From:                              route@monster.com

Sent:                               Friday, September 11, 2015 1:12 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp

 

This resume has been forwarded to you at the request of Monster User xapeix03

Arnel Acevedo 

Last updated:  08/21/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Fremont, CA  94536
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Arnel Acevedo_Telecom Engineer

Resume Value: b9jcvxusddhweayc   

  

 

ARNEL SIBAL ACEVEDO

38623 Cherry Lane                                                                                         Tel # (510) 461-2102

Fremont, CA 94536                                              E-mail address: asacevedo_19@yahoo.com

 

Summary

18 years of combined experience in the telecom industry such as Installation, Commissioning and Integration of Ericsson GSM, UMTS and LTE, Transmission Planning Engineering & Implementation and Outside Plant Engineering. Experience in team management and supervision for different transport equipment such as PDH/SDH/, Fiber Optic Cable, V-SAT and Data Communications.

 

Wireless Based Networks

AT&T CBU-DUW Modernization Certified, Alcatel Lucent 3G  Qualified Field Technician

WCDMA (UMTS) Ericsson Certified, LTE  Ericsson RBS 6000  Certified, 5 years experience in installation, commissioning, re-grooming and integration of Ericsson GSM equipment. Certified Ericsson GSM Tester, Level II, Ericsson RBS 3106, 3206,3308 ,3418,3518 and 3018 Combo UMTS (Node B), installation  and integration of Experience in installation of Nokia Ultra site BTS with Nokia PTID License No. 001EXI01639.

 

Outside Plant Engineering

Experience in OSP Engineering concepts such as Fiber to the Node (FTTN), Alcatel VRAD, designing aerial and underground fiber and copper including conduits. AT&Ts database ARES (Automated Records and Engineering Services), Oracle based JAM and Telco 11i (CFAS), LFACS and MIC (Mechanized Inventory Creation). Analyze and prepares work print for FTTN Cabinets which includes field site survey for preparation of Alcatel VRAD cabinet location (52E, 52BP, 52B and ALP-248), SAI capacity (feeder and distribution binding post), aerial and underground design facilities. Pre-post VRAD, fiber cables from FAP (Fiber Access Point) via aerial and/or underground, copper cables, conduits, inner-ducts & manhole racking details in ARES & workprint, identifies the traps, splice and FTI codes to be used on each task.

 

Transport System

Experience in installation and commissioning of  Nortel TN-1X /TN-16X (STM1-STM16),ISM 2000 Lucent and Out side Plant Access Cabinet (OPAC)

Background in Fiber Loop Technologies, Digital Loop Carriers (DLC’s) 

Experience in Microwave technology both PDH and SDH ,E1/T1 and sub-rate aggregate provisioning. Hands -on experience on Miteq E1 Radio (Australia), Lynx Radio 2xE1 Radio, AWA Plessey 4Xe1 to 16 Xe1 Radio (Australia), Fujitsu FRX SDH Radio STM-1 (Japan), DMC Radio From 2xE1 to 16xE1 Capacity, Cylink Radio from 64kbps to 256 kbps (Sub-Rate) and MDC Radio.

 

 

Detailed Experience:

 

Wireless Field Engineer

 

Directly reporting to T- Mobile Manager, RET ,Call testing / PSAP, Trouble shooting GSM/ UMTS / LTE and Alarm clearing, Installation of 7705 Alcatel Router, ALM SCANNING Installation of 6201 LTE Cabinet, Integration of LTE , Carrier Add Integration (RBS 3000 /RBS 6000), Call Test and Data Test, PSAP LIVE and PSAP SIM, GSM Consolidation , DUL TO DUS Migration, CSFB, DUL to DUS Migration, NEW SITE BUILD, Carrier Add Integration (RBS 3000 /RBS 6000), Call Test and Data Test, PSAP LIVE and PSAP SIM, GSM Consolidation, Co site between 1C, 2C, 3C, 4C and 5C to GSM, Power Conversion, LTE Integration, NEA TESTING, CSFB, P2PAMS (Amplifier) Upgrade for 3G, UCU card Upgrade, Installation of 6201 LTE Cabinet, Integration of LTE, H NET project for Verizon 7705 Router (Alcatel) installation and Commissioning, 2G cut over from existing transport to Router, Trouble shooting, Directly reporting to T- Mobile Manager, RET, Call testing / PSAP, Trouble shooting GSM/ UMTS / LMU and Alarm clearing, Installation of 7705 Alcatel Router.

ALM SCANNING, 2nd add carrier add Installation, Integration of UMTS (3106, 3206, 3308, 3418, 3018 and 3518), Call testing / PSAP, Split power cable installation  , Alarm clearing, Directly reporting to Ericsson PM, 2nd add carrier Installation, Integration of UMTS (3106, 3206, 3308, 3418, 3018 and 3518), Call testing / PSAP, Split power cable installation, Alarm clearing   ALM SCANNING, Directly reporting to Ericsson PM, Integration of UMTS (3106, 3206, 3518, 3018 and 3418), Integration of GSM (2106, 2206, 2102 and 2202), Trouble shooting and alarm clearing, Call testing, Conduct PSAP Testing, Commissioning of LMU, RAX board add, TX board add, Re grooming of GSM , Rip and Replace of 2106 with 3018 combo to 3106, Re grooming of GSM, Rip and Replace of 2106 with 3018 combo to 3106, Integration of 3106, Re integration of GSM, Trouble shooting and alarm clearing, Call testing, Directly reporting to Ericsson, Integration of UMTS (3106, 3206, 3518, 3018 and 3418), Integration of GSM (2106, 2206, 2102 and 2202, Trouble shooting and alarm clearing

 

BayanTel Inc.

Planning and Implementation Engineer 1994-2001

·               Responsible for project management and technical supervision of transmission and switching facilities projects involving the installation, testing and commissioning of SDH/SONET transmission and switch equipment such as Nortel TN-1X, TN-4X, TN-16X, Lucent’s Wavestar and ISM2000, Nortel Outside Plant Access Cabinets (OPAC), Lucent’s Hardened Remote Line Subscriber Unit (HRISLU) and Hardened Remote Access Interface Unit (HRAIU).

·               To act as a project leader in the implementation of Leased Voice & Data circuits for Private Network’s requirement

·               Works on the Commissioning of various Transmission Media via Microwave Radio, Base Band Modem, Feeder Mux, and TDM switch, V-Sat.

·               Conducts end to end transmission BER and Link integration test prior to turnover to client.

·               Responsible for the customer networking demands using Async, Sync and X.25 protocols

·               Fabricates the interface cable converter between ICC and client equipment, e.g. straight to cross cable using in a Data Terminal Equipment and Data Communication

·               Equipment thus V.35, V.11, V.24 for customer’s necessity.

·               Renders consultation services to Operations Personnel and Client in case of trouble.

 

EDUCATION

Bachelor of Science in Electronics and Communication Engineering (BSECE)    

Central Colleges of the Philippines

 

Training and Certificates

AT&T CBU-DUW Modernization Certified, Alcatel Lucent 3G  Qualified Field Technician, WCDMA (UMTS) Ericsson Certified, LTE  Ericsson RBS 6000  Certified, ARES (Automated Record and Engineering Services) – February 2007, Nokia Training on BTS Installation and Commissioning obtained Nokia PTID License No. 001EXI01639 March 2006, Extensive OJT on Nokia BTS Ultrasite Installation and Commissioning in Tri-State markets (2005), Attended Stanley Telecomm in International Communication Corporation at Antipolo    HUB Philippines conducted by Stanley Telecom.



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

 

 

Target Company:

Company Size:

Occupation:

Engineering

·         Electrical/Electronics Engineering

·         General/Other: Engineering

·         RF/Wireless Engineering

 

Target Locations:

Selected Locations:

US-CA-Oakland/East Bay