Page 1 of 8 JAMES RICHARD (RICK) GRIMES E-mail
– Funforall388@YAHOO.com (703)
- 283-6434 *Presently:
Resident Engineer for Fail Engineering Roanoke Va.for a TDS 6.6m
96ct
foc
Aerial & u/g build.Placing 3 new DSA/Xconnect/ODC/HH equipment.
30000’ft of new overlash,delash existing, placing new strand, relash new
fiber and
existing copper,racking out old strand,placing guys and anchors.Going u/g
into
handholes with 96ct,splicing pigtail fiber to ODC.Setting crossconnect peds.
*6-12-8-12 Inspector for mid-states for FTTH Newcastle Wy. *5-12-6-12: Staking FOC placement for buried
plant Upper Pennsula MI.
For RW Communication * 11/25/11-4/1/12 RW Comm: ·
North Anson ME. ·
OSP Implementation for TDS ·
Order from Field or Network services for a Maintence issue, Line
Extensions for service, Cable moves, Make Ready Applications or Capital
Projects. ·
Determine units and footages needed for request,(mostly aerial),
field draft , cadd, submit to engineering for approvals and funding .Send to
contractor using TDS software ( Project Tracking Tool & Clarity ).
Inspect, produce as-built documents and DWGS. Electronically track and
produce & store forms for Invoice record, as-builts, cadd request,
material retirements or exchange, goods receipts & closing
document. 08/15/11- 11/11/11 RW Communications, P.O. Box 144 Eldorado WI. ( 866) – 872-2902 ·
Inspector for TDS build in Saint Mary’s Ga. ·
Plow, trench & bore inspector for installing 24 – 864ct
mainline feeder F.O.C. and for MST service to the curb ·
Install BH2,4, & mini handholes, BD4 & 5 11/15-4/21/11 ·
Desert Consulting services LLC 7101 N.
Mesa #324 El
Paso TX.79912 Resident Engineer for the city
of Tucumcari NM. A.R.R.A. Project ·
Building a fiber Optic Network to “ Anchor Locations ” ( Hospitals,
Fire & Police Depts, Schools, Health clinics, Job Placement ctrs,
city, state & federal govt bldg through the American Recovery &
Reinvestment Act for ENMR Telephone. ·
Begin by creating staking sheets for round 2 to extend broadband
capabilities into rural NM. Consisted of drafting route from CO’s to anchor
locations in small rural towns. ·
Provided all billable numbers for applicable weekly
production reports ·
Provided all trouble-shooting decisions for field changes. ·
In charge for all inspectors and relevant info. ·
Correlated construction with local & municipal mgmt ·
Constructed necessary spreadsheets & redlines 9/10-11/5/10 Ladysmith WI. RW COMMUNICATIONS Plow & Handhold inspector
for a 21 Mile direct buried (24-144ct) Toll cable Century-Link Build. 04/10- 09/10 Sunbelt Dir. Of Operations Nicki Mason
: 727-596-1500 Job for :Qwest Governmental Services: Marine Base
Quantico
Va.
● Install by bore, plow and
trench 2- 1.5 h.d.p.e. with 144ct. f.o.c. ● Install 17×30×36 handholes ● Redlines ●Security clearance to work on
base ·
Promoted to lead inspector, consisted of correlating dailey task to
other inspectors (4), amassing total billable items ( ipics), checking and
making necessary corrections on inspectors dailies, logs, and redlines,
submitting to Qwest rep and troubleshooting any construction or engineering
problem within my responsibility. R.W. Communications: ( VP Tom
Shultz 920-872-2910) (Subsidiary of Mid-States
consultants) 09-11/11-09 ·
Resident Engineer/Inspector for 16.5 m Toll Cable for Century Tel
using RUS specs ( Construction Mgr. Ken Wiles Cen-Tel 406-253-5020) ·
Rock Sawed 22000ft, Bored 2030ft & Plowed in 89000 ft of 1.25hdpe.
Installed 100pr, 200pr ( 2800ft & 4800 ft 25x24 copper) and 24 ct
f.o.c ( Entire Route) ·
Installed BDO’S , Warning Mkrs. ·
Splicing for all Cables ·
RUS 523, Cup Forms and all Redlines ·
Completed in 4.5 weeks. ·
Area Mgr: GLEN GINES
Prairie City Or. Area Mgr Glen Gines Mid
–States Consultants 503-259-3788 05/09-09/09 ·
FTTH For Oregon tel. using 515 R.U.S. SPECS ·
Placed and proofed 4 &7 way multi-duct & .75 Hdpe Service by
trench,bore,missle & plow ·
Installed mainline F.O.C. ( 144,48 ct ) , 2ct service ·
Installed Conc. MH ·
Completed all redlines for project under proposed contract time 01/09 -05/09 R.W. Communications in San
Perlita TX. Resident Engineer Gary
Greenwood 417-259-3788 R.U.S. F.T.T.H. for
Valley Telephone ·
9 mile build out for the town of San Perlita. ·
Bore and Install 24,48 96,144,216ct mainline feeder and
distribution cable in 1.25 hdpe with pop in C.O. to type 3,4,5 BDO peds and
handholes ·
Bore and plow in all 2ct service f.o.c. & mainline ·
Install type 2&7 Nids ·
All Redlines for build under proposed completion date June 0/8 to Dec. 0/8 R.W. Communication Services
L.L.C. P.O. Box
144 Eldorado
WI.
866-872-2902 ·
R.U.S . Inspection for 3rivers Telephone in Big Sky MT.; 1.) 2.7 m
of relocating and updating existing copper cable with F.O.C. 2.) Placing new
F.O.C. mainline for future FTTH . 3.) Place service Nids and cable. 4.) Build
to and into Existing C.O.’S (2). 5.) Stake for mainline and drops. December 2006 to May 2008
Telplexus Inc. 1639
Medical Ctr Pkwy St. 305
Murfreesboro Tn. 37129
(615)- 225- 5244
Supervisor: Mike Steakley (615)-556-7665 POSITION:R.U.S. Inspector for
fiber optic cable construction.Engineering staking. CONSTRUCTION DUTIES: ·
Make sure that contractor is aware of where plant is to be placed
In accordance with construction drawings and any right of way issues that
need to be complied with. ·
That contractor places plant with correct construction procedures,
i.e. boring, plowing, trench and missile into place so that cable is not
damaged and at proper specification as to depth, and desired distance from a
known point ( r.o.w. or e.o.p ). ·
Document or “redline”auctual placement of plant and any field
changes for final as-built drawings. ·
Perform shield continuity testing, power meter testing when cable
is in final resting position. ·
Locate F.O.C. when needed Engineering
Duties:
1.) Staking out future plant. This consist of where actual
placement of cable will be, and a known offset from some reference point
2.) Showing types and sizes of pedestals, handholes and number of drops
being placed in each.
3.) Stationing if needed and providing type of RUS callout for; 1)
Method of construction and distance (bore, trench, plowing, Rock footage,
concrete or asphalt cut, placing in conduit or direct buried, building
entrance, aerial placement, warning signs etc. )
4.) Placing information on existing or created drawing for
final Cadd and Q C final dwgs
5.) Meeting with any federal, state, local entities or utilities
for their requirements and for needed information in obtaining permits.
6.) Engineering or Staking aerial plant with RUS callouts ·
January 0/7- 0/9-0/7:
Inspector for Highland Telephone 37 mile RUS project in Oneida TN. For
mainline construction both direct and innerduct buried, aerial placement,
final inspection of nido placement, spot checking depths ·
October 0/7-12/07
Inspector for TDS FTTH in Knoxville Tn. ·
January 0/8- Mar. 0/8 ·
Stake out and construct drawings for RUS project phase one for
Smithfield Telephone in Bloomington IN. ·
Apr-May 08 RUS inspector for FTTH Project for Goldenbelt and Rural
Telephone in Hays Ks. EQUIPMENT PROFICINCY: ·
MIT400 Megger ·
EXFO PPM-350B Pon Power Meter ·
EXFO Fot-300 Optical Loss Test Set ·
Dynatec w/ A-Frame and houndog Locators
January 2004
to June 2006 Adesta,
L.L.C. 943 E. Hazelwood
Avenue, Bldg. 2, Rahway, NJ 07065 (732)827-0808,
ext. 115 Supervisor: G.
Ernest ~March 2003
to January 2004 Adesta -
D.C. Net Project
Construction Manager: Andy Farrell Home
(540)972-0166 Work
(703)930-6650 ·
Removed lead lines and installed 1.25 innerduct and F.O.C. utilizing
old Verizon system. ·
Engineered two laterals for Independence Airlines. Researched
right of way, determined utility conflicts, stationing and methods of
construction. ·
Created engineering and traffic control drawings for submittals to
Fairfax County, VA, with first time approvals. ·
All asbuilt and finished drawings for client. ~March 2003
to May
2003
. Adesta -
D.R.B.A. & DE Dept. of Transportation N.J.T.A.
Project
Construction Manager: G. Ernest
(732)827-0808, ext. 115 ·
Eight mile build of underground and bridge crossing (8000’ Delaware
Memorial Bridge) ·
Installed 1.25 innerduct by trenching and boring on I-295 and I-95.
Installed handholes, 4” f.r.e. with multicell conduit and junction boxes on
Delaware River crossing. ·
All asbuilts and redlines and correlation with CADD for finished
product. ~May 2003 to
October 2003 Adesta -
M.B.C. Project
Lynchburg, VA
·
300 mile build for Midatlantic Broadband Corp., 80% aerial plant, 20%
underground (u/g). ·
Did initial check of rake-off distances to bid types of footage. ·
Courthouse deed and tax map research; G.P.S. route. ·
Returned from New Jersey to engineer as needed laterals up to 3 miles. ~October 2003
to June 2006 Adesta -
Rahway, NJ ·
Qwest regen site: excavation, strip topsoil, building pad soil
resistivity test, footer and pad rebar, concrete pour, grounding ring and
testing, building and generator placement, security fencing. ·
New Jersey Turnpike Authority and Atlantic City Expressway relocates
for highway widening and new toll plazas. ·
Engineered aerial and u/g route for Conversent Communications in
Hackensack, NJ; discovered route, pole inventory, determined make ready and
material list, applications to Connective Power and Verizon entities. ·
All permits received on first time application. ·
Aerial (4.4m) u/g (0.5m) plant for above net in Pleasantville, NJ. ·
Linked security cameras for N.J.T.A Service Plazas to existing
backbone. Installed pole base, 38’ poles, cameras, jct boxes, environmental
F.O.C. equipment cabinets and electrical conduit to power source. ·
For inside plant: determined core boring locations, fiber placement,
materials such as conduit types, pull box locations to terminate in
communications room. October 2001
to April 2002 Telco
Technologies – (Out of Business) ·
Senior Inspector for all aspects of construction for u/g F.O.C.
installation for World Com in Arlington, VA. August 2000
to June
2001
Cross Country
Land Services – (Out of
Business)
10700 Corporate
Drive, Suite 100, Stafford, TX 77477 OSP Engineer for route development for 52 mile
Montgomery County, MD inner-nodal overbuild for World Com. ·
Assisted in gathering all pertinent field information for creating
construction drawings. ·
In charge of all aerial overlash build: power entity Pepco, stick
poles and create pole inventory sheets, correlating with CADD to construct
‘D’ size drawings. ·
Responsible for all traffic control plans and permits. May 2000 to
July 2000 S.E.
Technologies Moon Township,
PA ·
Level III Inspector for u/g F.O.C. install, contracted to Lightwave
Spectrum of 3901 Centerview Drive, Chantilly, VA for A.T. & T.
work. Supervisor: Glenn Winninger (703)409-2970.
September 1999 to February 2000 ~S.E.
Technologies ·
Level III Inspector. Stamford, CT to Providence, RI. ·
Route development; wetland permitting issues, courthouse research,
surveying, schematic and chaining sheets. ·
Constructed 5000’ through purchased utility ducts. Install
innerduct and fiber( 35000’) u/g street and field trenching along Metro Rail right
of way. Project Manager: Glenn Winninger March
1999 to June 1999
~S.E. Technologies - Williams Communications, Emporia-Topeka, KS. ·
Level III Inspector. ·
Inspected for directional drilling at river crossings, bridge
overpasses, underslopes, road crossings for innerduct and F.O.C. placement. ·
Plow, trenching, rock, fiber install, restoration crews. ·
As built drawings for all construction. ·
Project Manager: Glenn Winninger July
1998 to March 1999 ~S.E. Technologies ·
Hired as a Party Chief to survey pipeline and railroad right of ways
as well as construction, topographic and boundary surveys. Awards and Certificates *Adesta President’s Award –
presented to one regional or home office that generates twice as much revenue
as forecasted in original strategic plan; tripled the amount of cash
predicted in plan for 2004. *Certified in First Aid and CPR. *Safe Driving Training