Michael Lowell Davis 12569
Ash St. Thornton, CO 80241, USA Tel:
+1
303 280 3985 / +1 303 653 5108 Email: michael_and_jody@msn.com Project Manager /
Senior Outside Plant Field Engineer /Telecom Plant Construction Inspector
With a Current Security Clearance I am a
Telecommunications professional with over 28 years of experience in project
management, engineering and construction in different communications
companies. Successfully designed, commissioned and operated many engineering
services and developed overall strategic plans for execution of many
projects. Actively managing day to day project responsibilities, maintenance
of reports and managing the forecast projects with finance. Areas of
Expertise: Managerial
Skills Project
Planning & ManagementManagement Development SkillsProcess Enhancement Safety
& Security Management Quality
Assurance & ControlStrategy Planning & Direction Feasibility
Analysis & PlanningResource Management Executive
Leadership Skills Vendor/Contract
ManagementChange / Risk ManagementConflict Management Training
and Development Personnel
ManagementBusiness Administration Staff
/ Team ManagementTarget / Result OrientedStress Management Functional
Skills Site
InstallationsProducts TroubleshootingImplementation of FTTP System
Configuration &InstallationCustomer AssistanceLeadership &
Supervision Process
Control Account and Business ManagementPolicy Designing Projects
SupervisionTender Preparation Complaint Resolution Risk
Analysis / AssessmentBudget Planning & AdministrationProjects Evaluation Health
& Safety AssessmentPreparation of ReportsCoordination & Follow-up Economic
AnalysisTools and Techniques KnowledgeMIS Reporting /Documentation Designing
and ConstructionNegotiation SkillsBusiness Operations Analysis Methodical
Approach to Projects Presentation SkillsAnalytical Skill Journeyman
Copper Cable SplicerProject
Management
OPE/ISP Engineering Professional Accomplishments Designed
OSP relief jobs where facilities, aerial underground and direct buried, were
in need of reinforcement for continued quality service to the customer. .,
Completed site surveys, built the SOW, MOP,BOM, and priced in
Designing BIC and AQCB jobs meet with customer POC to determine bldg
requirements for the installation Completed
inspections of FTTN and FTTP construction jobs, ie; VRADS, x-boxes,
grounding, splicing and inspected work performed on the F-2 conditioning jobs
and ensured this as per AT&T OSP standards. Reviewed and
coordinated requests for outside plant facilities necessary to support
telecommunications systems for both regulated and non-regulated divisions of
the company and developed solutions which impacted both multiple departments
and large budget expenditures. Effectively
provided expertise in an array of diverse capacities for a sizeable
telecommunications firm and delivered superior leadership, direction and
supervision to other engineering and technical personnel. Designed
Outside Plant (OSP) and Inside Plant (ISP) commercialized communications
systems to replace the Tactical, building to the I3MP standard, for the
United States Army, PM P2E (PM Power Projection Enablers), in South West Asia
(SWA). Provided complete engineering solutions by providing high level detail
designs of both Copper and Fiber Optic facilities. Career
Snapshots OSP/ISP
QA/QC/E Project
Mgr/Coordinator
March 2012/ current
Level(3) (Large Gov;t Contracts Group) /
Wavsys
California, Nevada, Utah, Colorado, Texas, Massachusetts · Perform QA/QC on the new OSP/ISP lateral builds as well as
the builds on the primary 7 sites · “Boots On the ground” On site Project Management and
Coordinator for the Level(3) Virginia PM’s · Coordinated the equipment installation, test and
turn up with the contractors and the POC at the sites · Worked with GIS-based tool Google Earth as well as Auto
Cad · OSP/ISP engineering and design review to insure
compliance to BISCI and contractual requirements, · insured ROW and RR permitting, · Worked with Level(3) Project Mgrs. and the project
contractors on the Xcel spread sheets to report project progress. (Reporting
on permits acquired or missing, road blocks, engineering and construction
complete on and off Base, due every week) Outside
Plant QA/QC
Inspector
Jan 2012 – Mar
2012
TE
Connectivity/Windstream
Clairesville Ohio/, Huntington, West Virginia · Perform QA/QC on the new Aerial, Underground and
Direct Buried of OSP and backhaul FTT build · Assisted Windstream engineers with onsite Project
Management , · Corresponding to Windstream progress and delay reporting
associated with the ‘Make Readies’ Rock and Engineering changes, Resolve the
network design conflicts complete Red Lined prints submit to Windstream
engineering · OSP engineering and design review, insured compliance to
BISCI build standards and OSHA Safety standards, · insured contractor had acquired all ROW and RR permitting,
Outside Plant
System Engineer (non_IT)
Dec 2009 – Dec 2012 Mission 1st Group Kabul, Bagram and
Kandahar, AFG · Provide support to the, Power Projection Enablers- South
West Asia (PM P2E-SWA) of the 335th in numerous Army camps in the
bases of Kabul, Bagram and Kandahar, AFG. · Planned and Designed Outside Plant (OSP) and Inside Plant
(ISP) commercial communications systems, to the I3MP standard, for the United
States Army. · Provided complete engineering solutions by providing high
level detail designs and dwgs of both Copper and Fiber Optic cables, and all
associated infrastructures, strategically placing ILA’s, Maintenance and Hand
holes, Conduit duct structure, and facilities in accordance with the required
Installation, · 2012 successful with 6 projects, $6m to $23m · Development of Statement of Work (SOW), Engineering Design
Plans (EDP), List of Materials LOM, engineering drawings, and Rough Order of
Magnitude (ROM) costing for Outside Plant (OSP) and Inside Plant (ISP)
commercialization projects. · Provide weekly project updates to PdM-P2E leadership and
Integrated Project Leads. Participate in engineering discussion groups to
determine the enterprise capability sets for the customer base by theater.
Prepare excel spreadsheets and power point presentations of present and
future projects to the Technical Management Director.. As the senior member
of the engineering team Provided cost estimates, developed work schedules,
and team development, Boarding (permitting) with NATO Base command OSP
Inspector
Feb 2008 – Dec 2008 Midstate
Consultants Prairie City Oregon
and Gallup NM · Inspected the placement of the Aerial, Direct Buried
conduit and Fiber placement on the Indian Reservation according to the scope
of the RUSS projects contract · insured the safety practices of contractor in accordance
with the OSHA Guidelines Senior Design &
Outside Plant Contract Engineer QC DATA Engineering Lead
and SPOC for VerizonJul 2007 – Feb 2008 Denver, CO
and NY, USA · OSP Engineer and SPOC · Take detailed Field Notes for Fiber Feeder and FTTP
project · Send all field notes to Denver · Receive from Denver all the prepared prints for my review
for correctness · Hand off all job packages, prints etc. from QC Data and
contractors back to Verizon Training and
Development Manager(TDM)
Feb 2007 – Aug 2007 Midstate
Consultants Waukesha, Wisconsin
· Completed inspections of FTTN and FTTP construction jobs,
ie; VRADS, x-boxes, grounding, splicing and as well as inspected work
performed on the F-2 conditioning jobs and ensured work effort was per
AT&T OSP standards Senior Design & Outside Plant Engineer Apr
2006 – Nov 2006
Mountain Ltd., Fort Collins CO · Designed F-2 relief jobs, copper and fiber, aerial
underground and direct buried · Designed New Facilities for LDA and Business Parks · Put together the work packages, the SOW, MOP,BOM, and
priced · Site surveys for new building entrance and AQCB jobs meet
with customer POC to determine bldg requirements for the installation · Site surveys for Held Service Orders Senior Design &
Outside Plant EngineerFeb 2006 – Mar 2006 Northstar
Communications, USA San Ramon, CA · Designed F-1 Fiber Feeder jobs, aerial underground and
direct buried LNO
Engineer, Senior Design & Outside Plant Engineer,Oct 1999 – Jun 2004 US
West / Qwest, Denver,CO · Designed F-2 relief jobs, copper and fiber, aerial
underground and direct buried · Designed New Facilities for LDA and Business Parks Assist
Planners and Design Eng with detailed field notes for F-1 cable and cabinets,
easements · Put together the work packages, the SOW, MOP,BOM, and
priced and Permits · Site surveys for new building entrance and AQCB jobs meet
with customer POC to determine bldg requirements for the installation · Site surveys to eliminate Held Service Orders Educational Details BS Degree Coursework Nov 1974 – May 1983 University of New Mexico, Albuquerque, New
Mexico HS Diploma Aug 1973 – May 1974 Fort Collins, Colorado, Rocky Mountain High
Professional Developments Navigator & NEAX24
Series Courses July 1994 NEC American
Training Division - Dallas, TX NEAX2400 Integrated
ACD/CCIS Installation & Maintenance July 1994 IMG (HDS) / MMG
(HDS) Installation & Maintenance Certifications: OSHA 10 hour
Industrial Safety Coarse 2012 Micro station, 2006 Local Network Pricing,
2004 Introduction to OSP-CAD, 2003 NECTAS Skills
Assessment, 2002 Customer Care Engineer, 2002Job
Distribution Systems, 2001 Multimode Fusion Splicing, 1986-1987 Single
Mode Rotary Splicing, 1986-1987 References
available upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |