Edwin L Holt
474 Hwy 71 W
STE 140-157
Bastrop, Texas 78602
214-500-5517
edholt47@gmail.com
I am willing to relocate at my own
expense and do heavy travel.
Fiber Documentation Engineer
Summary
·
Over 20 years of experience in the
telecommunication and networking field.
·
Experienced with creating outside plant drawings,
route maps and defining the scope of work.
·
Able to work independently
with minimal supervision
·
Advanced level of outside plant design knowledge
·
A self-motivated professional accustomed to
setting and attaining high goals, able to build, lead and serve on effective
teams that get the job completed.
·
Experienced in managing contractors and
responsibility for quality assurance, schedule commitments and
trouble-shooting problems.
·
Strong leadership, project management,
supervisory skills, highly organized professional.
·
Experience in Federal, State, County, City,
Institutional and Commercial construction.
·
Ability to supervise multiple mid-size projects.
·
Ability to draft construction prints using
several different methods (OPTI-NET, Visio, CAD 2011, Elations and ICGS).
·
Advanced knowledge of copper and fiber splicing
design.
·
The ability to comprehend and modify outside
plant records drawing.
·
Ability to read, write, and interpret
instructional documents
·
Have a advanced knowledge of telephone industry
standards, accessing, reading and interpreting mechanized assignment records,
PC applications
·
Recent experience with fiber cable facilities,
CALIX and ADTRAN products for delivering DSL.
Self-imposed Vacation Jun 2013 to present
Jan 2013 to Jun 2013
Finley Engineering, Bismarck, ND
Contracted to NEMONT
Project Manager
· Responsible for broadband overbuild of copper of a 24M dollar Rural
Utility Services project, utilizing Fiber to The Home (FTTH) or Fiber to the
Curb (FTTC) technologies.
· Worked with the construction contractor and the company
representatives on how and where to place the MDU and ONT
units.
· Planning and acquiring all permits from Federal, State, County and
cities needed to complete the projects
· Making sure all drafting of construction prints and maps was completed
on a timely manner.
· Good leadership skills including effective written, oral, listing
communication skills and interpersonal skills to work effectively with
outside contractors and consultants, governmental agencies, community groups
and customers.
· Manage green-field, rehabilitation, and historical sites
· Deciding how and where MDU’s should be used in the network.
· I provided a single point of contact for the resolution of all
problems
· Understanding infrastructure plans (highway, sewer, bridge, etc.) and
survey information for the elimination and prevention of conflicts with existing
and proposed underground, site obstacles, and for proper installation
location within easements and public right of way
· Lead cross functional teams to design and build scalable construction,
installation and support of all processes.
· Conducted all project meetings and was responsible for project
tracking and analysis.
· Ensured adherence to quality standards and reviewed project
deliverability.
· Managed project budgets, scheduling, planning and contractor resource
assignment and the tracking the contractor’s performance including billing
against the budget and the contract.
· Completed the projects within the allotted time lines and budget.
· Work with product suppliers to ensure material quantities are met and
ensure everything meets the company that I am contracted to design
specifications.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
· Worked with and met with the different Federal, State, county and city
governments and organization to make sure all permits and directives was
being followed by the construction contractor.
July
2012 to Jan 2013
Kenton Group, Mulberry, FL
Contracted to Century-Lind
DSL Up-grade Planner
·
Preformed all work associated with the
engineering, planning of copper, fiber distribution and fiber transmission.
·
Responsible for road widening, new road projects
and bridge relocations projects.
·
Responsible for retrofit of cross connect
cabinets with ADTRAN and CALIX units for DSL over twisted pair to the home
technologies.
·
Made sure that the tails on the cross-connect had
the right number of twist per foot to insure the electronics would work.
·
Ordered all material for the project.
·
Attended OSP FM Drafting Training
·
Attended Bid master and fireworks training.
Jan 2012 to July 2012
Mid States Consultants, Nephi, Utah
Contracted to TDS
Construction Supervision
·
Construction supervision of fiber placement to
the home.
·
Construction supervision of VDSL cabinets.
·
Construction supervision of fiber cabinets for
fiber the home.
·
Insured the adherence of all safety for the
trenching, plowing of fiber or conduit and cabinet placement.
·
Insure product deliverability.
·
Interfaced with the land owners to resolve
complaints.
·
Made sure the contractor had all permits needed,
in his possession on the jobsite.
·
Made sure the running line was adhered to.
Mar 2011 to Jan 2012
Kenton Group, Mulberry, FL
Contracted to Century-Link
OSP fiber and copper Engineer, designer engineer
Fiber and Copper
· I provided a single point of contact for the resolution of all
problems
· Lead cross functional teams to design and build scalable construction,
installation and support of all processes.
· Conducted all project meetings and was responsible for project
tracking and analysis.
· Ensured adherence to quality standards.
· Managed project budgets, scheduling, planning and contractor resource
assignment and the tracking the contractor’s performance including billing
against the budget and the contract.
· Completed the projects within the allotted time lines and budget.
· Work with product suppliers to ensure material quantities are met and
ensure everything meets the company that I am contracted to design
specifications.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
Feb
2009 to Feb 2011
Joseph
D Fail Engineering Company, Bay Springs, MS
Project
manager and Construction Manager
· Responsible for the over build of (Fiber to The Home or Fiber to the
Curb)66M dollar Rural Utility Services Project.
· Manage green-field, rehabilitation, and historical sites.
· I provided a single point of contact for the resolution of all
problems
· Lead cross functional teams to design and build scalable construction,
installation and support
· Of all processes.
· Worked with the managers of the communication company to decide when
to use a MDU or more than one ONT and the size of the MDU to be used.
· Conducted all project meetings and was responsible for project
tracking and analysis.
· Ensured adherence to quality standards and reviewed project
deliverability.
· Managed project budgets, scheduling, planning and contractor resource
assignment and the tracking the contractor’s performance including billing
against the budget and the contract.
· Completed the projects within the allotted time lines and budget.
· Work with product suppliers to ensure material quantities are met and
ensure everything meets the company that I am contracted to design
specifications.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
· Deciding how and where MDU’s should be used in the network.
· Worked with the construction contractor and the company inspectors on
where to place and how to ground the MDU and ONT units.
· Worked with the company managers to decide when and how fiber would
place to a business,
this was handled for each individual business.
· Testing of fiber optic cable.
· Survey all cables, manholes, schematic drawing, for OSP design and
planning purposes.
Jun
2007 to Feb 2009
Sudden-Link
communications
USA
Fiber
Manager
· Responsible for broadband overbuild of copper of a 24M dollar Rural
Utility Services project, utilizing Fiber to The Home (FTTH) technologies.
· Manage green-field, rehabilitation, and historical sites.
· I provided a single point of contact for the resolution of all
problems
· Lead cross functional teams to design and build scalable construction,
installation and support of all processes.
· Conducted all project meetings and was responsible for project
tracking and analysis.
· Ensured adherence to quality standards and reviewed project
deliverability.
· Managed project budgets, scheduling, planning and contractor resource
assignment and the tracking the contractor’s performance including billing
against the budget and the contract.
· Completed the projects within the allotted time lines and budget.
· Work with product suppliers to ensure material quantities are met and
ensure everything meets the company that I am contracted to design
specifications.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
· Able to do computerized drafting in several different formats
utilizing several different drafting program technologies(OPT-NET,ICGS, CAD,
VISIO, ELATIONS)
·
Experienced with creating network drawings, route
maps and defining the scope of work.
·
A self-motivated professional accustomed to
setting and attaining high goals, able to build, lead and serve on effective
teams that get the job completed.
·
Experienced in managing contractors and
responsibility for quality assurance, schedule commitments and
trouble-shooting problems.
·
Strong leadership, project management,
supervisory skills, highly organized professional.
·
Estimate the cost of all projects to be proposed
for building.
·
Manhole and conduit design
June
2005 to Jun 2007
Butler
Telecom USA
Contracted
to Verizon
(FIOS)
Planner (Verizon’s FTTC) and Customer resolution manager.
· Utilized computer drafting system ICGS, and other Verizon systems
(ISSD, BDSM, and AAIS) to plan and design Fiber to The Home for Verizon FIOS
in Dallas, Lewisville, Irving, Grapevine and Keller Exchanges.
· Planned and design fiber to the Business.
· I provided a single point of contact for the resolution of all
problems
· Lead cross functional teams to design and build scalable construction,
installation and support of all processes.
· Conducted all project meetings and was responsible for project
tracking and analysis.
· Ensured adherence to quality standards and reviewed project
deliverability.
· Managed project budgets, scheduling, planning and contractor resource
assignment and the tracking the contractor’s performance including billing
against the budget and the contract.
· Completed the projects within the allotted time lines and budget.
· Work with product suppliers to ensure material quantities are met and
ensure everything meets the company that I am contracted to design
specifications.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
· Experienced with creating network drawings, route maps and defining
the scope of work
· Working with suppliers to solve the problems of provisioning for
Multi-family units the solution to the problem would be the development of
the MDU.
· Estimate the cost of all projects proposed to be built.
May
2000 to June 2005
C T
& T Little Rock, AR, Dynamic Technical Services, Tx and Harris McBurney,
OKC, OK.
Contracted
to SWB (A T & T)
· Responsible for Engineering VRAD design package utilizing OPTI-NT
software (2004-2005) OPTI-NT provided by contracting company.
· Responsible for producing prints to cut bridge tap out of copper cable
using OPTI-NT (2004-2005). Determine capacity/exhaust and relief of existing
cross-connect cabinets.
· Determine capacity/exhaust and relief of existing cross-connect
cabinets.
· Design aerial, buried and underground fiber optic cable placement.
· Design aerial, buried and underground copper cable placement.
· Look for the best site to place pair-gain cabinets.
· Contacted
landowners and negotiated acquisition of easements.
· Contacted surveying
company to survey site.
· Checked with
surveying company to determine when survey was complete.
· Informed my SBC
Engineering Manager when survey was complete.
· Responsible for the design, construction drawings and construction
build of various road widening projects.
EDUCATION
National
Institute of Science, Bethesda MD
Associated
with the Uniformed Services University of Health Sciences
School of
Clinical Nuclear
Medicine
1976
Others schools
USAF Air
Traffic Controller School (air traffic controller 1969-1973, RAPCON and VFR
Tower)
USAF Clinical
Lab I
USAF Clinical
Lab II
USAF
Supervisors Management School
USAF Telecom
School