed wire center
distribution areas for high cost maintenance utilizing LAD database.
Managed four engineers completing Fiber fed Lite-Span, SLC96 & Series 5 -
copper and fiber fed based on Bell PLAN programs. Handled all ISDN, HI-CAP
and DS3 requests. AutoCAD 11 & AutoCAD 12. March
1993
to
Professional Assistance Inc. /
A.T. & T., GTE, Honolulu, Hawaii March
1994
Project Engineer / Distribution Planning Manager - Detailed work orders
and projects in Micro station IDDS (ICGS) on the island of Oahu for
Hawaiian Telephone. Promoted in August to Planning Manager representing
A.T. & T. for the State of Hawaii. Managed five engineers and coordinated
off site work with a sub-contractor in California for Long Range Planning
packages. Page
2
Steven B. Paulsen Oct
1989
to
Butler Telecommunications
Services, Pacific Telephone, Ukiah, California Feb
1993
Facilities Planner / Senior Engineer - Presented estimate proposals and
detailed Feeder Administration Packages for complete route relief in
rural and suburban areas of northern California. Planned and designed
Rule 20 highway relocation projects. In UNIX, utilized and trained company
managers in the use of LEIS / LEAD, PLAN, ESM, DILEP and LAD - Bell Telephone
computer programs. Left for required six-month separation from
P.T.&T. Oct
1983
to
Various locations in the New
England area for NYNEX and SNET
Oct
1989
Butler Telecom, Springfield Mass. 9/88 to 10/89. Senior Project
Engineer-Held orders, HI-CAP services through existing
projects - worked on line with splicers and the
Mechanized Line Assignment Center. Engineered T1 routing for first cell
tower in Springfield, Mass. and completed walk through with vendor for
equipment location and routing through to hospital roof. - CDI
Interglobal, New London, CT., 6/87 to 9/88. Senior Project Engineer Submitted and engineered
planning packages for copper digital relief estimates, including SLC Series
5, integration and mainframe terminations for unigauge office
conversions. Exchange fiber fed SLC included ordering, equipping and
installation instruction for 80D cabinets and Controlled Environmental
Vaults. - Butler Telecom,
Worcester, Mass. 4/85 to 1/87. Project Engineer
Completed routine orders for
Distribution Services Engineering, organized new pole lines and rebuilds with
all various utilities. Worked with Line Assigners to complete held orders and
with the installation of analog pair gain (S6B and CM8). - Tesinc, Boston,
Massachusetts 10/83 to 4/85. Long Range Planning Engineer
Coordinated the completion of seven Long
Range Planning Binders in the Boston Metro area. Utilized EFRAP,
LFAS and CARL - Bell computer programs. Supervised five support
personnel June
1983
to
Thomas Technical, General
Telephone, Santa Monica, California Oct
1983
CATV Engineer / Construction Inspector Jan
1982
to
International Communications
Services, Mountain Bell, Billings, Montana Dec
1982
L.R.O.P.P Engineer - Detailed planning binders, Administration Route Layouts,
Distribution Analysis Charts. March
1981
to
Butler Telecommunications
Services, Pacific Telephone, Los Angeles, California Jan
1982
Planning Binders for five central offices were completed. Involved in
presentation to Los Angeles Staff, Harbor Engineering. May
1980
to
K & B Engineering, Pacific
Telephone, Bakersfield & Santa Ana, California March
1981
Completed L.R.O.P.P and D.A.D.R. for route two in the Bakersfield Main
Exchange. Transferred 10/80, supervised six fielders and
completed detailed drawings for California State Highways, P.T.&T.,
Edison Electric, City of Anaheim and Storer Cable Systems. June
1978
to
Burnup & Sims, Volt
Technical, Pomona, Riverside and San Bernardino, California May
1980
Senior Draftsman, Field Engineer - drafted records and technical prints
including scaled drawings for conduit placement permits for Pacific Telephone
and General Telephone. EDUCATION Apple
Valley Senior High, Apple Valley, California September 1974 to June
1978 Major: Mechanical /
Architectural Drafting Minor: Electronics Courses: Geometry,
Algebra and Electronics Mechanical Drafting - 2
years / Architectural Drafting - 3 years Bakersfield Community
College: one semester - English, Psychology Amateur Radio License -
1969 to 1973 Call letters WN6IRO
Computer Assisted Drafting - AutoCAD 11
through 2002, SBC OPTI-LITE, GTE ICGS (Micro station), BSTCAD
Familiar with Microsoft Office, Word and Excel |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|